Selection factor to bid or not to bid for extra low voltage system (ELV) project
Improper selection of Extra Low Voltage (ELV) projects by contractors might lead to many problems including underestimating cost of the project, lack of experience and bad quality of work. ELV system requires in-depth knowledge of technologies and a strong team of domain experts, who design, integra...
Saved in:
Main Author: | Khairul Anuar, Mohamad Amir Syafiq |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/81128/1/MohamadAmirSyafiqMSKA2019.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction bid model for residential building projects in Dubai
by: Al Janabi, Tamadhur H. F.
Published: (2018) -
Predicting the performance of design-bid-build projects: a neural-network based approach
by: Tan, Caren Cai Loon
Published: (2006) -
Procurement methods and contractor's bidding strategy in Middle East construction industry
by: Amirsoleimani, Omidreza
Published: (2014) -
Implementation of ISO 9001:2000 quality management system for construction biddings procedures in construction management practice
by: Youceff, Berreksi
Published: (2006) -
The effect of thermal ageing on low voltage cross-linked polyethylene insulated cable
by: Hamdi, Noor Faezah
Published: (2019)