The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance
Considering the major problems faced by the Malaysian construction industry in managing resources and understanding clients‟ needs, as well as the methodological and theoretical gaps in previous studies, this research attempts to investigate the extent of management capability, relationship capabili...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | eng eng |
Published: |
2013
|
Subjects: | |
Online Access: | https://etd.uum.edu.my/4319/1/s92470.pdf https://etd.uum.edu.my/4319/13/s92470_abstract.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uum-etd.4319 |
---|---|
record_format |
uketd_dc |
institution |
Universiti Utara Malaysia |
collection |
UUM ETD |
language |
eng eng |
advisor |
Md Isa, Filzah Othman, Siti Norezam |
topic |
HD28-70 Management Industrial Management TH Building construction |
spellingShingle |
HD28-70 Management Industrial Management TH Building construction Baderisham, Jolly The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance |
description |
Considering the major problems faced by the Malaysian construction industry in managing resources and understanding clients‟ needs, as well as the methodological and theoretical gaps in previous studies, this research attempts to investigate the extent of management capability, relationship capability and competitive advantage influence on Bumiputera construction project performance. This research utilised the resource-based view theory to determine the relationship between the construction companies‟ capabilities and their project performance. Survey questionnaires were sent to 1,600 construction companies‟ project managers listed on the CIDB's Malaysian Construction Industry Directory. Out of the 1,600 questionnaires sent, 420 were received. However, only 385 were usable which produced a response rate of 24 per cent. Management capability, relationship capability and competitive advantage were found to have significant positive influence on construction project performance. Thus, construction project performance is influenced by all the three components. The management must also ensure that all important elements of management and relationship capabilities such as competence, cooperation, project management methodology, comprehension and communication are practiced in their organisations. Further information is provided in the study |
format |
Thesis |
qualification_name |
Doctor of Business Administration (DBA) |
qualification_level |
Doctorate |
author |
Baderisham, Jolly |
author_facet |
Baderisham, Jolly |
author_sort |
Baderisham, Jolly |
title |
The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance |
title_short |
The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance |
title_full |
The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance |
title_fullStr |
The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance |
title_full_unstemmed |
The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance |
title_sort |
extent of management capability, relationship capability, and competitive advantage influence on bumiputera contractors' project performance |
granting_institution |
University Utara Malaysia |
granting_department |
Othman Yeop Abdullah Graduate School of Business |
publishDate |
2013 |
url |
https://etd.uum.edu.my/4319/1/s92470.pdf https://etd.uum.edu.my/4319/13/s92470_abstract.pdf |
_version_ |
1747827713243086848 |
spelling |
my-uum-etd.43192022-04-10T02:47:51Z The extent of management capability, relationship capability, and competitive advantage influence on Bumiputera contractors' project performance 2013 Baderisham, Jolly Md Isa, Filzah Othman, Siti Norezam Othman Yeop Abdullah Graduate School of Business Othman Yeop Abdullah Graduate School of Business HD28-70 Management. Industrial Management TH Building construction Considering the major problems faced by the Malaysian construction industry in managing resources and understanding clients‟ needs, as well as the methodological and theoretical gaps in previous studies, this research attempts to investigate the extent of management capability, relationship capability and competitive advantage influence on Bumiputera construction project performance. This research utilised the resource-based view theory to determine the relationship between the construction companies‟ capabilities and their project performance. Survey questionnaires were sent to 1,600 construction companies‟ project managers listed on the CIDB's Malaysian Construction Industry Directory. Out of the 1,600 questionnaires sent, 420 were received. However, only 385 were usable which produced a response rate of 24 per cent. Management capability, relationship capability and competitive advantage were found to have significant positive influence on construction project performance. Thus, construction project performance is influenced by all the three components. The management must also ensure that all important elements of management and relationship capabilities such as competence, cooperation, project management methodology, comprehension and communication are practiced in their organisations. Further information is provided in the study 2013 Thesis https://etd.uum.edu.my/4319/ https://etd.uum.edu.my/4319/1/s92470.pdf text eng public https://etd.uum.edu.my/4319/13/s92470_abstract.pdf text eng public dba dba University Utara Malaysia Abbas, M.I. (2006). "Causes and Effects of Delays in ACEH Construction Industry". Masters Thesis: Universiti Teknology Malaysia, 2006. Abbasi, G.Y., & Al-Mharmah, H., (2000). Project management practice by the public sector in a developing country. International Journal of Project Management. 18 (2), 105–109. Abd El-Razek, M.E., Bassioni, H.A., & Mobarak, A.M. (2008) Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management. 134 (11), 831-841. Ab.Halim, M.S., Jaafar, M., & Osman, O. (2010). The Contracting Firm's Failure And Financial Related Factors: Malaysia Construction Industry. International Research Journal of Finance and Economics. 52. Ab.Halim, M.S., Jaafar, M., Osman, O. & Haniff. M.S. (2012). The Financial Ratio Analysis: An Assessment of Malaysian Contracting Firms. Journal of Construction in Developing Countries, Supp. 1, 71–78, 2012. Abdullah, F., Hamali, J., Deen, A.R., Saban, G. and Abdurahman, A.Z.A. (2009) Developing a framework of success of Bumiputera entrepreneurs, Journal of Enterprising Communities: People and Places in the Global Economy, 3(1), 8–24 Abdul-Kareem, H.I. & Abu-Bakar, A.H. (2011). Identifying IT Benefits For Malaysian Construction Companies. Journal of Information Technology in Construction. 