Improvement of the upstream project valuation in consideration of abandonment expenditure uncertainties
This study intends to propose parameter adjustment for economic evaluation in considering abandonment expenditures (ABEX) during front end loading (FEL) of discovered petroleum resources. In maturing a petroleum field development, abandonment and decommissioning of wells and facilities requires cons...
Saved in:
Main Author: | Abu Bakar, Azureen Alya |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/85775/1/AzureenAlyaAbuBakarMSChE2019.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of a data integrate tool for cement plug and abandonment
by: Jamalluddin, Nazariah
Published: (2021) -
Optimal heat exchanger network synthesis with operability and safety consideration
by: Hafizan, Ainur Munirah
Published: (2015) -
Evaluation of optimal cooling control for seeded batch crystallization inclusive dissolution with uncertainties
by: Siti Zubaidah, Adnan
Published: (2020) -
A new tuning method for two-degree-of-freedom internal model control under parametric uncertainty
by: Juwari
Published: (2011) -
Highly sulfonated polyphenylsulfone nanocomposite membranes for improving proton exchange membrane fuel cell performance
by: Mohamad Nor, Nor Azureen
Published: (2020)