Construction risk management among construction companies in Nigeria : moderated by government regulation

Substantial empirical studies have established that certain organizational internal and external factors do influence construction risk management of companies. Conjugated with the recent substantial attention on risk management in Nigeria, and the demand for Nigerian construction companies to imple...

Full description

Saved in:
Bibliographic Details
Main Author: Qudus, Adeleke Adekunle
Format: Thesis
Language:eng
eng
eng
Published: 2016
Subjects:
Online Access:https://etd.uum.edu.my/6584/1/depositpermission_s96139.pdf
https://etd.uum.edu.my/6584/2/s96139_01a.pdf
https://etd.uum.edu.my/6584/3/s96139_02.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uum-etd.6584
record_format uketd_dc
institution Universiti Utara Malaysia
collection UUM ETD
language eng
eng
eng
advisor Bahaudin, Ahmad Yusni
Mohammed Kamaruddeen, Ahmed
topic HD61 Risk Management
TH Building construction
spellingShingle HD61 Risk Management
TH Building construction
Qudus, Adeleke Adekunle
Construction risk management among construction companies in Nigeria : moderated by government regulation
description Substantial empirical studies have established that certain organizational internal and external factors do influence construction risk management of companies. Conjugated with the recent substantial attention on risk management in Nigeria, and the demand for Nigerian construction companies to implement risk management in order to tackle the challenges they are facing, studies on risk management in Nigerian construction companies are few. The objectives of this study are to assess the extent of construction risk management among construction companies operating in Abuja and Lagos state in Nigeria, and to examine the organizational internal and external factors influencing their risk management, moderated by government regulation. A proportionate stratified random sampling was used to select 338 construction companies obtained from Nigeria Galleria and Lagos State Government Tender Board database. A total of 238 completed and valid questionnaires were returned, yielding a 72 percent response rate. Descriptive statistics, the 5-point Likert scale rendition and PMBOK’s risk management category were used to achieve the first research objective. The extent of risk management among Nigerian construction companies was found to be at a moderate level. Drawing upon organisational control theory, this study also examined the role of government regulation on the relationship between organizational factors and construction risk management. Furthermore, the moderating effects of government regulation revealed a negative relationship between organizational internal factors and construction risk management, while government regulation moderated a positive relationship between organizational external factors and construction risk management. Likewise, all the hypotheses on the direct relationship between organizational factors and construction risk management were supported. In summary, the findings in this research demonstrate that government regulation can enhance risk management among construction companies operating in Nigeria. To enhance risk management among construction companies, project managers should give considerable attention to the organizational factors found to be influencing their risk management.
format Thesis
qualification_name Ph.D.
qualification_level Doctorate
author Qudus, Adeleke Adekunle
author_facet Qudus, Adeleke Adekunle
author_sort Qudus, Adeleke Adekunle
title Construction risk management among construction companies in Nigeria : moderated by government regulation
title_short Construction risk management among construction companies in Nigeria : moderated by government regulation
title_full Construction risk management among construction companies in Nigeria : moderated by government regulation
title_fullStr Construction risk management among construction companies in Nigeria : moderated by government regulation
title_full_unstemmed Construction risk management among construction companies in Nigeria : moderated by government regulation
title_sort construction risk management among construction companies in nigeria : moderated by government regulation
granting_institution Universiti Utara Malaysia
granting_department School of Technology Management & Logistics
publishDate 2016
url https://etd.uum.edu.my/6584/1/depositpermission_s96139.pdf
https://etd.uum.edu.my/6584/2/s96139_01a.pdf
https://etd.uum.edu.my/6584/3/s96139_02.pdf
_version_ 1747828098277048320
