Barriers of communication in managing Industrialised Building System (IBS) projects in the northern region of Malaysia: Virtual team communication practices
Communication issue is one of the challenges faced by the current Malaysian construction projects particularly those with the Industrialized Building System (IBS). During the implementation of IBS project, fragmentation process that takes place in project execution has led to major problems in commu...
Saved in:
Main Author: | Mohd Affendi, Ahmad Pozin |
---|---|
Format: | Thesis |
Language: | eng eng eng eng |
Published: |
2018
|
Subjects: | |
Online Access: | https://etd.uum.edu.my/10134/1/kebenaran%20mendeposit-tidak%20membenarkan-817571.pdf https://etd.uum.edu.my/10134/9/s817571_01.pdf https://etd.uum.edu.my/10134/8/s817571_02.pdf https://etd.uum.edu.my/10134/4/s817571_references.docx |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Applying value stream mapping in measuring
software team performance through task monitoring
by: Ku Munirah, Ku Aman
Published: (2014) -
Information and communication technology adoption among small and medium enterprises in the northern region of Malaysia
by: Mathivannan, Jaganathan
Published: (2019) -
Understanding the process of cross-cultural code switching of global virtual teams in knowledge sharing
by: Nursakirah, Ab Rahman Muton
Published: (2022) -
Strategic Role of Information Technology Towards Building Competitive Advantage Study in Yemen (Southern Region)
by: Banalzwaa, Hamad Salmen Saeed
Published: (2011) -
An embedding traid-bit method to improve the performance of Arabic text steganography
by: Thabit, Reema Ahmed Abdalla
Published: (2016)