Effect of adopting different dispatching rules on the mean flow time in a two machine batch-shop problem
The two-machine flow shop problem was shown to be NP-hard when the objective is to minimize total (mean) completion time instead of makespan even for the case where setup times are neglected. This means that it is highly unlikely to find a polynomial algorithm to solve the problem. Therefore, resear...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
语言: | English |
出版: |
2005
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/9500/1/HazirFaroukAbdelraheemMFKM2005.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
成为第一个发表评论!