spelling my-uum-etd.65842017-12-17T03:43:31Z Construction risk management among construction companies in Nigeria : moderated by government regulation 2016 Qudus, Adeleke Adekunle Bahaudin, Ahmad Yusni Mohammed Kamaruddeen, Ahmed School of Technology Management & Logistics School of Technology Management & Logistics HD61 Risk Management TH Building construction Substantial empirical studies have established that certain organizational internal and external factors do influence construction risk management of companies. Conjugated with the recent substantial attention on risk management in Nigeria, and the demand for Nigerian construction companies to implement risk management in order to tackle the challenges they are facing, studies on risk management in Nigerian construction companies are few. The objectives of this study are to assess the extent of construction risk management among construction companies operating in Abuja and Lagos state in Nigeria, and to examine the organizational internal and external factors influencing their risk management, moderated by government regulation. A proportionate stratified random sampling was used to select 338 construction companies obtained from Nigeria Galleria and Lagos State Government Tender Board database. A total of 238 completed and valid questionnaires were returned, yielding a 72 percent response rate. Descriptive statistics, the 5-point Likert scale rendition and PMBOK’s risk management category were used to achieve the first research objective. The extent of risk management among Nigerian construction companies was found to be at a moderate level. Drawing upon organisational control theory, this study also examined the role of government regulation on the relationship between organizational factors and construction risk management. Furthermore, the moderating effects of government regulation revealed a negative relationship between organizational internal factors and construction risk management, while government regulation moderated a positive relationship between organizational external factors and construction risk management. Likewise, all the hypotheses on the direct relationship between organizational factors and construction risk management were supported. In summary, the findings in this research demonstrate that government regulation can enhance risk management among construction companies operating in Nigeria. To enhance risk management among construction companies, project managers should give considerable attention to the organizational factors found to be influencing their risk management. 2016 Thesis https://etd.uum.edu.my/6584/ https://etd.uum.edu.my/6584/1/depositpermission_s96139.pdf text eng staffonly https://etd.uum.edu.my/6584/2/s96139_01a.pdf text eng public https://etd.uum.edu.my/6584/3/s96139_02.pdf text eng public Ph.D. doctoral Universiti Utara Malaysia Abbas, B. (2014, October 13, 2014). Kano Govt. revokes contract on sports college News Agency of Nigeria Retrieved from http://www.nannewsnigeria.com/kano-govt-revokes-contract-sportscollege. Abd El-Razek, M., Bassioni, H., & Mobarak, A. (2008). Causes of delay in building construction projects in Egypt. Journal of construction engineering and management, 134(11), 831-841. Abd El-Razek, M., Bassioni, H., & Mobarak, A. (2008). Causes of delay in building construction projects in Egypt. Journal of construction engineering and management, 134(11), 831-841. Abdul Hamid, R., Wan Yusuf, Z., and Singh, B. (2003). "Hazards at Construction Sites", The Proceedings of the 5th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2003), Johor Bahru, Malaysia. AbujaGalleria. (2005). Construction companies in Abuja, Nigeria. Retrieved January 4, 2015, from http://www.abujagalleria.com/Professional_Services/Construction_Building_Civil_Engineering.html Adams, O. (1997). Contractor development in Nigeria: perceptions of contractors and professionals. Construction Management & Economics, 15(1), 95-108. Agbo, A. E. (2014). Performance Evaluation of Labour Output of Indigenous Construction Firms in North-Central Nigeria. Civil and Environmental Research, 6(7), 116-121. Ahmed, I. (2008). "Adherence to Health and Safety Regulation on Construction Site". Unpublished Project. Ahmed, S. M., Ahmad, R., Saram, D., & Darshi, D. (1999). Risk management trends in the Hong Kong construction company: a comparison of contractors and owners perceptions. Engineering construction and Architectural management, 6(3), 225-234. Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction delays in Florida: An empirical study. Final report. Department of Community Affairs, Florida, US. Aibinu, A., & Jagboro, G. (2002). The effects of construction delays on project delivery in Nigerian construction company. International Journal of Project Management, 20(8), 593-599. Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of construction engineering and management, 132(7), 667-677. Aiken, L. & West, S. (1993). Detecting interactions in multiple regression: Measurement error, power, and design considerations. The Score, 16(1), 7-15. Akanni, P., Oke, A., & Akpomiemie, O. (2014). Impact of environmental factors on building project performance in Delta State, Nigeria. HBRC Journal. Akintoye, A. S., & MacLeod, M. J. (1997). Risk analysis and management in construction. International journal of project management, 15(1), 31-38. Akintunde, I. (2003). The Nigerian Construction Company: Past, Present, Problems and Prospects: Ibadan University Printery. Alaghbari, W. e., Kadir, M. R. A., & Salim, A. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. Al‐Hammad, A. (1993). Factors affecting the relationship between contractors and their sub‐contractors in Saudi Arabia: About 70% of contract work is subcontracted in Saudi Arabia, this paper highlights literature search and pilot interview findings. Building Research and Information, 21(5), 269-273. Ali, A. S., Smith, A., & Pitt, M. (2012). Contractors' Perception of factors contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia. Journal of Design and Built Environment, 7(1). Alinaitwe, H. M. (2008). An assessment of clients’ performance in having an efficient building process in Uganda. Journal of civil engineering and management, 14(2), 73-78. Alinaitwe, H. M. (2009). Prioritising lean construction barriers in Uganda's construction company. Journal of Construction in Developing Countries, 14(1), 15-30. Alwi, S., & Hampson, K. D. (2003). Identifying the important causes of delays in bulding construction projects. Amer, W. (1994). Analysis and evaluation of delays in construction projects in Egypt. Master thesis, Zagazig Univ., Zagazig, Egypt. Amer, W. E.-S. H. (2002). Expert System For Diagnosing Delay's Problems In Construction Projects In Egypt. Faculty of Engineering Construction Eng. Dept. Expert System For Diagnosing Delay's Problems In Construction Projects In Egypt A THESIS Submitted to the Faculty of Engineering, Zagazig University. Andi, (2006). The importance and allocation of risks in Indonesian construction projects. Construct Manage Economic; 24(1):69–80. Andrews, J. (1990) Building strategy: how to win, structure and manage projects, paper presented at the First ASEAN International Symposium on Construction and development, Kuala Lumpur. Aniekwu, A., & Okpala, D. (1988). Contractual arrangements and the performance of the Nigerian construction company (the structural component). Construction management and economics, 6(1), 3-11. Aniekwu, A. (1995). The business environment of the construction company in Nigeria. Construction Management and Economics, 13(6), 445-455. Ankrah, N., & Langford, D. (2005). Architects and contractors: a comparative study of organizational cultures. Construction Management and Economics, 23(6), 595-607. Aritua, B., Smith, N. J., & Bower, D. (2009). Construction client multi-projects–a complex adaptive systems perspective. International Journal of Project Management, 27(1), 72-79. Armstrong, J. S., & Overton, T. S. (1977). Estimating Nonresponse Bias in Mail Surveys. Journal of Marketing Research 14, 396-402. Asishana, J. (2013, May 10, 2013.). Aliyu Revoked N2.6BN Road Projects, Newswatch Times. Retrieved from http://www.mynewswatchtimesng.com/aliyu- revokes-n2-6bn-roadprojects/ Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995). Causes of delay in large building construction projects. Journal of management in engineering, 11(2), 45-50. Asgari, S., Awwad, R., Kandil, A., & Odeh, I, (2016). “Impact of considering need for work and risk on performance of construction contractors: An agent-based approach”. Automation in Construction, 65, 9-20. Ayobami, A. (2012, November 24, 2012). About 12,000 federal projects abandoned accros Nigeria, Premium Times News. Retrieved from http://www.premiumtimesng.com/news/108450-about-12000-federalprojects-abandoned-across-nigeria. html Babbie, E. R. (1973). Survey research methods. Belmont, CA: Wadsworth. Babbie, E. (2004) The Practice of Social Research, 10 ed. The US: Wadsworth, Thomson Learning, Inc. Bacon, D. R., Sauer, P. L., & Young, M. (1995). Composite reliability in structural equations modeling. Educational and Psychological Measurement, 55, 394-406. doi: 10.1177/0013164495055003003. Bagozzi, R. P., & Yi, Y. (1988). On the evaluation of structural equation models. Journal of the academy of marketing science, 16(1), 74-94. Bakar, A., Bin, A. H., Ali, K., Onyeizu, E. N., & Yusof, M. N. (2012). EVALUATING RISK MANAGEMENT PRACTICES IN CONSTRUCTION INDUSTRY: EVIDENCE FROM OMAN. International Journal of Academic Research, 4(2). Bakar, A. H. A., Tabassi, A. A., Razak, A. A., & Yusof, M. N. (2012). Key factors contributing to growth of construction companies: a Malaysian experience. World Applied Sciences Journal, 19(9), 1295-1304. Balogun, M. Oludare (2006) Clients’ perception on measures of indigenous contractors performance in the Nigeria construction company. The professional builder. Pg. 10-16. Baloi, D., & Price, A. D. (2003). Modelling global risk factors affecting construction cost performance. International journal of project management,21(4), 261-269. Banaitiene, N., & Banaitis, A. (2012). Risk Management in Construction Projects. Edited by Nerija Banaitiene, 429. Barber, E., & Wan, J. (2005). Leadership in project management: from firefighter to firelighter, Management Decision, 43 (7/8), 1032-1039. Barber, R. B. (2005). Understanding internally generated risks in projects. International Journal of Project Management, 23(8), 584-590. Barbosa, Í., & Carlos, C.C. (2007). Managing diversity in academic organizations: a challenge to organizational culture. Women in Management Review, 22(4), 274. Barclay, D., Higgins, C., & Thompson, R. (1995). The partial least squares (PLS) approach to causal modelling. Technology Studies, 2, 285-323. Baron, R. M., & Kenny, D. A. (1986). The moderator–mediator variable distinction in social psychological research: Conceptual, strategic, and statistical considerations. Journal of personality and social psychology, 51(6), 1173. Bharadwaj, A. S. (2000). A resource-based perspective on information technology capability and firm performance: an empirical investigation. MIS quarterly, 