Reservoir productivity restoration in dual-string completion well using perforation method
A sudden drop of production rate can happened due to formation damage, mechanical failure and others unprecedented problems. Selecting the suitable well stimulation method to treat the unproductive reservoir or to restore the reservoir productivity for a dual-string completion well which have multip...
Saved in:
Main Author: | Harison, Ammar Zarir |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/93104/1/AmmarZarirMSChE2014.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Estimation of sand production volume for weak to moderate strength sandstone reservoir using finite element method
by: Subbiah, Surej Kumar
Published: (2022) -
Comparing driller’s and engineer’s methods to control kick for basement reservoirs
by: Sharafaddin, Osama
Published: (2019) -
Comparing driller's and engineer's methods to control kick for basement reservoirs
by: Sharafaddin, Osama
Published: (2018) -
Method comparison for water saturation estimation in shaly sand reservoir for Field X
by: Wan Zairudin, Wan Ahmad Rafael
Published: (2020) -
Next generation intelligent completions for multi-stacked brownfield in Malaysia
by: P. Mosar, Nur Faizah
Published: (2019)