Contractual requirement list for project data management system and software testing activities
Requirements gathering have always been critical phase in the implementation of high quality software systems. A good requirement gathering in early stages of Software Development Life Cycle (SDLC) will ensure the quality of product produced and prevent defect at later stages of SDLC, hence reducing...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/9529/1/HairulAnwarDahalanMFSKSM2008-abstract.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-utm-ep.9529 |
---|---|
record_format |
uketd_dc |
spelling |
my-utm-ep.95292018-07-19T01:51:18Z Contractual requirement list for project data management system and software testing activities 2008-10 Dahalan, Hairul Anwar QA76 Computer software Requirements gathering have always been critical phase in the implementation of high quality software systems. A good requirement gathering in early stages of Software Development Life Cycle (SDLC) will ensure the quality of product produced and prevent defect at later stages of SDLC, hence reducing cost. In ensuring requirements are grip properly at early stages of SDLC, verification process will take place. As the project progresses, validation process are performs to ensure the product do what the user really requires. This project report will describe preparation of Contractual Requirement Document (CRL) and how verification process will took place to conform to its requirements. In addition, testing activities which is part of validation process is also discussed in this thesis. 2008-10 Thesis http://eprints.utm.my/id/eprint/9529/ http://eprints.utm.my/id/eprint/9529/1/HairulAnwarDahalanMFSKSM2008-abstract.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:846?site_name=Restricted Repository masters Universiti Teknologi Malaysia, Faculty of Computer Science and Information System Faculty of Computer Science and Information System Bezier,B.(1990). Software Testing Techniques. 2nd Edition. New York: Van Nostrand Rheinhold. Boehm, Barry W. (1981) Software Engineering Economics. Englewood Cliffs, NJ: Prentice-Hall, 1981 CMSB Website.World Wide Web: http://custommedia.com.my CMSB Incident Report CMSB Test Result Form CMSB UIT Test Plan Version 1.0.0 CMSB PINTAS Product Overview Version 1.0.0 Jones, C. (1996). By popular demand: Software estimating rules of thumb. Software Productivity Research Institute, Burlington MA. IEEE (1991). Standard for Software Test Documentation. IEEE/ANSI Std 829-1983 Longstreet,D.(2002). Estimating Software Test Case and Defect With Function Points. Longstreet Consulting Inc. Blue Springs, MO Roberto, Meli and Santillo, Luca .(2000). Function Point Estimation Methods: A Comparative Overview. Data Processing Organization. Rosenberg, Linda H. et al, (1998). Requirements, Testing, and Metrics. NASA Goddard space Flight Center, Washington DC. Sakinah Ali Pitcahy (2006). Implementation Software Testing Life Cycle For CoRNEA (Integrated School Management System).Universiti Teknologi Malaysia:Master Thesis. Sommerville, I. (2004). Software Engineering. Seventh Edition. England:Pearson Addison Wesley. 516-520, 550 Veenendaal, E.V.(2007).Standard glossary of terms used in Software Testing. International Software Testing Qualifications Board (ISTQB).Netherlands |
institution |
Universiti Teknologi Malaysia |
collection |
UTM Institutional Repository |
language |
English |
topic |
QA76 Computer software |
spellingShingle |
QA76 Computer software Dahalan, Hairul Anwar Contractual requirement list for project data management system and software testing activities |
description |
Requirements gathering have always been critical phase in the implementation of high quality software systems. A good requirement gathering in early stages of Software Development Life Cycle (SDLC) will ensure the quality of product produced and prevent defect at later stages of SDLC, hence reducing cost. In ensuring requirements are grip properly at early stages of SDLC, verification process will take place. As the project progresses, validation process are performs to ensure the product do what the user really requires. This project report will describe preparation of Contractual Requirement Document (CRL) and how verification process will took place to conform to its requirements. In addition, testing activities which is part of validation process is also discussed in this thesis. |
format |
Thesis |
qualification_level |
Master's degree |
author |
Dahalan, Hairul Anwar |
author_facet |
Dahalan, Hairul Anwar |
author_sort |
Dahalan, Hairul Anwar |
title |
Contractual requirement list for project data management system and software testing activities |
title_short |
Contractual requirement list for project data management system and software testing activities |
title_full |
Contractual requirement list for project data management system and software testing activities |
title_fullStr |
Contractual requirement list for project data management system and software testing activities |
title_full_unstemmed |
Contractual requirement list for project data management system and software testing activities |
title_sort |
contractual requirement list for project data management system and software testing activities |
granting_institution |
Universiti Teknologi Malaysia, Faculty of Computer Science and Information System |
granting_department |
Faculty of Computer Science and Information System |
publishDate |
2008 |
url |
http://eprints.utm.my/id/eprint/9529/1/HairulAnwarDahalanMFSKSM2008-abstract.pdf |
_version_ |
1747814747719335936 |