169-196. Bijttebier, P., Delva, D., Vanoost, S., Bobbaers, H., Lauwers, P., & Vertommen, H. (2000). Reliability and Validity of the Critical Care Family Needs Inventory in a Dutch-speaking Belgian sample. Heart & Lung: The Journal of Acute andCritical Care, 29, 278-286. doi: http://dx.doi.org/10.1067/mhl.2000.107918. Bollen, K. A. (1998). Structural equation models: Wiley Online Library. Borge, D. (2001). The Book of Risk, New York (US), John Wiley &Sons, Inc. Bothroyed, C. & Emmett, J., (1998). Risk Management – a practical guide for professionals. London, UK: Whitherby & Co Ltd. Braimah, N. & Ndekugri, I. (2008). Factors influencing the selection of delay analysis methodologies. International Journal of Project Management, 26, 789–799. Bramble, B. B., and Callahan, M. T. (1992). Construction delay claims, 2nd Ed., Wiley, New York. Bresnen, M., & Marshall, N. (2000). Building partnerships: case studies of client–contractor collaboration in the UK construction company. Construction Management & Economics, 18(7), 819-832. Bufaied, A. (1987). Risks in the construction company: their causes and their effects at the project level. University of Manchester, Institute of Science and Technology. BurtonShAw-Gunn, S. A. (2009). Risk and Financial Management in Construction: Gower Publishing, Ltd. Cameron, K. S., & Quinn, R. E (1999). Diagnosing and Changing Organizational Culture: Based on the Competing Values Framework. New York, NY: Addison-Wesley. Capon, N., Farley, J. U., Lehmann, D. R., & Hulbert, J. M. (1992). Profiles of product Innovators among large U.S. manufacturer. Management Science, 38(2), 157-169. Cassel, C., Hackl, P., & Westlund, A. H. (1999). Robustness of partial leastsquares method for estimating latent variable quality structures. Journal of AppliedStatistics, 26, 435-446. doi: 10.1080/02664769922322. Cavignac J. (2009). Managing risk in a construction company [Internet]. Construction Business Owner 2009; November [cited 2015 March 1]. Availablefrom:http://www.constructionbusinessowner.com/topics/insurance/constructioninsurance/ managing-risk-construction-company. Chapman, R. J. (2001). The controlling influences on effective risk identification and assessment for construction design management. International Journal of Project Management, 19(3), 147-160. Chatterjee, S., & Yilmaz, M. (1992). A Review of regression diagnostics for behavioral research. Applied Psychological Measurement, 16, 209-227. doi: 10.1177/014662169201600301. Chernick, M. R. (2008). Bootstrap methods. A guide for practitioners and researchers (2nd ed.). Hoboken, New Jersey: John Wiley & Sons, Inc. 241 Cheung, S.O., Suen, H.C.H., Cheung, K.K.W, (2004). PPMS: a Web based construction Project Performance Monitoring System, Autom. Constr. 13(3) 361–366. Chin, W.W. (1998a). Issues and opinion on structural equation modeling. MIS Quarterly, 22, 1, VII-XVI. Chin, W. W. (1998b). The partial least squares approach for structural equation modeling. In George A. Marcoulides (Ed.), Modern Methods for BusinessResearch, Lawrence Erlbaum Associates, Lawrence Erlbaum Associates, Mahwah, NJ, 295-336. Chin, W. W., Marcolin, B. L., & Newsted, P. R. (2003). A partial least squares latent variable modeling approach for measuring interaction effects: Results from a Monte Carlo Simulation study and an electronic-mail emotion/adoption study. Information Systems Research, 14, 189-217. doi: 10.1287/isre.14.2.189.16018. Chin, W. (2010). How to write up and peport PLS analyses. In V. Esposito Vinzi, W. W. Chin, J. Henseler & H. Wang (Eds.), Handbook of Partial Least Squares (pp. 655-690): Springer Berlin Heidelberg. Christopher Frey, H., & Patil, S. R. (2002). Identification and review of sensitivity analysis methods. Risk analysis, 22(3), 553-578. CIA. (2015). The work of a nation. The centre of intelligence The World Factbook Retrieved February 4, 2015 https://www.cia.gov/library/publications/the-world-factbook/geos/ni.html Clemen, R.T., Reilly, T., (2001). Making Hard Decisions with Decision Tools. Duxbury, Pacific, Grove, CA. Clough, R. H. (1979). Construction Project Management, Canada, John Wiley & Sons, Inc. Cohen, L. & Manion, L. (1980). Research methods in education. London: Groom Helm Ltd. Cohen, J. (1988). Statistical power analysis for the behavioral sciences (2nd ed.). Hillsdale, NJ: Lawrence Erlbaum Associates, Inc. Cohen, A., & Vigoda, E. (2000). Do good citizens make good organizational citizens? An empirical examination of the relationship between general citizenship and organizational citizenship behaviour in Israel. Administration & Society, 32(5), 596-624. Cooper, D. R., & Schindler, P. S. (2001). Business Research Methods (Seventh Edition.). Singapore: McGraw-Hill Irwin. CorporateNigeria. (2015). Nigeria construction overview, the awakening of a sleeping giant. Retrieved February 2, 2015, from http://www.corporatenigeria.com/index/construction/ construction_overview.html Creswell, J. W. (1994). Research design: qualitative & quantitative approaches. London: SAGE Publications. Creswell, J. W. (2003). Research Design: Qualitative, Quantitative, and Mixed Methods Approach, London, Sage. Creswell, J. W., Fetters, M. D., & Ivankova, N. V. (2004). Designing a mixed methods study in primary care. The Annals of Family Medicine, 2(1), 