Key performance indicators for value management implementation in construction industry
Today, Value Management (VM) is an approach that has been widely used by various industries in managing their projects or programs to get the best value. In reaping the advantages of the VM implementation, Malaysia is no exception to implement the VM in construction projects, especially for projects...
Saved in:
主要作者: | Abd. Kadir, Muhammad Adam |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2013
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/81573/1/MuhammadAdamAbdMFKA2013.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Conceptual framework of key performance indicator for industralised building system project in Malaysia
由: Yan, Kim Leong
出版: (2017) -
Formulation of key performance indicators through implementation of private finance initiatives (PFI) in student hostel privatisation at Universiti Teknikal Malaysia Teknikal
由: Anang Masuri, Mohd. Rayme
出版: (2009) -
Key factors affecting the adaptation of prefabricated prefinished volumetric construction (PPVC) in Malaysia industry
由: Loh, Seng Yap
出版: (2019) -
Performance indicators analysis for contractors in Malaysian housing construction projects
由: Lee, Mao Rui
出版: (2020) -
Issues and challenges to implement BIM for SMEs in the construction industry
由: Abd. Rahman, Radziah
出版: (2020)