Time at large: implication for liquidated damages
“Time at large” is a term used to indicate that the duty to complete the works by particular time is lost. In the event of late completion, the Contractor may use “time at large” to avoid paying liquidated damages. The Contractor may argue that the duration of the contract was never established or d...
محفوظ في:
المؤلف الرئيسي: | Mustaffar Kamar, Nurul Iman |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2017
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/78907/1/NurulImanMustaffarMFAB2017.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Proof of documentation in claming extension of time
بواسطة: Wong, Ing Sing
منشور في: (2016) -
Time risk assessment framework for highway projects in Nigeria
بواسطة: Salawu, Rasheed Adewale
منشور في: (2016) -
Development of a framework of an integrated river catchment management plan for Sungai Maong watershed
بواسطة: Norina, Ak Frederick Sambang.
منشور في: (2001) -
Pendekatan penilaian untuk analisa cerun tanah
بواسطة: Zainal Abidin, Mohd. Hazreek
منشور في: (2006) -
Application of geological strength
index system for slope stability
studies of the crocker formation
in Kota Kinabalu, Sabah
بواسطة: Lee, Kiun You
منشور في: (2017)