Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant

In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...

Full description

Saved in:
Bibliographic Details
Main Author: Saw, Ping Lih
Format: Thesis
Language:English
Published: 2016
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81429/1/SawPingLihMFKM2016.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.81429
record_format uketd_dc
spelling my-utm-ep.814292019-08-23T04:07:22Z Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant 2016 Saw, Ping Lih TJ Mechanical engineering and machinery In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected. In this paper, RBI study performed on 114 unfired pressure vessels components for Unipol Polyethylene Plant. Risk assessment performed and determines the risk ranking. Inspection plan developed base on the risk assessment result. The risk-based inspection plan compared with conventional inspection plan i.e. API 510’s inspection intervals. This thesis will summarize the fundamental steps for API 580 Risk-Based Inspection methodology, i.e. the risk calculation and assessment, evaluated the damage mechanism via the corrosion loops, and the inspection technologies. 2016 Thesis http://eprints.utm.my/id/eprint/81429/ http://eprints.utm.my/id/eprint/81429/1/SawPingLihMFKM2016.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:120279 masters Universiti Teknologi Malaysia Mechanical Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Saw, Ping Lih
Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
description In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected. In this paper, RBI study performed on 114 unfired pressure vessels components for Unipol Polyethylene Plant. Risk assessment performed and determines the risk ranking. Inspection plan developed base on the risk assessment result. The risk-based inspection plan compared with conventional inspection plan i.e. API 510’s inspection intervals. This thesis will summarize the fundamental steps for API 580 Risk-Based Inspection methodology, i.e. the risk calculation and assessment, evaluated the damage mechanism via the corrosion loops, and the inspection technologies.
format Thesis
qualification_level Master's degree
author Saw, Ping Lih
author_facet Saw, Ping Lih
author_sort Saw, Ping Lih
title Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
title_short Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
title_full Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
title_fullStr Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
title_full_unstemmed Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
title_sort development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
granting_institution Universiti Teknologi Malaysia
granting_department Mechanical Engineering
publishDate 2016
url http://eprints.utm.my/id/eprint/81429/1/SawPingLihMFKM2016.pdf
_version_ 1747818329598328832