Partial replacement of normal sand with garnet waste for bedding sand layer of concrete block pavement
Highway construction use river sand as a part of the materials. Due to fast developments, normal sand demand is increase and over exploited in construction. The increase in rate leads to increase in demand for raw materials which in turn leads to price hike of raw materials. Therefore this research...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2017
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/86031/1/MohdZawawivAzizMFKA2017.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|