16. 477. Abdul-Rahman, Berawi, M.A., Berawi, A.R., Mohamed, O., Othman, M. & Yahya, I.A. (2006). Delay mitigation in the Malaysian construction industry. Journal of Construction Engineering and Management. 132 (2), 125-133 Abdul-Rahman, H., Takim, R., & Min, W.S. (2009). Financial-related causes contributing to project delays. Journal of Retail and Leisure Property. 8 (3), 225-238. Abdomerovic, M., Blakemore, G., & Steward, J. (2003). Show it simply. Project Management Journal, 31, 27-32. Abdullah, M.R., Abdul Azis, A.A., & Abdul Rahman, I. (2009). Causes of delay and its effects in large MARA construction project. International journal of Integrated Engineering (Issue on Mechanical, Materials and Manufacturing Engineering). Abiola, R.O. (2000), “Management implications of trends in the construction cost in Nigeria”, The Quantity Surveyor, 30 (11), 35-40. Abu Bakar, A.H., Yusof, M.N., Awang, A., & Adamy, A. (2011). Survival Strategies Of Construction Companies In Malaysia During Two Periods Of Recession. International Journal Of Academic Research 3 (4). Abu Mansor, S., (2010). The 7th Malaysia Construction Sector Review and Outlook Seminar. Adnan, H., Rahmat, M.N. Mazali, N.F.N & Jusoff, K. (2008). Risk Management Assessment for Partnering Projects in the Malaysian Construction Industry. Journal of Politics and Law, (1), 1, 76-81 Agresti, A. & Finlay, B. (1997). Statistical Methods for the Social Sciences 3rd Edition. Upper Saddle River, NJ: Prentice Hall. Ahmad, K. (2009). Construction Economy. Malaysia: Prentice Hall. Aje, O.I., Odusami, K.T. & Ogunsemi, D.R. (2009).The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction 14 (2). Ajibade, A.O. (2006). “The impact of contractors management capability on construction project performance in Nigeria”, unpublished B.Tech. dissertation, Federal University of Technology, Akure. Alarcón, L.F. & Bastias, A. (2000). A computer environment to support the strategic decision-making process in construction firms. Engineering Construction and Architectural Management. 7(1), 63–75, Al-Kharashi, A., & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics. 27(1), 3-23. Alaghbari, W., Kadir, M.A., Salim, A. & Ernawati, (2007). "The significant factors causing delay of building construction projects in Malaysia", Engineering, Construction and Architectural Management, 14(2), 192-206. Ali, A.S., & Rahmat, I. (2010). The performance measurement of construction projects managed by ISO-certified contractors in Malaysia. Journal of Retail & Leisure Property, 9 (1), 25–35. Ali, A.S., Mohd-Don,Z., Alias, A., Kamaruzzaman S.N., & Pitt, M. (2010). The Performance of Construction Partnering Projects in Malaysia. International Journal of Physical Sciences Vol. 5(4), 327-333. Al-Rousan, M., & Qawasmeh, F. (2009). The Impact of SWOT Analysis on Achieving a Competitive Advantage: Evidence from Jordanian Banking Industry. International Bulletin of Business Administration, 6, 82-92. Al-Tmeemy, S., Abdul-Rahman, H., & Harun, Z. (2011). Future criteria for success of building projects in Malaysia. International Journal of Project Management, 29, 337-348. Alvarez, S. & Busenitz, L. (2001). The entrepreneurship of resource based theory. Journal of Management 27, 655-676. Ameh, O.J., & Osegbo, E.E. (2011). Study of relationship between time overrun and productivity on construction sites. International Journal of Construction Supply Chain Management 1(1). 56-67. Amu, O.O. & Adesanya, D.A. (2011). Mathematical Expressions for Explaining Project Delays in Southwestern Nigeria”, Singapore Journal of Scientific Research, 1(1), 59-67. Anumba, C.J., Bouchlaghem, N.M. & Whyte, J. (2000). “Perspectives on an integrated construction project model”, International Journal of Co-operative Information Systems, 9(3), 283-313. Andersén, J. (2011)."Strategic resources and firm performance", Management Decision, 49(1), 87–98. Andersen, J.L., Christensen, K. & Howard, R.W. (2005), “Project management with a project web”, ITcon, 8, 29-41, available at: www.itcon.org. Andi & Minato, T. (2003) Design documents quality in Japanese construction industry. International Journal of Project Management 21: 537–546. Anvuur, A & Kumaraswamy, M (2006). Cooperation in construction: towards a research agenda. In: Sivyer, E, (ed.) (Proceedings) Construction and Building Research (COBRA) Conference. (90-98). RICS Foundation: University College London. ASIACONSTRUCT (2009). Integration Of The Construction Industry Through Partnering – The Malaysian Initiative. Paper presented at the 15th Asia Construct Conference 19th – 21st October 2009. Available at: http://www.asiaconst.com/past_conference/conference/15th/6 Malaysia.pdf. ASIACONSTRUCT (2011). 17th Conference in India, 2011 http://www.asiaconst.com/past_conference/ conference/17th/index.html. Arain, F.M. (2007). Critical Success Factors of Project Management Practices in Pakistan's Construction Industry. Construction Information Quarterly. 9(4), 179-185. Arain, F.M., & Low, S.P. (2005). Lesson learned from past projects for effective management of variation orders for institutional building projects: In: Proceedings of the MICRA 4th annual conference, Kuala Lumpur, Malaysia, 10–8. Arditi, D., Polat, G., & Makinde, S.A. (2008), “Marketing practices of US contractors”, Journal of Management in Engineering, 24(4), 255-64. Ashley, D.B. (1986), “New trends in risk management”, paper presented at the Internet‟s 10th International Expert Seminar on New Approaches in Project Management,Zurich, 10-12 March. Ashley D.B., Lurie C.S., & Jaselskis, E.J. (1987). Determinates of construction project success. Project Manage. J., 18(2): 69-79. Attaran, M., & Attaran, S. (2002), “Collaborative computing technology: the hot new managing tool”, Team Performance Management, 8 (1/2), 13-20. Ayub, A.R., & Eman, J. (2006). Identification of Challenges faced by Bumiputera Contractors & Roles of Local Government in ensuring a successful completion of a Project. Azhar, N., Farooqui, R.U. & Ahmed, S. M. (2008). Cost overrun factors in construction industry in Pakistan. Proceeding of first international conference on construction in developing countries (ICCIDE-1), Karachi, Pakistan, 4-5 August. 