APA引文

Lee, Y. L. (2020). Ground improvement on land reclamation project-prefabricated vertical drain with pre-loading.

Chicago Style (17th ed.) Citation

Lee, Yoon Leong. Ground Improvement on Land Reclamation Project-prefabricated Vertical Drain with Pre-loading. 2020.

MLA引文

Lee, Yoon Leong. Ground Improvement on Land Reclamation Project-prefabricated Vertical Drain with Pre-loading. 2020.

警告:这些引文格式不一定是100%准确.