7-12. Cretu, O., Stewart, R. B., & Berends, T. (2011). Risk management for design and construction (Vol. 77): John Wiley & Sons. Crotty, M. (1998). The foundations of social research: Meaning and perspective in the research process: Sage. Daramola, A., & Ibem, E. O. (2010). Urban environmental problems in Nigeria: Implications for sustainable development. Journal of Sustainable Development in Africa, 12(1), 124-145. David, M., & Sutton, C. D. (2011). Social research: An introduction: Sage. Dawson, J. (2013). Moderation in Management Research: What, Why, When, and How. Journal of Business and Psychology, 1 -19. doi: 10.1007/s10869-013-9308-7. Deal, T. E., & Kennedy, A. A. (1982). Corporate Culture. Reading: Addison-Wesley. Department of Economic and Social Affairs, (1962). Report of the Ad Hoc Group of Experts on Housing and Urban Development, United Nations, New York. Detert, J. R., Treviño, L. K., Burris, E. R., & Andiappan, M. (2007). Managerial modes of influence and counter productivity in organizations: A longitudinal business-unit-level investigation. Journal of Applied Psychology, 92, 993–1005 doi: 10.1037/0021-9010.92.4.993. De Vaus, D. A. (2002). Survey in social research, fifth edition. Australia Allen & Unwin. Dey PK, Ogunlana SO. (2002). Risk based decision support system for effective implementation of projects. Int J Risk Assess Manage; 3(2/3/4): 189–204. Dey PK, Ogunlana SO. (2004). Selection and application of risk management tools and techniques for build-operate-transfer projects. Ind Manage Data Syst;104(4):334– 346. Dey PK. (2011). Issues and challenges of managing projects in India: A case study. In: Budhwar PS, Varma A, editors. Doing business in India: Building research-based practice. New York: Routledge. Dijkstra, T. (1983). Some comments on maximum likelihood and partial least squares methods. Journal of Econometrics, 22, 67-90. doi: http://dx.doi.org/10.1016/0304-4076(83)90094-5. Dikmen, M.T. Birgonul, J.H.M. Tah, G. Aouad, (2007). A learning based approach for risk management, in: Lauri Koskela, Phil Roberts (Eds.), International Symposium Towards the Formation of Theory for the Built Environment, Salford, UK, pp. 21– 36. Dikmen, I., Birgonul, M., Anac, C., Tah, J., & Aouad, G. (2008). Learning from risks: A tool for post-project risk assessment. Automation in construction, 18(1), 42-50. Dillman, D. A. (1978). Mail and telephone Survey: Total design method New York: John Willey & Sons. Dillman, D. A. (2000). Mail and internet surveys: the tailored design method. Brisbane: Wiley. Dlakwa, M.M. and Culpin, M.F. (1990) Reasons for overrun in public sector construction projects in Nigeria. ProjectManagement, 8, 237- 41. Dissanyaka., S.M, Kumaraswamy, M.M, (1999). Comparing contributors to time and cost performance in building projects, Build. Environ. 34 (1) 31–32. Doloi, H. (2009). Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success. Construction Management and Economics, 27(11), 1099-1109. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. Donald, B. & Boyd, P. 1992. Professional Construction Management McGraw-Hill, Inc. Doug, A., Burton, N., Cuthill, I., Festing, M., & Hutton, J. Playle, L. (2006). Why do a pilot study? www.je-lks.org/index.php/full-volumes/english-version-2005?task. Duarte, P., & Raposo, M. (2010). A PLS model to study brand preference: An application to the mobile phone market. In V. Esposito Vinzi, W. W. Chin, J. Henseler & H. Wang (Eds.), Handbook of Partial Least Squares (pp. 449-485): Springer Berlin Heidelberg. Dulaimi, M. F., Nepal, M. P., & Park, M. (2005). A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics, 23(6), 565-577. Duygulu, E., & Ozeren, E (2009). The effect of leadership style and organizational culture on firm’s innovativeness. African Journal of Business Management, 3(9), 475-485. EASHW, (2003). Facts: Accident Prevention in the Construction Sector. European Agency for Safety and Health at Work (EASHW), European Commission Senior Labour Inspectors’ Committee, Belgium. Ebhomele, E. (2104, October 14, 2014.). Lagos Assembly Summons Contractors Over Poor Performance, PMNEWS. Retrieved from http://www.pmnewsnigeria.com/2014/10/14/lagos-assembly-summonscontractors-over-poor- performance-2/ Edmonds, G.A. and Miles, D.W. (1984) Foundations forchange, aspects of the Construction company in developing countries Intermediate Technology, London. Eldin, N. (1989), ‘‘Cost control systems for PMT use’’, Transactions of the AACE, F3.1-F3.5. Elinwa, A. U., & Buba, S. A. (1993). Construction cost factors in Nigeria. Journal of construction engineering and management, 119(4), 698-713. Elinwa, A., & Uba, A. (2001). Failure factors in the Nigerian construction company. Nigerian Journal of Engineering and Management, 2(1), 16-21. Elliott, A. C., & Woodward, W. A. (2007). Statistical analysis: Quick reference guidebook with SPSS examples. Thousand Oaks, CA: Sage Publications. El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction company. International Journal of Project Management, 26(4), 431-438. Enshassi, A., Mohamed, S., Mustafa, Z. A., & Mayer, P. E. (2007). Factors affecting labour productivity in building projects in the Gaza Strip. Journal of civil engineering and management, 13(4), 245-254. Eskesen SD, Tengborg P, Kampmann