499-508. Azmy, N., (2012) "The Role of Team Effectiveness in Construction Project Teams and Project Performance".Graduate Theses and Dissertations. Paper 12265. Bakar, A.H.A, Razak, A.A., Yusof, M.N., and Karim, N.A. (2011) Factors determining growth of companies: A study on construction companies in Malaysia, African Journal of Business Management, 5(22), 8753-8762. Baloyi,L. & Bekker, M. (2011). Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa. African Journals Online http://www.ajol.info/index.php/actas /article/view/77173. Barney, J., Wright, M. & Ketchen, D.J. Jr (2001), “The resource-based view of the firm: ten years after 1991”, Journal of Management, 27(6), 625-41. Barney, J.B. (1991), “Firm resources and sustained competitive advantage”, Journal of Management, 17(1), 99-120. Barney, J. B., & Hesterly, W. S. (2006). Strategic Management and Competitive Advantage–Concepts. New Jersey: Pearson. Baron, R. M., & Kenny, D. A. (1986). The moderator-mediator variable distinction in social psychological research: Conceptual, strategic and statistical considerations. Journal of Personality and Social Psychology, 51,1173-1182. Basheka, B.C. & Milton, T. (2010) Measuring the performance of Contractors in Government Construction Projects in Developing countries: Uganda’s Context. Proceedings of the 19th Annual IPSERA Conference. 16–19 May 2010 Lappeenranta, Finland. Beatham, S., Anumba, C.J., Thorpe, T. & Hedges, I. (2004). “KPIs – a critical appraisal of their use in construction.” Benchmarking, 11(1), 93–117. Becker, G. (1964). Human capital. New York, NY: Columbia University Press. Behrens, M. (2002). Holzmann construction company files for bankruptcy protection. European Industrial Relations Observatory Online. Available at: http://www.eurofound.europa.eu/eiro/2002/4.feature/de0204204 f.htm. Belout, A. & Gauvreau, C. (2004) Factors influencing the project success: the impact of human resource management. Int J Project Manage, 22: 1–11. Belson, K. (2002). Contractor in Japan is seeking bankruptcy. The New York Times. Available at: http://www.nytimes.com [Accessed on 5 March 2002]. Benjamin, R. (2006). Project Success as a function of Project Management Methodology: an emergent systems approach. MBA Research Project submitted to the University of Hull. Blyth, A., & Worthington, J. (2001). Managing the brief for better design. London: Spon. Blismas, N.G., Sher, W., Thorpe, A. & Baldwin, A.N. (2004). Factors influencing project delivery within construction clients‟ multi-project environments. Engineering Construction and Architectural Management. 11(2), 113-125. Bresnen, M. & Marshall, N. (2000). "Partnering in construction: a critical review of issues, problems and dilemmas", Journal of Construction Engineering and Management, 18(2), 229-237. Brewer, G. & Runeson, G. (2009) "Innovation and attitude: Mapping the profile of ICT decision-makers in architectural, engineering and construction firms", International Journal of Managing Projects in Business, 2(4), 599–610. Bubshait, A.A. & Almohawis, S.A. (1994). Evaluating the general conditions of a construction contract. International Journal of Project Management 12(3), 133–135. Cambridge dictionary (2005). Cambridge dictionary website, available from: http://dictionary.cambridge.org/define.asp?key=78677&dict= CALD. (Accessed on 01 May 2011). Chan, A.P.C. (2001). Time-cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19: 223–229. Chan, A.P.C., Ho, D.C.K., & Tam, C.M. (2001). Design and build project success factors: multivariate analysis. J Constr Eng Manage, ASCE., 127(2): 93–100. Chan, I.P.C., Scott, D., & Lam, E.W.M., (2002). Framework of success criteria for design/build projects. Journal of Management in Engineering, 18, 120–128. Chan P.C., & Chan PL (2004). Key performance indicators for measuring construction success. Benchmarking: Int. J., 11(2): 203-221. Cheung, S., Suen, C.H., & Cheung, K. W. (2004). PMMS: A web-based construction project performance monitoring system. Automation in construction, 13(3): 361-376. Chew, D.A.S., Yan, S., and Cheah, C.Y.J. (2008) "Core capability and competitive strategy for construction SMEs in China", Chinese Management Studies, 2(3), 203–214. Cheung, S., Suen, C.H., & Cheung, K. W. (2004). PMMS: A web-based construction project performance monitoring system. Automation in construction, 13(3): 361-376. Chua D.K., Kog Y.C., & Loh P.K. (1999).Critical success factors for different project objectives. J Constr Eng Manage, ASCE, 125(3), 142–50. Chileshe, N. & Haupt, T.C. (2005)."Modelling critical success factors of construction project management (CPM)", Journal of Engineering, Design and Technology, 3(2), 140–154. Christensen, C. M., & Overdorf, M. (2000). Meeting the Challenge of Disruptive Change, Harvard Business Review. 78(2), 67-75. Cicmil, S. & Marshall, D. (2005), "Insights into collaboration at the project level: complexity, social interaction and procurement mechanisms", Building Research and. Information, 33(6), 523-535. CIDB (2012). Construction Quarterly Statistical Bulletin 2012. Kuala Lumpur, CIDB Malaysia. CIDB (Construction Industry Development Board Malaysia). (2008). Dormant and Non-Active Contractors 2005–2008. Kuala Lumpur: CIDB. CIDB News (2007), Issue 3. CIDB Master Plan for OSHA (2004), Master Plan for Occupational Safety and Health in Construction Industry 2005-2010, CIDB, Kuala Lumpur. Clarke, A. (1999). A practical use of key success factors to improve the effectiveness of project management. Int J Project Manage, 17(3): 139–45. Coase, R. (1937), The Nature of the Firm, 4 Economica, 386-405. Construction Industry Institute (1994). Pre-Project Planning: Beginning a Project the Right Way, Construction Industry Institute, University of Texas at Austin, Austin, TX, Publication 39-1. Construction Industry Development Board, (2007). Construction Industry Master Plan Malaysia (2006-2015), Construction Industry Development Board, Malaysia (CIDB) Directory. (2003).3rd edition Selangor, Malaysia: Builder ‟s infornet (M) Sdn Bhd Cooke-Davies, T. (2002).The real success factors on projects. Int J Project Manage, 20(3), 185–90. Day, G.S. (1994), “The capabilities of market-driven organizations”, Journal of Marketing, 58(4), 37-52. Dikmen, I., Birgonul, M.T. & Ozcenk, I. (2005). “Marketing orientation in construction firms: evidence from Turkish contractors”, Building and Environment, 40, 257-65. Drewer, S. (2001).A perspective of the international construction system. Habitat Int, 25: 69–79. Dainty, A., Moore, D., & Murray, M. (2006). Communication in Construction Theory and Practice. Routledge. Doloi H, & Lim M.Y. (2007). Measuring performance in construction projects–a critical analysis with an Australian perspective. The construction and building research conference of the Royal Institution of Chartered Surveyors, Atlanta. Dubois, A., & Gadde, L.E. (2002). "The construction industry as a loosely coupled system: implications for productivity and innovation", Journal of Construction Engineering and Management, 20(7), 621-631. Dulaimi, M.F. (2005). The influence of academic education and formal training on the project manager‟s behavior. J Constr Res, 6(1): 179–193. Dunkelberger, L. (2009)How to Stop Losing Money on Inefficient Communication. Retrieved from http://www.articlesbase.com/business-articles/how-to-stoplosing-money-on-inefficient-communication-943893 .html. Egbu, C.O. (2004)."Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors", Engineering, Construction and Architectural Management, 11(5), 301–315. Egbu, C.O. (1999). Skills, knowledge and competencies for managing construction refurbishment works. Constr Manage Econ, 17(1), 29–43. El-Sabaa, S. (2001).The skills and career path of an effective project manager, Int J Project Manage 19(1), 1–7. Elyamany, A.; Ismail, B., & Zayed, T. (2007). Performance evaluating model for construction companies: Egyptian case study, Journal of Construction Engineering and Management. 133(8): 574–581. Emmit, S. and Gorse, C. (2007). Communication in Construction Team. Taylor & Francis, Oxon, 298. Eisenhardt, K.M., & Martin, J.A. (2000), “Dynamic capabilities: what are they?”, Strategic Management Journal, 21(10-11), 1105-21. Endut, I.R., Akintoye, A. & Kelly, J. (2009) "Cost and time overruns of projects in Malaysia," from http://www.irbnet.de/daten/icon da/CIB10633. Enshassi, A.., Mohamed, S. & Abushaban, S. (2009). Factors Affecting The Performance Of Construction Projects In The Gaza Strip. Journal of Civil Engineering And Management. 15(3): 269–280. Eriksson, P.E. & Westerberg, M. (2011) Effects of cooperative procurement procedures on construction project performance: A conceptual framework. International Journal of Project Management. 29(2), 197-208. Fahy, J. (2000). The resource-based View of the Firm: Some Stumbling-Blocks on the Road to Understanding Sustainable Competitive Advantage, Journal of European Industrial Training, 24(2/3/4): 94-104. Falshaw, J. R., Glaister, K. W., & Ekrem, T. (2006). Evidence on formal strategic planning and company performance. Management Decision, 44(1), 9–30. Faridi, A., & El-Sayegh, S. (2006). Significant factors causing delay in the UAE construction industry, Construction Management and Economics 24(11): 1167–1176. Forsberg, K., Mooz, H., & Cotterman, H., (2000). A Model for Business and Technical Success, 2nd ed. John Wiley & Sons Inc., N.Y., US. Fortune, J. & White, D. (2006). Framing of project critical success factors by a systems model. International Journal of Project Management, 24, 53–65. Frimpong, Y., Oluwoye, J. & Crawford, L. (2003). Causes of delays and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study. Int. J. Proj. Manag., 21: 321-326. Frödell, M., Josephson, P. & Lindahl, G. (2008)."Swedish construction clients' views on project success and measuring performance". Journal of Engineering, Design and Technology, 6(1), 21–32. Fugar, F.D.K., & Agyakwah-Baah, A.B. (2010) Delays in building construction projects in Ghana‟, Australasian Journal of Construction Economics and Building, 10 (1/2) 103‐116. Usage of Information Technology in Construction Firms; Malaysian Construction Industry. Gaith, F.H., Khalim, R.A, Ismail, A. (2009) Usage of Information Technology in Construction Firms; Malaysian Construction Industry European Journal of Scientific Research 28(3): 412-421. Gale, A., & Luo J. (2005). Factors affecting construction joint ventures in China. Int J Project Manage, 22(1): 33–42. Garbharran, H., Govender, J., & Msani, T.. (2012) Critical success factors influencing project success in the construction industry, African Journals Online 19(2). Gimenez, C., & Ventura, A. (2002). Supply chain management as a competitive advantage in the Spanish grocery sector. Published Working Paper. No. 2, 04/2002, Universitat Pompeu Fabra' (UPF), Barcelona, Spain. Gimenez, C., & Ventura, A. (2002). Supply chain management as a competitive advantage in the Spanish grocery sector. Published Working Paper. No. 2, 04/2002, Universitat Pompeu Fabra' (UPF), Barcelona, Spain. Gollenbeck-Sunke, N. & Schultmann, F. (2010). Resource classification and allocation in project-based production environments. International Journal of Project Organisation and Management. 2(2), 122-134. Grant, R. M. (2002). Contemporary Strategy Analysis (4th ed.). Oxford: Blackwell Publishers Inc. Greenberg, J., & Baron, R. (2000). Behavior in Organizations:, 7th Ed.Upper Saddle River, NJ: Prentice- Hall, Inc. Guenzi, P., & Troilo, G. (2006). Developing Marketing Capabilities for Customer Value Creation through Marketing-Sales Integration. Industrial Marketing Management, 35: 974-988. Gujarati, D.N. (2004). Basic Econometrics, McGraw Hill Companies, Inc, 4th Ed., London Hafeez, S. Chaudhry, R.M., Siddiqui, Z.U. & Rehman. K.U. (2011) The Effect of Market and Entrepreneurial Orientation on Firm Performance. Information Management and Business Review, 3(6), 389-395. Hamel, G., & Prahalad, C. (1996). Competing for the Future, Harvard Business School Press, Paperback edition, Boston (Massachusetts). Hair, J., Anderson, R., Tatham, R., & Black, W. (1998). Multivariate data analysis (5th ed.). Upper Saddle River: Prentice-Hall Inc. Hair, J.F, Black, W.C., Babin, B.J., Anderson, R.E., & Tatham, R.L. (2006). Multivariate data analysis (6th edition.). New Jersey: Pearson Education International. Harisaweni, H. (2007) The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia. Masters thesis, Universiti Teknologi Malaysia, Faculty of Built Environment. Harris, F., McCaffer, R. & Edum-Fotwe, F. (2006). Modern Construction Management, Blackwell, Oxford. Hauck, A.J., Walker, D.H.T., Hampson, K. D. & Peters, R.J. (2004), "Project alliancing at National Museum of Australia - collaborative process", Journal of Construction Engineering and Management, 130(1), 143-152. Heerkens, G.R., (2002). Project Management. McGraw-Hill, N.Y., US. Hooley, G., Greenley, G., Fahy, J. & Cadogan, J. (2001) Market-focused Resources, Competitive Positioning and Firm Performance. Journal of Marketing Management. 