Selection factor to bid or not to bid for extra low voltage system (ELV) project

Improper selection of Extra Low Voltage (ELV) projects by contractors might lead to many problems including underestimating cost of the project, lack of experience and bad quality of work. ELV system requires in-depth knowledge of technologies and a strong team of domain experts, who design, integra...

Full description

Saved in:
Bibliographic Details
Main Author: Khairul Anuar, Mohamad Amir Syafiq
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81128/1/MohamadAmirSyafiqMSKA2019.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.81128
record_format uketd_dc
spelling my-utm-ep.811282019-07-24T03:34:35Z Selection factor to bid or not to bid for extra low voltage system (ELV) project 2019-01 Khairul Anuar, Mohamad Amir Syafiq TA Engineering (General). Civil engineering (General) Improper selection of Extra Low Voltage (ELV) projects by contractors might lead to many problems including underestimating cost of the project, lack of experience and bad quality of work. ELV system requires in-depth knowledge of technologies and a strong team of domain experts, who design, integrate and deliver Integrated ELV Systems that meet diverse needs. Therefore, the objectives of this study are to determine the factors of selecting an ELV Project by contractors, determine problems associated with current practice of project selection and to establish solutions that could improve future ELV projects selection. The methodology of this study will be divided into two stages which is primary data and secondary data. Secondary data will be collected by literature review by focusing on writing related materials and primary data will be collected by distributing a number of questionnaires that will determine later to selected respondents within company undertaking ELV projects. The collected data will then be analyzed using frequency distribution and average index method. The results of the study show resource pricing continuity of work/possible future project and return of investment is the most critical factors; meanwhile cost overrun, losing tender and defective works are among common problems that occurs with the current selection process; and submit the bid early, understand the client well and to sell on value are among the solutions with regard to ELV project selection criteria. The improvement will enhance business strategy for ELV contractors in project selection and future planning. 2019-01 Thesis http://eprints.utm.my/id/eprint/81128/ http://eprints.utm.my/id/eprint/81128/1/MohamadAmirSyafiqMSKA2019.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:124984 masters Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering Faculty of Engineering - School of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Khairul Anuar, Mohamad Amir Syafiq
Selection factor to bid or not to bid for extra low voltage system (ELV) project
description Improper selection of Extra Low Voltage (ELV) projects by contractors might lead to many problems including underestimating cost of the project, lack of experience and bad quality of work. ELV system requires in-depth knowledge of technologies and a strong team of domain experts, who design, integrate and deliver Integrated ELV Systems that meet diverse needs. Therefore, the objectives of this study are to determine the factors of selecting an ELV Project by contractors, determine problems associated with current practice of project selection and to establish solutions that could improve future ELV projects selection. The methodology of this study will be divided into two stages which is primary data and secondary data. Secondary data will be collected by literature review by focusing on writing related materials and primary data will be collected by distributing a number of questionnaires that will determine later to selected respondents within company undertaking ELV projects. The collected data will then be analyzed using frequency distribution and average index method. The results of the study show resource pricing continuity of work/possible future project and return of investment is the most critical factors; meanwhile cost overrun, losing tender and defective works are among common problems that occurs with the current selection process; and submit the bid early, understand the client well and to sell on value are among the solutions with regard to ELV project selection criteria. The improvement will enhance business strategy for ELV contractors in project selection and future planning.
format Thesis
qualification_level Master's degree
author Khairul Anuar, Mohamad Amir Syafiq
author_facet Khairul Anuar, Mohamad Amir Syafiq
author_sort Khairul Anuar, Mohamad Amir Syafiq
title Selection factor to bid or not to bid for extra low voltage system (ELV) project
title_short Selection factor to bid or not to bid for extra low voltage system (ELV) project
title_full Selection factor to bid or not to bid for extra low voltage system (ELV) project
title_fullStr Selection factor to bid or not to bid for extra low voltage system (ELV) project
title_full_unstemmed Selection factor to bid or not to bid for extra low voltage system (ELV) project
title_sort selection factor to bid or not to bid for extra low voltage system (elv) project
granting_institution Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering
granting_department Faculty of Engineering - School of Civil Engineering
publishDate 2019
url http://eprints.utm.my/id/eprint/81128/1/MohamadAmirSyafiqMSKA2019.pdf
_version_ 1747818308654071808