Sistem pengurusan kualiti : proses penyerahan tapak pembinaan

In recent years, too many construction projects developed rapidly until neglected to hand over completed construction site on time. This is due to the parties involved in the process handing over site does not have a clear knowledge about the procedure and documents required to deliver the construct...

Full description

Saved in:
Bibliographic Details
Main Author: Abu Bakar, Nur Adila
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.utm.my/id/eprint/78364/1/NurAdilaAbuMFGHT2014.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.78364
record_format uketd_dc
spelling my-utm-ep.783642018-08-26T04:53:31Z Sistem pengurusan kualiti : proses penyerahan tapak pembinaan 2014-01 Abu Bakar, Nur Adila G70.212-70.215 Geographic information system In recent years, too many construction projects developed rapidly until neglected to hand over completed construction site on time. This is due to the parties involved in the process handing over site does not have a clear knowledge about the procedure and documents required to deliver the construction site. Therefore, this research was conducted to achieve two (2) objectives related to proses hand over completed site from contractor to owner. Objective (1) is to identify a standard checklist document to be submitted during the hand over completed site and objective (2) are to develop a process of handing over completed site. Interviews and documentation analysis of expert opinion on the six (6) of case study was carried out to gather information and data to assist in achieving the objectives. It found that a set of guidelines relating to the procedures and documents required to be submitted during hand over completed site should be established as a reference to the parties involved in construction industry. By using the guidelines, it becomes clearer to the parties to follow and it will delivered on time. Finally, this study also provides some suggestions to increase the effectiveness of hand over process so that the delay on hand over completed site is not going to be severe 2014-01 Thesis http://eprints.utm.my/id/eprint/78364/ http://eprints.utm.my/id/eprint/78364/1/NurAdilaAbuMFGHT2014.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:96607 masters Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate Faculty of Geoinformation and Real Estate
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic G70.212-70.215 Geographic information system
spellingShingle G70.212-70.215 Geographic information system
Abu Bakar, Nur Adila
Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
description In recent years, too many construction projects developed rapidly until neglected to hand over completed construction site on time. This is due to the parties involved in the process handing over site does not have a clear knowledge about the procedure and documents required to deliver the construction site. Therefore, this research was conducted to achieve two (2) objectives related to proses hand over completed site from contractor to owner. Objective (1) is to identify a standard checklist document to be submitted during the hand over completed site and objective (2) are to develop a process of handing over completed site. Interviews and documentation analysis of expert opinion on the six (6) of case study was carried out to gather information and data to assist in achieving the objectives. It found that a set of guidelines relating to the procedures and documents required to be submitted during hand over completed site should be established as a reference to the parties involved in construction industry. By using the guidelines, it becomes clearer to the parties to follow and it will delivered on time. Finally, this study also provides some suggestions to increase the effectiveness of hand over process so that the delay on hand over completed site is not going to be severe
format Thesis
qualification_level Master's degree
author Abu Bakar, Nur Adila
author_facet Abu Bakar, Nur Adila
author_sort Abu Bakar, Nur Adila
title Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_short Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_full Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_fullStr Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_full_unstemmed Sistem pengurusan kualiti : proses penyerahan tapak pembinaan
title_sort sistem pengurusan kualiti : proses penyerahan tapak pembinaan
granting_institution Universiti Teknologi Malaysia, Faculty of Geoinformation and Real Estate
granting_department Faculty of Geoinformation and Real Estate
publishDate 2014
url http://eprints.utm.my/id/eprint/78364/1/NurAdilaAbuMFGHT2014.pdf
_version_ 1747817971180371968