17(5-6), 503-520. Hunt, S.D. (2000). A General Theory of Competition: Resources, Competences, Productivity, Economic Growth, Sage, London. IASB (2001), “Framework for the preparation and presentation of financial statements”, International Financial Reporting Standards, International Accounting Standards Board, April. Ibrahim, A.R., Matthew H. R., Ahmed, Z. & Imtiaz, G. (2010)."An investigation of the status of the Malaysian construction industry", Benchmarking: An International Journal, 17(2), 294–308. Isik, Z., Arditi, D., Dikmen, I. & Birgonul, M.T. (2010). Impact of Resources and Strategies on Construction Company Performance. J. Manage. Eng. 26(1), 9-18. Isik, Z. & Arditi, D. & Dikmen, I. & Birgonul, M.T. (2009) Impact of corporate strengths/weaknesses on project management competencies. International Journal of Project Management, 27(7), 629-637. Isik, Z. (2009). A Conceptual Performance Measurement Framework For Construction Industry. Unpublished Thesis Submitted To The Graduate School Of Natural And Applied Sciences Of Middle East Technical University in Partial Fullfilment Of The Requirements For The Degree Of Doctor Of Philosophy In Civil Engineering. Iyer, K. and Jha, K. (2005) Factors affecting cost performance evidence from Indian construction projects. International Journal of Project Management, 23(4), 283-295. Jaafar, M. and Abdul-Aziz, A.R. (2005) Resource-based view and Critical Success Factors: A Study on Small and Medium Sized Contracting Enterprise (SMCEs) in Malaysia. The International Journal of Construction Management, 5(2). Jaafar, M., T. Ramayah, Abdul-Aziz, A.R, & Saad. (2007)."Technology readiness among managers of Malaysian construction firms", Engineering, Construction and Architectural Management, 14(2), 180–191. Jackson, O. & Steven, O. (2001) "Management of cost overrun in selected building construction project in Ilorin," Review of Business and Finance, 3 (2001). Jensen M.C., Meckling W.H. (1976). Theory of the firm: managerial behaviour, agency costs and ownership structure. J Fin Econ; 3: 305–60. Jha, K.N., & Iyer, K.C. (2007) Commitment, coordination, competence and the iron triangle. International Journal of Project Management, 25(5), 527-540. Jha, K.N., & Iyer K.C. (2006) Critical factors affecting quality performance in construction projects. Total Quality Management & Business Excellence, 17(9), 1155-1170. Jian, Z. Xiao-Hua, J., & Timothy, N. (2011), Cost and time overruns in commercial construction projects : an Australian study, in CITC-VI 2011: Proceedings of the Sixth International Conference on Construction in the 21st Century: Construction Challenges in the New Decade, CITC-VI, Greenville, N.C., 169-176. Kale, S., & Arditi, D. (2001), "General contractors' relationships with subcontractors: a strategic asset", Journal of Construction Engineering and Management, 19(5), 541-549. Kaliba, C., Muya, M. & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27, pages: 522-531. Kagioglou, M., Cooper, R. & Aouad, G. (2001), “Performance management in construction: a conceptual framework”, Construction Management and Economics, 19(1), 85-95. Kasimu, M.A. (2012). Significant Factors That Causes Cost Overruns In Building Construction Project In Nigeria. Interdisciplinary Journal Of Contemporary Research In Business, 3(11), 775-780. Karna, S., Junnonen, J. & Sorvala, V. (2009). Modelling structure of customer satisfaction with construction. Journal of Facilities Management, 7(2), pp. 111-127. Katzenback, J. R., and Smith, D. K. (2003). The wisdom of teams. Harvard Business School Press, Boston. Harper Business Essentials, New York, 320. Kerzner, H., (2001). Project Management: A Systems Approach to Planning, Scheduling and Controlling, seventh ed. John Wiley & Sons Inc., New York, USA. Kerzner H. (1987). In search of excellence in project management. J Syst Manage, 38(2): 30–9. Khoshgoftar, M, Bakar, A.H.A., & Osman, O. (2010). Causes of delays in Iranian construction projects. International Journal of Construction Management. 10(2), 53-69. King, A.W. & Zeithaml, C.P. (2001). “Competencies and firm performance: Examining the causal ambiguity paradox.” Strategic Management Journal, 22(1), 75-99. Knott, P. (2009)."Integrating resource-based theory in a practice-relevant form", Journal of Strategy and Management, 2(2), 163–174. Koushki, P.A., Al-rashid, K., & Kartam, N. (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics 23, 285–294. Koskela, L. (2003). "Is structural change the primary solution to the problems of construction?" Building Research and Information, 31(2), 85-96. Koskinen, K. U., Pihlanto, P., & Vanharanta, H. (2003). Tacit knowledge acquisition and sharing in a project work context. International Journal of Project Management, 21, 281-290. Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30, 607-610. Kristandl, G. & Bontis, N. ( 2007).Constructing a definition for intangibles using the resource based view of the firm. Management Decision 45(9), 1510-1524. Kuen, C. W., Zailani, S., & Fernando, Y. (2009). Critical factors influencing the project success amongst manufacturing companies in Malaysia. African Journal of Business Management, 3(1), 16-27. Latif, Y; Abidin, I & Trigunarsyah, B (2008). Knowledge-based Material Cost Control for Building Construction Project using Expert System Approach. In Haigh, Richard and Amaratunga, Dilanthi, Eds. Proceedings CIB International Conference on Building Education and Research, pages: 1969-1978, Heritance Kandalama, Sri Lanka. Lee, A., Cooper, R. & Aouad, G. (2000). “A methodology for designing performance measures for the UK construction industry”, paper presented at Bizarre Fruit Postgraduate Research Conference on the Built and Human Environment, Salford. Lee S., Thomas S., Tucker R., (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), 545-553. Le-Hoai, L., Lee, Y.D, & Lee J.Y. (2008). Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries, KSCE Journal of Civil Engineering, 12(6), 367-377. Li, B., Akintoye A., Edwards P.J., Hardcastle C. (2005). Critical success factors for PPP/PFI projects in the UK construction industry. Constr Manage Econ, 23(5), 459–71. Lim, C.S., & Mohamed M.Z. (1999). Criteria of project success: and exploration reexamination. Int. J. Project Manage, 17(4): 243-248. Lin, G.B., & Shen, Q.P. (2007). “Measuring the performance of value management studies in construction: critical review”, Journal of Management in Engineering, 23(1), 2-9. Ling, F.Y.Y., Pheng, L.S. Qing, W.S. & Hua, L.H. (2007). Key project management practices affecting Singaporean firms project performance in China, International Journal of Project Management. 