Pre-contract cost management:|ba study on risk management and its effect towards costs
Budget preparation of a project during pre-contract stage is very crucial because it is the stage where the client need to substantiate whether their objective is within their financial capability. In case that it is beyond their budget, then there are methods to adjust in accord. This is a concern...
Saved in:
Main Author: | Mohd. Kassim, Nazirul Fariq |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/91890/1/NazirulFariqMohdMFKA2018.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pre-contract cost management: a study on risk management and its effect towards costs
by: Mohd. Kassim, Nazirul Fariq
Published: (2018) -
Safety cost in pre-cast concrete construction
by: Alashwal, Mohammed Taher
Published: (2008) -
Evaluation of cost-plus contract at Universiti Teknologi Malaysia, Skudai, Johore
by: Mohamad, Ahmad Nasir
Published: (1990) -
Collaborative usage of ICT DBMS in construction cost control : the post contract perspectives
by: Bandi, Shamsul Hadi
Published: (2008) -
Life cycle cost risk calculator for green highway criteria
by: Abd. Rahman, Muhammad Faiz
Published: (2022)