Analysis on junction performance from 5 development at Jalan Ipoh Lumut (FT100), Manjung, Perak
Traffic Impact Assessment (TIA) is a study to review, understand and mitigate adverse traffic impact of a new development on the existing road network. TIA is usually imposed by authorities such as Public Works Department (JKR), Malaysia Highway Authorities (LLM) or local authorities as a condition...
Saved in:
Main Author: | Hashim, Rosli |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/79021/1/RosliHashimMFKA2017.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Delays at unsignalised junction
by: Ong, Hock Chye
Published: (2009) -
Users' perception and behaviour at Jalan Tapah A10, Perak
by: Sheikh Ahmad, Sheikh Luqman Aqeel
Published: (2020) -
Influence of unsignalized road junction spacing on traffic flow
by: Mohd. Salim, Noornadia Zharif
Published: (2009) -
Modelling of traffic control delays at priority junctions using artificial neural network
by: Sahraei, Mohammad Ali
Published: (2018) -
Halangan dalam penggunaan sistem binaan berindustri di kalangan kontraktor G1 dan G2 di Ipoh, Perak
by: Abdul Mutalib, Normuslizam
Published: (2020)