Faktor cabaran dan batasan dalam amalan fleksibiliti pembekalan sistem binaan berindustri (IBS)
Flexibility ensures effective implementation of the Industrialised Building System (IBS) supply chain with the demand and changing markets. The main purpose of this research is to identify and also analyze the challenging factors and constraints upon the flexible practises of the IBS supply chain. T...
Saved in:
Main Author: | Umar, Kassim |
---|---|
Format: | Thesis |
Language: | eng eng |
Published: |
2015
|
Subjects: | |
Online Access: | https://etd.uum.edu.my/5400/1/s93577.pdf https://etd.uum.edu.my/5400/2/s93577_abstract.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Perlaksanaan Sistem Binaan Berindustri (IBS) bagi mengatasi masalah dalam industri pembinaan
by: Omar, Nur Shahirah
Published: (2010) -
Isu dan cabaran yang dihadapi oleh pengeluar komponen Sistem Binaan Berindustri (IBS)
by: A. Halim, Hazruwani
Published: (2017) -
Kepentingan teknologi sistem pembinaan berindustri (IBS) dalam mempertingkatkan keberkesanan projek pembinaan
by: Abu Bakar, Norazlin Nadia
Published: (2009) -
Persepsi kontraktor terhadap sistem binaan berindustri (IBS) kes kajian : kontraktor Negeri Kedah
by: Mat Isa, Norhafiza
Published: (2010) -
Perlaksanaan pengurusan berkesan projek Sistem Binaan Berindustri (IBS) di Jabatan Kerja Raya (JKR)
by: Hatta @ Antah, Fazilah
Published: (2011)