Logistic management in industrialized building system

The Industrialized Building System (IBS) is a building technique where the construction date can be shortened because IBS components and framework are made from the factory. Nevertheless, the problem lies in implementing IBS by moving materials and structure to the construction site. The IBS '...

全面介紹

Saved in:
書目詳細資料
主要作者: Mohamed, Masarizan
格式: Thesis
語言:English
出版: 2020
主題:
在線閱讀:http://eprints.utm.my/id/eprint/85928/1/MasarizanMohamedMSKA2020.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!