Contract in telecommunication infrastructure project

It is unavoidable that during the construction process, a dispute on the insufficiency of contract document often arose. However, the insufficiency of the clauses in the contract is uncommon. The drafted contract must fulfill all the intended roles and guidelines for the relationships between the co...

Full description

Saved in:
Bibliographic Details
Main Author: Abd. Rani, Suryyany
Format: Thesis
Language:English
Published: 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/87120/1/SuryyanyAbdRaniMFAB2017.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.87120
record_format uketd_dc
spelling my-utm-ep.871202020-11-30T08:56:45Z Contract in telecommunication infrastructure project 2017 Abd. Rani, Suryyany NA9000-9284 City planning It is unavoidable that during the construction process, a dispute on the insufficiency of contract document often arose. However, the insufficiency of the clauses in the contract is uncommon. The drafted contract must fulfill all the intended roles and guidelines for the relationships between the contracting parties throughout the project. Apart from that, all the project needs and requirements should be also included in the contract to optimize the usage of the contract for the project and to ensure the contract is more comprehensive. Therefore, this research aims to identify insufficient clauses in the contract for telecommunication infrastructure project. A structured interview is performed with the stakeholder in telecommunication infrastructure project to established issues and problems that occur due to insufficient clauses in the contract documents. The data is collected mainly through documentary analyses, which consist of contract documents for telecommunication infrastructure project. From the findings, seven clauses have been identified as insufficient based on the issues and problems, which arose during the execution of work and the needs and requirement of telecommunication infrastructure project. From the analysis, it was also found that the contract is not only insufficient in the contract clauses, but it also in the interpretations of the clauses of contract documents. Some recommendation has been suggested to Network Facilities Provider as the client to enhance the contract documents for telecommunication infrastructure project. From the recommendations being made, the interest and rights of both parties in the contract can be protected. It also helps to minimize disputes between Network Facilities Provider and a Full Turnkey Contractors and to optimize the productivity of the project. 2017 Thesis http://eprints.utm.my/id/eprint/87120/ http://eprints.utm.my/id/eprint/87120/1/SuryyanyAbdRaniMFAB2017.pdf application/pdf en public masters Universiti Teknologi Malaysia, Faculty of Built Environment Faculty of Built Environment
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic NA9000-9284 City planning
spellingShingle NA9000-9284 City planning
Abd. Rani, Suryyany
Contract in telecommunication infrastructure project
description It is unavoidable that during the construction process, a dispute on the insufficiency of contract document often arose. However, the insufficiency of the clauses in the contract is uncommon. The drafted contract must fulfill all the intended roles and guidelines for the relationships between the contracting parties throughout the project. Apart from that, all the project needs and requirements should be also included in the contract to optimize the usage of the contract for the project and to ensure the contract is more comprehensive. Therefore, this research aims to identify insufficient clauses in the contract for telecommunication infrastructure project. A structured interview is performed with the stakeholder in telecommunication infrastructure project to established issues and problems that occur due to insufficient clauses in the contract documents. The data is collected mainly through documentary analyses, which consist of contract documents for telecommunication infrastructure project. From the findings, seven clauses have been identified as insufficient based on the issues and problems, which arose during the execution of work and the needs and requirement of telecommunication infrastructure project. From the analysis, it was also found that the contract is not only insufficient in the contract clauses, but it also in the interpretations of the clauses of contract documents. Some recommendation has been suggested to Network Facilities Provider as the client to enhance the contract documents for telecommunication infrastructure project. From the recommendations being made, the interest and rights of both parties in the contract can be protected. It also helps to minimize disputes between Network Facilities Provider and a Full Turnkey Contractors and to optimize the productivity of the project.
format Thesis
qualification_level Master's degree
author Abd. Rani, Suryyany
author_facet Abd. Rani, Suryyany
author_sort Abd. Rani, Suryyany
title Contract in telecommunication infrastructure project
title_short Contract in telecommunication infrastructure project
title_full Contract in telecommunication infrastructure project
title_fullStr Contract in telecommunication infrastructure project
title_full_unstemmed Contract in telecommunication infrastructure project
title_sort contract in telecommunication infrastructure project
granting_institution Universiti Teknologi Malaysia, Faculty of Built Environment
granting_department Faculty of Built Environment
publishDate 2017
url http://eprints.utm.my/id/eprint/87120/1/SuryyanyAbdRaniMFAB2017.pdf
_version_ 1747818524954329088