27(1), 59-71. Liu, L. (2009). "How does strategic uncertainty and project sponsorship relate to project performance?: A study of Australian project managers", Management Research News, 32(3), 239-253. Long, L.H., Young, D.L., & Jun, Y.L..(2008). Delays and cost overrun in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12, 367-377. Lopez-Cabrales, A., Vale, R., & Herrero, I., (2006). The contribution of core employees to organizational capabilities and efficiency, Human Resource Management, 45(1), 81-109. Lopez-Gamero, M.D., Molina-Azorın, J.F. & Claver-Cortes, E. (2009). The whole relationship between environmental variables and firm performance: Competitive advantage and firm resources as mediator variables, Journal of Environmental Management, 1-12. Luu, V.T., Kim, S.Y. & Huynh, T.A., (2007), Improving project management performance of large contractors using benchmarking approach, International Journal of Project Management. 26(7), 758-769. Ma, H. (2000). Competitive advantage and firm performance. Competitiveness Review, 10(2), 16. MacKinnon, D.P. (2008). Introduction to Statistical Mediation Analysis. New York: Erlbaum. MacKinnon, D.P., Warsi, G., & Dwyer, J.H. (1995). A simulation study of mediated effect measures. Multivariate Behavioral Research, 30(1), 41-62. McManus,J., Wood-Harper, T., (2002). Information Systems Project Management: Methods Tools and Techniques. FT Prentice Hall, NJ, USA. Makhura, S.M. (2011). An analysis of the entrepreneurial competencies of the owners/managers of emerging small contractor companies in the construction industry. University of the Witwatersrand, Faculty of Engineering and the Built Environment, School of Construction Economics and Management. Malaysian Institute of Management (MIM). (2012) http://www.mim.org.my/index.php?option=com_content&view=article&id=214&Itemid=215. Memon, A.H., Abdul-Rahman, I., & Azis, A. (2012) Time and Cost Perfomance in Construction Projects in Southern and Central Regions of Penisular Malaysia. International Journal of Advances in Applied Sciences (IJAAS) 1(1), 45-52. Memon, A.H., Abdul-Rahman, I., Abdullah, M.A., Asmi, A., & Azis, A. (2011). Preliminary Study on Causative Factors Leading to Construction Cost Overrun. International Journal of Sustainable Construction Engineering & Technology, 2(1). Memon, A.H., Abdul-Rahman, I., Abdullah, M.A., Asmi, A., & Azis, A. (2010). Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant. International Journal of Sustainable Construction Engineering & Technology. 1,(2). Mohd. Azraai, K., & Jen Loong, L. (2002).A Study On Variations In Sewerage Construction Projects. Jurnal Teknologi B (37B). 13-26. Moore, D.R. & Dainty, A.R.J. (2001). "Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change", Journal of Construction Engineering and Management, 19(6), 559-562. Morgan, N. A., Kaleka, A., & Katsikeas, C.S. (2004). Antecedents of export venture performance: A theoretical model and empirical assessment. Journal of Marketing, 68, 90–108. Morris, P.W.G. (1986). Research at Oxford into the preconditions of success and failure of major projects: In: Proceedings of the 18th annual seminar/symposium of the Project Management Institute, Montreal, Canada,. 53–66. Moura, H.P., Teixeira, J.C., & Pires, B. (2007). Dealing with cost and time in the portuguese construction industry. CIB World Building Congress, 1252-1265. Muller, R., & Turner, R., (2007). The influence of project managers on project success criteria and project success by type of project. Eur. Man. J. 25 (4), 298–309. Murali, S. & Soona, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management. 25(5), 517-526. Naughton, E., Kavanagh, D., (2005). Is Project Management Deficit a Brake on the Irish Economy?. [Online] [Accessed May 23rd, 2011] Available from the World Wide Web: http://www.projectmanagement.ie/articles/ireland_a_leader_in _project_management_practice.htm. Navon, R. (2005), Automated project performance control of construction projects, Automation in Construction, 14, 467. 476. Nega, F. (2008). Causes and effects of cost overrun on public building construction projects in Ethiopia. Phd Thesis. Addins Ababa University, Ethiopia. Newbert, S.L. (2008). Value, rareness, competitive advantage, and performance: A conceptual-level empirical investigation of the resource-based view of the firm. Strategic Management Journal, 29(7), 745–768. Ng LY, & Mo, J.K.W. (1997). Hospital procurement by design and build: a case study in Hong Kong. In: Proceeding of CIB W92 procurement – a key to innovation, procurement sys, symposium,. 545–53. Nguyen L.D., Ogunlana S.O., & Lan D.T. (2004). A study on project success factors on large construction projects in Vietnam. Eng Constr Arch Manage, 11(6), 404–13. Nitithamyong, P., & Tan, Z. (2007). Determinants for effective performance of external project management consultants in Malaysia. Engineer. Construction Architectural Manage, 14(3): 463-478. Nixon Kamukama, Augustine Ahiauzu, Joseph M. Ntayi, (2011) "Competitive advantage: mediator of intellectual capital and performance", Journal of Intellectual Capital, 12(1), 152–164. Odusami, K.T. (2002).Perceptions of construction professionals concerning important skills of effective project leaders. J Manage Eng, 18(2): 61–7. Olateju, O.I., Abdul-Azeez, I.A., & Alamutu, S.A. (2011) Project Management Practice In Nigerian Public Sector - An Empirical Study. Australian Journal of Business & Management Research. 1(8), 1. Olawale, Y.A., & Sun, M. (2010) "Cost and time control of construction projects: inhibiting factors and mitigating measures in practice," Construction Management and Economics, 28, 509–526. Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalation: Causes and effects in Nigeria. Proceeding of Sixth International Postgraduate Research Conference, Delft University of Technology and TNO, the Netherlands. 3rd-7th April 2006. Onosakponome, O.F., Yahya, A., Rani, N.S.A., & Shaikh, J.M. (2011). Cost Benefit Analysis of Procurement Systems and the Performance of Construction Projects in East Malaysia. Information Management and Business Review. 2(5), 181-192. Othman, M.H. (2010) A study on problems of bumiputera contractor in construction industry. Undergraduates Project Report (PSM) thesis, Universiti Malaysia Pahang. Othman, A.A., Torrance, J.V., & Hamid, M.A. (2006). "Factors influencing the construction time of civil engineering projects in Malaysia", Engineering, Construction and Architectural Management, 13(5), 481–501. Oxford Dictionary (2005).Oxford dictionary website, available from: http://www.oup.com/oald-bin/web_getald7index1a.pl (Accessed on 01 May 2011). Pallant, J. (2001). