Key performance indicators for value management implementation in construction industry
Today, Value Management (VM) is an approach that has been widely used by various industries in managing their projects or programs to get the best value. In reaping the advantages of the VM implementation, Malaysia is no exception to implement the VM in construction projects, especially for projects...
محفوظ في:
المؤلف الرئيسي: | Abd. Kadir, Muhammad Adam |
---|---|
التنسيق: | أطروحة |
اللغة: | English |
منشور في: |
2013
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://eprints.utm.my/id/eprint/81573/1/MuhammadAdamAbdMFKA2013.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Conceptual framework of key performance indicator for industralised building system project in Malaysia
بواسطة: Yan, Kim Leong
منشور في: (2017) -
Formulation of key performance indicators through implementation of private finance initiatives (PFI) in student hostel privatisation at Universiti Teknikal Malaysia Teknikal
بواسطة: Anang Masuri, Mohd. Rayme
منشور في: (2009) -
Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
بواسطة: Loh, Seng Yap
منشور في: (2019) -
Performance indicators analysis for contractors in Malaysian housing construction projects
بواسطة: Lee, Mao Rui
منشور في: (2020) -
Issues and challenges to implement BIM for SMEs in the construction industry
بواسطة: Abd. Rahman, Radziah
منشور في: (2020)