System dynamics in project management: assessing the impacts of quality failure on project performance
It is common in pressure vessel manufacturing to face time completion issue during fabrication process. Small and Medium Enterprise (SME) also facing this difficulties as refer to their ISO audit summary. Mainly almost 50% of the projects are delivered later than the contractual dates. Common softwa...
Saved in:
Main Author: | Ibrahim, Fatin Athirah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/78569/1/FatinAthirahIbrahimMFKM2017.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A framework for assessing the viability of radio frequency identification project in healthcare sector
by: Vanany, Iwan
Published: (2011) -
Vibration induced fatigue failure in piping system
by: Yap, Weng Suon
Published: (2013) -
Vibration induced fatigue failure piping system
by: Yap, Weng Suon,
Published: (2013) -
Integrated regression and fuzzy model to determine remaining project duration
by: Scully, Clement Cornelius
Published: (2022) -
Dynamic analysis of tramcar suspension system
by: Mohamed Rehan, Muhammad Saifuddin
Published: (2006)