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS for Windows (Version 10). Victoria: McPherson‟s Printing Group Parfitt, M.K., & Sanvido, V.E. (1993). Checklist of critical success factors for building projects. Journal of Management in Engineering 9(3), 243–249. Payne, J.H., & Turner, J.R., (1999). Company-wide project management: the planning and control of programmes of projects of different types. International Journal of Project Management 17(1), 55–59. Pheng, L.S., & Chuan, Q.T. (2006), Environmental factors and work performance of project managers in the construction industry, International Journal of Project Management, 24, 24. 37. Penrose, E.T. (1959). The Theory of the Growth of the Firm, Wiley, New York, NY. Penrose, F. (1995-1999). The Theory of the Growth of the Firm. First edition. edn. Oxford: Basil Blackwell and New York: John Wiley & Sons. Second edition, 1980, Oxford: Basil Blackwell Pesämaa, O., Eriksson, P-E., & Hair, J.F. (2009) Validating a model of cooperative procurement in the construction industry. International Journal of Project Management. 27(6), 552-559. Peteraf, M.A. (1993). “The corner-stones of competitive advantage: a resource-based view”, Strategic Management Journal, 14(3), 179-91. Peterson, S.J. (2005). Construction Accounting and Financial Management. Upper Saddle River, New Jersey: Prentice Hall. Pheng, L. S., & Chuan, Q. T. (2006). Environmental factors and work performance of project managers in the construction industry. International Journal of Project Management, 24(1): 24-37. Phua, F.T.T., & Rowlinson, S. (2004).How important is cooperation to construction project success? A grounded empirical quantification. Engineering, Construction and Architectural Management. 11(1), 45–54. Phua, F.T.T. (2004). Modeling the determinants of multi- firm project success: A grounded exploration of different participant perspectives. Constr Manage Econ, 22: 451–9. Pinto, J.K., & Slevin D.P. (1988). Critical success factors across the project life cycle. Project Manage, 19(3), 67–75. Project Management Institute (PMI) (2012), A Guide to the Project Management Body of Knowledge, 5th Ed. Polat, G. (2010). Using ANP Priorities with Goal Programming in Optimally Allocating Marketing Resources. Construction Innovation: Information, Process, Management, 10(3), 346-365. Polat, G., & Donmez, U. (2010). “ANP-based marketing activity selection model for construction companies”, Construction Innovation: Information, Process, Management, 10(1), 89-111. Pourrostam, T., & Ismail, A. (2011) Study of Methods for Minimizing Construction Delays: Evidences from a Developing Country. Advanced Materials Research. 201-203, 2939-2942. Pratt, R. (2000). “Project management in Malaysia, some ideas on the way ahead”. Preacher, K. J., & Hayes, A.F. (2004). SPSS and SAS procedures for estimating indirect effects in simple mediation models. Behavior Research Methods, Instruments, & Computers, 36, 717-731. Raduan, C. Jegak, U., Haslinda, A. & Alimin, A.A. (2009), 'Management, Strategic Management Theories and the Linkage with Organizational Competitive Advantage from the Resource-Based View', European Journal of Social Sciences, 11, 402-417. Raduan, C. Jegak, U., Haslinda, A. & Alimin, A.A. (2011) A Conceptual Framework of the Relationship between Organizational Resources, Capabilities, Systems, Competitive Advantage and Performance. Research Journal of Internatıonal Studıes- Issue 12 (October., 2009) Rasli, A.M., Tat, H.H., Mohd, W.M.M. and Ade, A. (2011) The effects of information technology infrastructure capability on project performance in the Malaysian construction industry. In: 2nd International Conference on Business and Economic Research (ICBER2011), 14-16 March 2011, Langkawi, Kedah. Rasli, A.M. & Mohd, W.M.W. (2008). Project Performance Framework: The Role of Knowledge Management and Information Technology Infrastructure. Asian Journal of Business and Accounting, 1(2), 2008, 39-64. Robbins, S.R. (1991). Management, 3rd ed. Englewood Cliffs, NJ: Prentice-Hall,. Rose, R.C., Abdullah, H., & Ismad, A.I. (2010), 'A Review on the Relationship between Organizational Resources, Competitive Advantage and Performance', The Journal of International Social Research, Volume 3/11, Spring, 488-498. Rohaniyati, S. (2009) Critical success factors of project management for Brunei construction projects : improving project performance. PhD thesis, Queensland University of Technology. Safarnia, H., Akbari, Z. & Abbasi, A. (2011) Review of Market Orientation & Competitive Advantage in the Industrial Estates Companies (Kerman, Iran): Appraisal of Model by Amos Graphics. World Journal of Social Sciences, 1(5), 132-150. Salter, A. & Torbett, R. (2003) Innovation and performance in engineering design. Journal of Construction Management and Economics, 21: 573–580. Sambasivan, M., & Soon Y.W. (2007). Causes and effects of delays in Malaysian construction industry, International Journal of Project Management, 25, 517–526. Sanchez, R., Heene, A., & Thomas, H. (1996). Introduction: Towards the Theory and Practice of Competence-Based Competition, Pergamon Press, Oxford. Sanvido, V., Grobler, P.K., Guvenis, M., Coyle, M. (1992). Critical success factors for constructions project. J. Constr. Manage., ASCE, 118(1), 94-111. Saqib, M., Farooqui, R.U., & Lodi, S. (2008). Assessment of critical success factors for construction projects in Pakistan. First International Conference on Construction in Developing Countries, 392–404. Sekaran, U. (1999). Research Methods for Business. New York: John Wiley & Sons, Inc. Shenhar, A.J. Milosevic, D., Dvir, D. and Thamhain, H. (2007) Linking Project Management to Business Strategy, USA, Project Management Institute, Inc. Shenhar, A.J., Dvir, D., Levy, O., & Maltz, A.C. (2001). Project success: a multidimensional strategic concept. Long Range Plan. 34, 699–725. Sirmon, D.G., Hitt, M.A., & Ireland, R.D. (2007). Managing firm resources in dynamic environments to create value: looking inside the black box. Academy of Management Review, 32, (1), 273-292. Skipper, C.O., &, Bell, L.C. (2006).Influences impacting leadership development. J Manage Eng, 22(2), 68–74. Smith, M. (2001). “Getting construction back on track. In: