Selection factor to bid or not to bid for extra low voltage system (ELV) project
Improper selection of Extra Low Voltage (ELV) projects by contractors might lead to many problems including underestimating cost of the project, lack of experience and bad quality of work. ELV system requires in-depth knowledge of technologies and a strong team of domain experts, who design, integra...
Saved in:
主要作者: | Khairul Anuar, Mohamad Amir Syafiq |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2019
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/81128/1/MohamadAmirSyafiqMSKA2019.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Construction bid model for residential building projects in Dubai
由: Al Janabi, Tamadhur H. F.
出版: (2018) -
Predicting the performance of design-bid-build projects: a neural-network based approach
由: Tan, Caren Cai Loon
出版: (2006) -
Procurement methods and contractor's bidding strategy in Middle East construction industry
由: Amirsoleimani, Omidreza
出版: (2014) -
Implementation of ISO 9001:2000 quality management system for construction biddings procedures in construction management practice
由: Youceff, Berreksi
出版: (2006) -
The effect of thermal ageing on low voltage cross-linked polyethylene insulated cable
由: Hamdi, Noor Faezah
出版: (2019)