Recovery of damages beyond the limit of unenforceable liquidated damages clause
Standard forms of construction contracts typically include a liquidated damages provision entitling the employer a specified sum if the contractor is late in completing a work. However, such clause can be unenforceable due to a myriad of reasons, such as when time is at large. If that happens, the e...
Saved in:
主要作者: | Zainudin, Zulhilmi |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2017
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/87198/1/ZulhilmiZainuddinMFAB2017.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Notice condition precedent to claim liquidated ascertained damages (LAD)
由: Mansor, Nur Syaimasyaza
出版: (2011) -
Application of good faith as necessary limits in exercising the termination for convenience clause
由: Nik Abdullah, Nik Abdul Hafiz
出版: (2015) -
Remoteness of damage in breach of contract
由: W. Mohd. Shaupil, W. Mohd. Haniff
出版: (2008) -
Global claims for damages in construction contracts
由: Han, Siew Hee
出版: (2011) -
Measure of damages for defective building work
由: Wong, Bi Xia
出版: (2009)