A virus disaster recovery plan framework for academic computing center
This thesis presents a Virus disaster recovery plan framework for academic computing centre. The CICT-UTM is taken as case study. The proposed framework consists of seven phases of disaster recovery plan which has been enhanced in improved by researcher based on past studies. The phases of the frame...
Saved in:
Main Author: | Gurhan, Mohamed Ismail |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/78265/1/MohamedIsmailGurhamMFC20141.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Network Disaster Recovery Plan Framework for Academic Computing Centre
by: Adibah Che Mat Daon, Mat Daon
Published: (2004) -
A proposed methodology to develop disaster recovery plan for CICT UTM
by: Sheikh Ali, Hussein Yusuf
Published: (2014) -
Disaster Recovery Test Management System (DRTEMS)
by: Zakaria, Riza Hadafi
Published: (2007) -
The redundancy-based disaster recovery framework for cloud computing
by: Sabbaghi, Fatemeh
Published: (2013) -
Disaster recovery planning : local and remote data backup system /
by: Low, Chin Seng
Published: (2000)