J, Veicherts TH. (2004).Guidelines for tunnelling risk management, International Tunnelling Association, Working Group No. 2-1. Tunn Undergr Sp Tech; 19(3):217–237. Ezeldin, A. S., & Sharara, L. M. (2006). Neural networks for estimating the productivity of concreting activities. Journal of construction engineering and management, 132(6), 650-656. Faber, W. (1997). Protecting Giant Projects: A Study of Problems and Solutions in the Area of Risk and Insurance, England, Ipswich, UK, Willis Faber. Falk, R. F., & Miller, N. B. (1992). A primer for soft modeling. Ohio: The University of Akron Press. Fang, D, Li, M, Fong, P.S, Shen, L., (2004). Risks in Chinese construction market–contractors’ perspective. J Construct Eng Manage;130(6):853–61. Faridi, A. S., & El‐Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction company. Construction Management and Economics, 24(11), 1167-1176. Faul, F., Erdfelder, E., Lang, A.-G., & Buchner, A. (2007). G*Power 3: A flexible statistical power analysis program for the social, behavioural, and biomedical sciences. Behaviour Research Methods, 39, 175-191. Federal Republic of Nigeria (FRN), (1991). National Construction Policy. Federal Government Press, Lagos. Fereig, S. & Kartam, N. (2006). Construction Delay in International Projects: With special reference to the Arabian Gulf area Causes, Damage Assessments and Entitlements. Ferreira, M. P., Li, D., & Serra, F. (2008). Firm characteristics and country institutional development: Business relationships with foreign firms in transition economies. Fewings, P. 2005. Construction Project Management: An Integrated Approach, New York, Tylor & Francis. Field, A. (2009). Discovering Statistics using SPSS (3rd ed.). London: Sage Publications. Flamholtz, E. G., Das, T., & Tsui, A. S. (1985). Toward an integrative framework of organizational control. Accounting, Organizations and Society, 10(1), 35-50. Flanagan, R., & Norman, G. (1993). Risk management and construction.Oxford, Blackwell Science Ltd. Flanagan R, Norman G, Chapman R. (2006). Risk management and construction. 2nd ed. Oxford: Blackwell Pub. Fornell, C., & Larcker, D. F. (1981). Evaluating structural equation models with unobservable and measurement error. Journal of Marketing Research, 18, 39-50. Fornell, C., & Bookstein, F. L. (1982). Two structural equation models: LISREL and PLS applied to consumer exit-voice theory. Journal of Marketing research, 440-452. Federal Office of Statistics (FOS) (2015), Annual Abstract ofStatistics, FOS, Abuja. Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21(5), 321-326. Frohlich, M. T. (2002). Techniques for improving response rates in OM survey research. Journal of Operations Management, 20(1), 53-62. Gann, D. M. (1996). Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction Management & Economics, 14(5), 437-450. Gann, D. M., & Salter, A. J. (2000). Innovation in project-based, service-enhanced firms: the construction of complex products and systems. Research policy, 29(7), 955-972. Gann, D. M., Wang, Y., & Hawkins, R. (1998). Do regulations encourage innovation?-the case of energy efficiency in housing. Building Research & Information, 26(5), 280-296. Geisser, S. (1974). A predictive approach to the random effect model. Biometrika, 61, 101-107. doi: 10.1093/biomet/61.1.101. Geraldi, J. G., Lee-Kelley, L., & Kutsch, E. (2010). The Titanic sunk, so what? Project manager response to unexpected events. International Journal of Project Management, 28(6), 547-558. Gerrish, K., & Lacey, A. (2010). The research process in nursing: John Wiley & Sons. Ghoddousi, P., & Hosseini, M. R. (2012). A survey of the factors affecting the productivity of construction projects in Iran. Technological and Economic Development of Economy, 18(1), 99-116. Gibb, K. (2011). Delivering new affordable housing in the age of austerity: housing policy in Scotland. International Journal of Housing Markets and Analysis, 4(4), 357-368. Gilbertson, A., Kappia, J., Bosher, L. S., & Gibb, A. G. (2011). Preventing catastrophic events in construction. Gray, C. F. & Larson, E. W. (2003). Project Management, USA, McGraw-Hill. Greenberg, J., & Baron, R.A. (2008). Behavior in organizations,9th edition, New Jersey: Pearson prentice hall. Green, S.D. (2001). Towards an integrated script for risk and value management, Project Management 7 (1) 52– 58. Griffith, A., & Headley, J. (1998). Management of small building works. Construction Management & Economics, 16(6), 703-709. Goodhue, D., Lewis, W., & Thompson, R. (2007). Research note-statistical power in analysing interaction effects: questioning the advantage of PLS with product indicators. Information Systems Research, 18(2), 211-227. Götz, O., Liehr-Gobbers, K., & Krafft, M. (2010). Evaluation of structural Equation models using the partial least squares (PLS) approach. In Handbook of partial least squares (pp. 691-711). Springer Berlin Heidelberg. Hair, J. F. Jr., Black, W. C., Babin, B. J., Anderson, R. E., & Tatham, R. L. (2006). Multivariate Data Analysis (6th ed). US: Prentice-Hall PTR. Hair, J.F., Money, A.H., Samouel, P., & Page, M. (2007). Research methods for business, International edition, England: John Wiley & Sons Ltd. Hair, J. F., Jr., Black, W. C., Babin, B. J., Andersen, R. E., & Tatham, R. L. (2010). Multivariate data analysis (7th ed.). Upper Saddle River, NJ: Pearson Prentice Hall. Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011). PLS-SEM: Indeed a silver bullet. The Journal of Marketing Theory and Practice, 19(2), 139-152. Hair, J. F., Sarstedt, M., Pieper, T. M., & Ringle, C. M. (2012). The Use of Partial Least Squares Structural Equation Modeling in Strategic Management Research: A Review of Past Practices and Recommendations for Future Applications. LongRange Planning, 45(6), 320-340. doi: http://dx.doi.org/10.1016/j.lrp.2012.09.008 Hair, J. F., Ringle, C. M., & Sarstedt, M. (2013). Editorial-partial least squares structural equation modelling: Rigorous applications, better results and higher acceptance. Long Range Planning, 46(1-2), 1-12. Hair, J. F., Hult, G. T. M., Ringle, C. M., & Sarstedt, M. (2014). A primer on partialleast squares structural equation modeling (PLS-SEM). Thousand Oaks: Sage Publications. Hällgren, M., & Wilson, T. L. (2008). The nature and management of crises in construction projects: projects-as-practice observations. International Journal of Project Management, 26(8), 830-838. Hamid, A., Rahim, A., Yusuf, W., Zulkifli, W., & Singh, B. (2003). "Hazards at Construction Sites", The Proceedings of the 5th Asia-Pacific Structural Engineeringand Construction Conference (APSEC 2003), Johor Bahru, Malaysia. Hartog, D. N., & Verburg, R. M. (2004). High performance work systems, organisational culture and firm effectiveness. Human Resource Management Journal, 14(1), 55-78. Hart, C. (1998). Doing a Literature review: Releasing the Social Science Reaserch Imagination. London: SAGE Publications. Hartono, B., Nugroho, F.I., Saputra, B.A., (2012). Biases in project estimation: experimental evidence. The 13th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2012). APIEMS, Phuket, Thailand, pp. 13–18. Hartono, B., & Saputra, B. A. (2012). Are the experts really experts? A cognitive ergonomics investigation for project estimations. Jurnal Teknik Industri, 14(2), 115-122. Hartono, B., Sulistyo, S. R., Praftiwi, P. P., & Hasmoro, D. (2014). Project risk: Theoretical concepts and stakeholders' perspectives. International Journal of Project Management, 32(3), 400-411. Haseeb, M., Bibi, A., & Rabbani, W. (2011). Problems of projects and effects of delays in the construction company of Pakistan. Australian Journal of Business and Management Research, 1(5), 41-50. Hastak, M., & Shaked, A. (2000). ICRAM-1: Model for international construction risk assessment. Journal of management in engineering, 16(1), 59-69. Hayduk, L. A., & Littvay, L. (2012). Should researchers use single indicators, best indicators, or multiple indicators in structural equation models?. BMC medical research methodology, 12(1), 159. Healy, J. R. (1982). Contingency funds evaluation. Association for the Advancement of Cost Engineering (AACE) Transactions. Heerkens, G. (2001). Project Management, McGraw-Hill Professional. Helm, S., Eggert, A., & Garnefeld, I. (2010). Modeling the impact of corporate reputation on customer satisfaction and loyalty using partial least squares. In V. Esposito Vinzi, W. W. Chin, J. Henseler & H. Wang (Eds.), Handbook of Partial Least Squares (pp. 515-534): Springer Berlin Heidelberg. Henn, M., Weinstein, M., & Foard, N. (2005). A short introduction to social research: Sage. Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009). The use of partial least Squares path modeling in international marketing. In R. R. Sinkovics & P. N. Ghauri (Eds.), Advances in International Marketing (Vol. 20, pp. 277-320). Bingley: Emerald. Henseler, J., & Chin, W. W. (2010a). A Comparison of Approaches for the Analysis of Interaction Effects Between Latent Variables Using Partial Least Squares Path Modeling. Structural Equation Modeling: A Multidisciplinary Journal,17(1), 82-109. doi: 10.1080/10705510903439003. Henseler, J., & Fassott, G. (2010a). Testing Moderating Effects in PLS Path Models: An Illustration of Available Procedures. In V. Esposito Vinzi, W. W. Chin, J. Henseler & H. Wang (Eds.), Handbook of Partial Least Squares: Concepts,Methods and Applications (pp. 713-735). Berlin et al.: Springer. Henseler, J., & Chin, W. W. (2010b). A comparison of approaches for the analysis of interaction effects between latent variables using partial least squares path modeling. Structural Equation Modeling, 17(1), 82-109. doi: 10.1080/10705510903439003. Henseler, J., & Sarstedt, M. (2013). Goodness-of-fit indices for partial least squares path modeling. Computational Statistics, 28, 565-580. doi: 10.1007/s00180- 012-0317-1. Hertz, D. B., & Thomas, H. (1983). Risk analysis and its applications: Wiley Chichester etc. Hilmi, M. F., Ramaya, T., Mustapha, Y., & Pawanchik, S. (2010). Product and Process Innovativeness: Evidence from Malaysian SMEs. European Journal of Social Sciences, 16(4), 556-564. Ho, S. S., & Pike, R. H. (1992). The use of risk analysis techniques in capital investment appraisal. Risk Analysis Assessment and Management, 71-94. Hofstede, G. (1980). Culture and organizations. International Studies of Management & Organization, 15-41. Hofstede, G., Neuijen, B., Ohayv, D. D., & Sanders, G. (1990). Measuring organizational cultures: A qualitative and quantitative study across twenty cases. Administrative science quarterly, 286-316. Hossain, M. E. (2013). An investigation on tourism consumers' choice behaviour towardstour destination loyalty (Doctoral dissertation). Retrieved from http://espace.library.curtin.edu.au/R?func=dbin-jumpfull&object_id=190331. Hubbard, D. W. (2009). The failure of risk management: why it's broken and how to fix it: John Wiley and Sons. Hulland, J. (1999). Use of partial least squares (PLS) in strategic management research: a review of four recent studies. Strategic management journal, 20(2), 195-204. Hulley, S. B. (2007). Designing clinical research. Lippincott Williams & Wilkins, p. 168-169. www.2shared.com/document/. Hwang, B.