Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes

Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang...

Full description

Saved in:
Bibliographic Details
Main Author: Rosshairy, Abd. Rahman
Format: Thesis
Language:eng
eng
Published: 2003
Subjects:
Online Access:https://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf
https://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uum-etd.1210
record_format uketd_dc
spelling my-uum-etd.12102013-07-24T12:10:56Z Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes 2003-08-10 Rosshairy, Abd. Rahman Sekolah Siswazah Graduate School HD56-57.5 Industrial Productivity Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang Gula FELDA Perlis. Since there was no previous study done, partial and multifactor productivity are used in determining a suitable index for measuring productivity level on the production end of KGFP. Multifactor productivity has been determined as a suitable measuring index for productivity level at KGFP. Shift productivity and work group are also being analyzed using three-month worth of data that begins on January 2002 and ends on March 2002. This study has shown that workers on the afternoon shift from 3.00pm to 11.OOpm have the highest productivity yield. However, the difference in productivity value between the three shifts is very small. As for shift groups, group A has shown the highest productivity level followed by group C and B respectively. Next, regression analysis is done to determine the factor that relates to the productivity. Result from this analysis has shown that raw material and salary gives a significant value towards the output. 2003-08 Thesis https://etd.uum.edu.my/1210/ https://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf application/pdf eng validuser https://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf application/pdf eng public masters masters Universiti Utara Malaysia
institution Universiti Utara Malaysia
collection UUM ETD
language eng
eng
topic HD56-57.5 Industrial Productivity
spellingShingle HD56-57.5 Industrial Productivity
Rosshairy, Abd. Rahman
Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
description Production is one of the issues that are continuously being monitored. Thus, a case study is being done on the productivity of the production end of a factory that produces sieved sugar as its final product. This research is mainly to study the level of productivity in the production end of Kilang Gula FELDA Perlis. Since there was no previous study done, partial and multifactor productivity are used in determining a suitable index for measuring productivity level on the production end of KGFP. Multifactor productivity has been determined as a suitable measuring index for productivity level at KGFP. Shift productivity and work group are also being analyzed using three-month worth of data that begins on January 2002 and ends on March 2002. This study has shown that workers on the afternoon shift from 3.00pm to 11.OOpm have the highest productivity yield. However, the difference in productivity value between the three shifts is very small. As for shift groups, group A has shown the highest productivity level followed by group C and B respectively. Next, regression analysis is done to determine the factor that relates to the productivity. Result from this analysis has shown that raw material and salary gives a significant value towards the output.
format Thesis
qualification_name masters
qualification_level Master's degree
author Rosshairy, Abd. Rahman
author_facet Rosshairy, Abd. Rahman
author_sort Rosshairy, Abd. Rahman
title Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_short Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_full Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_fullStr Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_full_unstemmed Produktiviti di Bahagian Pengeluaran Sebuah Kilang : Satu Kajian Kes
title_sort produktiviti di bahagian pengeluaran sebuah kilang : satu kajian kes
granting_institution Universiti Utara Malaysia
granting_department Sekolah Siswazah
publishDate 2003
url https://etd.uum.edu.my/1210/1/ROSSHAIRY_BT._ABD._RAHMAN.pdf
https://etd.uum.edu.my/1210/2/1.ROSSHAIRY_BT._ABD._RAHMAN.pdf
_version_ 1747827096290328576