Time at large: implication for liquidated damages
“Time at large” is a term used to indicate that the duty to complete the works by particular time is lost. In the event of late completion, the Contractor may use “time at large” to avoid paying liquidated damages. The Contractor may argue that the duration of the contract was never established or d...
Saved in:
主要作者: | Mustaffar Kamar, Nurul Iman |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2017
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/78907/1/NurulImanMustaffarMFAB2017.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Proof of documentation in claming extension of time
由: Wong, Ing Sing
出版: (2016) -
Time risk assessment framework for highway projects in Nigeria
由: Salawu, Rasheed Adewale
出版: (2016) -
Development of a framework of an integrated river catchment management plan for Sungai Maong watershed
由: Norina, Ak Frederick Sambang.
出版: (2001) -
Pendekatan penilaian untuk analisa cerun tanah
由: Zainal Abidin, Mohd. Hazreek
出版: (2006) -
Application of geological strength
index system for slope stability
studies of the crocker formation
in Kota Kinabalu, Sabah
由: Lee, Kiun You
出版: (2017)