Improving water meter reading operations using optimization techniques for Syarikat Air Johor

Water meter distribution network is a challenge for decision makers to choose the best route during water bill distribution to ensure all places are visited without skipping any consumer’s house. In particular, rural areas are more challenging as compared to urban areas because there are a lot of ba...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamad Ali, Nurhasyimah
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.utm.my/id/eprint/81487/1/NurhasyimahMohamadAliMFKM2015.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.81487
record_format uketd_dc
spelling my-utm-ep.814872019-08-23T05:19:07Z Improving water meter reading operations using optimization techniques for Syarikat Air Johor 2015 Mohamad Ali, Nurhasyimah TJ Mechanical engineering and machinery Water meter distribution network is a challenge for decision makers to choose the best route during water bill distribution to ensure all places are visited without skipping any consumer’s house. In particular, rural areas are more challenging as compared to urban areas because there are a lot of barriers or challenges faced by meter reader during water bill reading process. Based on observation and interview session there are four factors causing the problem during meter reading process which are geographic factor, human factor, machine factor and external factor. Furthermore, meter reading department needs to complete their task within a specific time frame which is in between 29 to 30 days for all consumers (58587 registered accounts). If billing days are less than 29 days the effect is profit to Syarikat Air Johor (SAJ), if more than 30 days SAJ will lose the profit. Win-win situation for SAJ and customers will happen if the billing days are exactly 30 days. Currently SAJ Kota Tinggi is unable to comply with this requirement. Overdue cycle is a financial lost to the company and early reading is a financial lost to the customers. The purpose of this study is to propose an optimum assignment and route for meter readers. Technique based on travelling salesman problem and assignment problem were used in this study. Evaluations were made using travelling salesman problem method and minimum spanning tree as a comparison for total time, sequence path and estimation time analysis. The findings suggest that the travelling salesman problem provided a minimum total time compared with minimum spanning tree and the current practice for both rural and urban areas covered in this study. In terms of estimated reading time, the result suggests 99% probability that meter reading task can be completed in 205 minutes for 175 rural areas consumers and 126 minutes for 167 urban areas consumers. 2015 Thesis http://eprints.utm.my/id/eprint/81487/ http://eprints.utm.my/id/eprint/81487/1/NurhasyimahMohamadAliMFKM2015.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:120240 masters Universiti Teknologi Malaysia Mechanical Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TJ Mechanical engineering and machinery
spellingShingle TJ Mechanical engineering and machinery
Mohamad Ali, Nurhasyimah
Improving water meter reading operations using optimization techniques for Syarikat Air Johor
description Water meter distribution network is a challenge for decision makers to choose the best route during water bill distribution to ensure all places are visited without skipping any consumer’s house. In particular, rural areas are more challenging as compared to urban areas because there are a lot of barriers or challenges faced by meter reader during water bill reading process. Based on observation and interview session there are four factors causing the problem during meter reading process which are geographic factor, human factor, machine factor and external factor. Furthermore, meter reading department needs to complete their task within a specific time frame which is in between 29 to 30 days for all consumers (58587 registered accounts). If billing days are less than 29 days the effect is profit to Syarikat Air Johor (SAJ), if more than 30 days SAJ will lose the profit. Win-win situation for SAJ and customers will happen if the billing days are exactly 30 days. Currently SAJ Kota Tinggi is unable to comply with this requirement. Overdue cycle is a financial lost to the company and early reading is a financial lost to the customers. The purpose of this study is to propose an optimum assignment and route for meter readers. Technique based on travelling salesman problem and assignment problem were used in this study. Evaluations were made using travelling salesman problem method and minimum spanning tree as a comparison for total time, sequence path and estimation time analysis. The findings suggest that the travelling salesman problem provided a minimum total time compared with minimum spanning tree and the current practice for both rural and urban areas covered in this study. In terms of estimated reading time, the result suggests 99% probability that meter reading task can be completed in 205 minutes for 175 rural areas consumers and 126 minutes for 167 urban areas consumers.
format Thesis
qualification_level Master's degree
author Mohamad Ali, Nurhasyimah
author_facet Mohamad Ali, Nurhasyimah
author_sort Mohamad Ali, Nurhasyimah
title Improving water meter reading operations using optimization techniques for Syarikat Air Johor
title_short Improving water meter reading operations using optimization techniques for Syarikat Air Johor
title_full Improving water meter reading operations using optimization techniques for Syarikat Air Johor
title_fullStr Improving water meter reading operations using optimization techniques for Syarikat Air Johor
title_full_unstemmed Improving water meter reading operations using optimization techniques for Syarikat Air Johor
title_sort improving water meter reading operations using optimization techniques for syarikat air johor
granting_institution Universiti Teknologi Malaysia
granting_department Mechanical Engineering
publishDate 2015
url http://eprints.utm.my/id/eprint/81487/1/NurhasyimahMohamadAliMFKM2015.pdf
_version_ 1747818342162366464