Ground improvement for ring beam tank foundation compared between vibro replacement against combination of dynamic techniques with numerical models
Construction of large tanks are often carried out implementing a ring beam foundation. Majority of the load is transferred the ground, therefore, in areas of poor ground conditions, additional measures are taken to avoid geotechnical failure. Various methods exist for ground improvement, however, te...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2019
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/85740/1/AdilKhanMSKA2019.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!