beyond the bottom line, the industry in developing countries”, Proceedings of the First International Conference of CIB, November 2002, South Africa. Soetanto, R., & Proverbs, D.G. (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research 5(2), 233– 255. Songer A.D., & Molenaar, K.R. (1997).Project characteristics for successful publicsector design-build. J Constr Eng Manage, 123(1): 34–40. Srivastava, R.K., Shervani, T. A., & Fahey, L. (1998).Market-Based Assets and Shareholder Value: A Framework for Analysis, Journal of Marketing, 62, 2-18. Stoelhorst, J.W. and Raaij, V.E.M. (2004) On explaining performance differentials: Marketing and the managerial theory of the firm. Journal of Business Research, 571 (5). pp. 462-477. ISSN 0148-2963. Takim, R., & Akintoye, A., (2002).Performance indicators for successful construction project performance. In: Greenwood, D (Ed.), 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria. Association of Researchers in Construction Management, 2, 545-55. Takim, R., & Adnan, H. (2008). Analysis of Effectiveness Measures of Construction Project Success in Malaysia, Asian Social Science, 4(7). Tan, A.A.L (2004). Why Project Fail. Kuala Lumpur: Venton Publishing Sdn Bhd. Tatum, C.B. (1991). Incentive for Technological Innovation in Construction, in L.M. Change (ed), Preparing for Construction in the 21st Century– Proceeding for the Construction Conference, New York, ASCE, 447-452. The Borneo Post (2013). Bumiputera contractors told to evolve with innovators like GiatMara. http://www.theborneopost.com/2013/05/01/bumiputeracontractor s-told-to-evolve-with-innovators-like-giatmara/#ixzz2mec39 GwO. Toor, S.R., Ofori, G., & Das,. S. (2007). Developing construction professionals of 21st century: a renewed vision for leadership. In: Proceedings of international conference on civil engineering in the new millennium: opportunities and challenges (CENeM), West Bengal, India. Toor, S.R., & Ofori, G. (2006). In quest of leadership in construction industry: new arenas, new challenges! In: Proceedings of joint international conference on construction culture, innovation, and management (CCIM), Dubai, UAE. Toor, S.R., & Ogunlana, S.O. (2006). Successful project leadership: understanding the personality traits and organizational factors. In: Proceedings of CIBW107, international symposium, construction in developing economies: new issues and challenges, Chile, Santiago. Toor, S.R., & Ogunlana, S.O.(2008a).Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry. International Journal of Project Management, 26, 420–430. Toor, S.R, & Ogunlana, S.O. (2008b).Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), 395-408. Torbica, Z.M., & Stroh, R.C. (2001). “Customer satisfaction in home building.” Journal of Construction Engineering and Management. 127(1), 82-86. Tsai, M.T., & Shih, C.M. (2004). The Impact of Marketing Knowledge among Managers on Marketing Capabilities and Business Performance. International Journal of Management, 21(4): 524-530. Tuan, N.P., & Yoshi, T. (2010). Organisational capabilities, competitive advantage and performance in supporting industries in Vietnam. Asian Academy of Management Journal, 15(1), 1–21, January 2010. Tumi, S. A.H; Omran, A and Pakir, A. H. K (2009). Causes of delay in construction industry in Libya. The International Conference on Economics and Administration (ICEA), Faculty of Administration and Business, University of Bucharest, Romania. Turner, J.R. (2000). Project Success and Strategy. The Gower Handbook of Project Management. Gower Publishing Ltd, Aldershot, England. Third en. Ugwu O.O., & Haupt T.C., (2007), Key performance indicators and assessment methods for infrastructure sustainability-a South African construction industry perspective, Building and Environment, 42, 665-680. Wade, M., & Hulland, J. (2004). “The resource-based view and information systems research: review, extension, and suggestions for future research”, MIS Quarterly, 28(1), 107-42. Wang, C.K., & Ang, B.L. (2004). Determinants of venture performance in Singapore. Journal of Small Business Management, 42(4), 347–363. Wang, C. & Abdul-Rahman, H. (2010). Decoding organizational culture: A study of Malaysian construction firms. African Journal of Business Management, 4(10), 1985-1989, Wernerfelt, B. (1984). “A resource-based view of the firm”, Strategic Management Journal, 5(2), 171-80. Westerveld, E. (2003). The project excellence model: linking success criteria and critical success factors. Int J Project Manage, 21, 411–8. Williamson, O.E. (1975) Markets and hierarchies. New York, NY: Free Press. Wilson, P. M. (2001).Strategic decision-making in a professional services firm. In: Akintoye, A (Ed.), Seventeenth Annual Conference of the Association of Researchers in Construction Management, Manchester. ARCOM, 2, 649-59. Wood, H. & Ashton, P. (2009) Factors of complexity in construction projects. In: Dainty, A. (Ed) Procs 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 857-66. Wong, C.H., & Holt, G.D. (2003). “Developing a contractor classification model using a multivariate discriminate analysis approach”, RICS Foundation Research Paper Series, 4(20), 1-23. Wong, P. (2003). “Malaysian construction industry-review and outlook”, Journal of Master Builders, 3rd. quarter, 69-76. Yang, J., Shen, Q. & Ho, M. (2009). An overview of previous studies in stakeholder management and its implications for the construction industry. Journal of Facilities Management, 7(2), 159-175. Yang, H., Yeung, J.F.Y., Chan, A.P.C., Chiang, Y.H. & Chan, D.W.M (2010). "A critical review of performance measurement in construction", Journal of Facilities Management, 8(4), 269–284. Yang, L.R. (2011) Impacts of Transactional and Transformational Leadership on Project Quality Performance. Proceedings of Business and Information. 8, 1729-9322. Yasamis, F., Arditi, D. & Mohammadi, J. (2002). “Assessing contractor quality performance.” Construction Management and Economics, 20(3), 211–23. Zahra, S.A., Ireland, R.D. & Hitt, M.A. (2000). “International expansion by new venture firms: international diversity, mode of market entry, technological learning, and performance”. Academy of Management Journal, 43, 925-950. Zielinski, D. (2005). Soft skills, hard truths. Training. 42(7), 18–23. Zmud, R.W., (1980). Management of large software development efforts. MIS Quarterly. 4(2), 45–55. Zwikael, O. (2009). Critical planning processes in construction projects. Construction Innovation, 9(4), 372-387. |