Enforceability of the liquidated and ascertained damages and effect of section 75 contracts ACT 1950
The usual redress awarded to the employer in the event of a breach of contract due to late completion will be in the form of liquidated damages. Liquidated damages, or commonly known as Liquidated and Ascertained Damages, abbreviated as ‘LAD’ is sought as the sequel to a non-completion of work. The...
Saved in:
主要作者: | Mohamad, Shazlimanshah |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2019
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/92717/1/ShazlimanshahMohamadMFABU2019.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Smart contract in Malaysia Construction Industry
由: Mohamad Hidhir, Syarafina Adizah
出版: (2021) -
Interpretation of contracts : admissibility of pre-contractual negotiations
由: Mohamad Khairuddi, Muhammad Khawarizmi
出版: (2019) -
The profile of breaches of contract in construction industry
由: Zainudin, Farah Liyana
出版: (2019) -
Profiling of termination grounds in construction contract
由: Liew, Sock Tin
出版: (2018) -
Validity issues of variation order in construction contracts
由: Mazahar, Norazilan
出版: (2019)