Variation and its valuation in design-build contract with regard to the public sector of Malaysia
Previous studies have shown that using a design-build approach may help keep costs down and avoid or significantly reduce the number of variation orders required. Despite this, there is always the possibility for variation to occur. According to the Auditor-General’s Report 2018, several design-buil...
Saved in:
主要作者: | Ismail, Nazaitul Hazira |
---|---|
格式: | Thesis |
語言: | English |
出版: |
2022
|
主題: | |
在線閱讀: | http://eprints.utm.my/id/eprint/99667/1/NazaitulHaziraIsmailMFABU2022.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Variation orders in design and build contracts
由: Heng, Robert Wei Kiong
出版: (2009) -
Valuation of interim payment : contract terms and statutes
由: Nayan, Roselan
出版: (2010) -
Disputes in design and build construction contract
由: Jasri, Siti Aishah Aqilah
出版: (2011) -
Variation order in lump sum contract
由: Mohayidin, Noor Amalina
出版: (2014) -
Awareness level among valuation practitioners on the use of the Geographic Information System (GIS) in real estate valuation / Nur Izzati Ridzuan
由: Ridzuan, Nur Izzati
出版: (2023)