-G., Zhao, X., & Ng, S. Y. (2013). Identifying the critical factors affecting schedule performance of public housing projects. Habitat International, 38, 214-221. Ibrahim, A. D., Price, A. D. F., & Dainty, A. R. J. (2006). The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), 149-164. ILO (1987) Guidelines for the Development of Small-scaleConstruction Enterprises. ILO, Geneva. Inmyxai, S., & Takahashi, Y. (2009). Firm resources and business performance in the Lao PDR: Implications for SMEs in the LDC context. Journal of Indian Business Research, 1(2/3), 163-187. Institution of Civil Engineers and the Actuarial Profession (2005). Risk analysis and management for projects (RAMP). 2nd ed. Institution of Civil Engineers and the Actuarial Profession. London: Thomas Telford Ltd. Institute, P. M. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide): Project Management Institute, Incorporated. IRM (2002). A Risk Management Standard. In: Management, T. I. O. R. (Ed.). London. Iroegbu, A.N. (2005). Housing in Nigeria: A role of the construction company. In A.I. Kalu & G.N. Chima (eds). Housing development in Nigeria: Concepts, issues and strategies. Abakaliki: Pauliton press. Ismail, E. (2001). “Industrialized building system for housing in Malaysia”, paper presented at the 6th Asia Pacific Science and Technology Management Seminar, Tokyo. Israelsson, N., & Hansson, B. (2009). Factors influencing flexibility in buildings. Structural Survey, 27(2), 138-147. Jaafari, A. (2001). Management of risks, uncertainties and opportunities on projects: time for a fundamental shift. International Journal of Project Management, 19(2), 89-101. Jabnoun, N., & Sedrani, K. (2005). TQM, culture, and performance in UAE manufacturing firms. Quality Management Journal, 12(4), 8. Jannadi, O. A. (2008). Risks associated with trenching works in Saudi Arabia. Building and Environment, 43(5), 776-781. Jantan, M., Nasurdin, A. M., & Fadzil, N. F. A. (2003). Designing Innovative Organizations in Malaysia: Do Structure and Culture Matter? Global Business Review, 4(2), 213-226. Jarkas, A. M., Haupt, T. C., & Haupt, T. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1). Jaworski, B. J. (1988). Toward a theory of marketing control: environmental context, control types, and consequences. The Journal of Marketing, 52, 23-39. Jobber, D. (1989). An examination of the effects of questionnaire factors on response to an industrial mail survey. International Journal of Research in Marketing, 6, 129-140. doi: http://dx.doi.org/10.1016/0167-8116(89)90006-2. Johnston, H. (2002). Productivity and the work flow process, in ASC Proceedings of the 38th Annual Conference. Blacksburg, VA, 157–164. Kamaruddeen, A. M., Yusof, N. A., Said, I., & Pakir, A. H. K. (2012). Organizational Factors and Innovativeness of Housing Developers. American Journal of Applied Sciences, 9(12). Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management & Economics, 15(1), 83-94. Kangari, R. (1995). Risk management perceptions and trends of US construction. Journal of construction engineering and management, 121(4), 422-429. Kangari, R., & Riggs, L. S. (1989). Construction risk assessment by linguistics. Engineering Management, IEEE Transactions on, 36(2), 126-131. Kaplan, S., & Garrick, B. J. (1981). On the quantitative definition of risk. Risk analysis, 1(1), 11-27. Karim Jallow, A., Demian, P., N. Baldwin, A., & Anumba, C. (2014). An empirical study of the complexity of requirements management in construction projects. Engineering, Construction and Architectural Management, 21(5), 505-531. Karim, N., Rahman, I., Memmon, A., Jamil, N., & Azis, A. (2012). Significant risk factors in construction projects: Contractor's perception. Paper presented at the Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on. KarimiAzari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011). Risk assessment model selection in construction company. Expert Systems with Applications, 38(8), 9105-9111. Kartam, N., Flood, I., & Koushki, P. (2000). Construction safety in Kuwait: issues, procedures, problems, and recommendations. Safety Science, 36(3), 163-184. Kartam, N. A., & Kartam, S. A. (2001). Risk and its management in the Kuwaiti construction company: a contractors’ perspective. International Journal of Project Management, 19(6), 325-335. Kendrick, T. (2003). Identifying and managing project risk: essential tools for failure-proofing your project: AMACOM Div American Mgmt Assn. Kenny, D. A., & Judd, C. M. (1984). Estimating the nonlinear and interactive effects of latent variables. Psychological Bulletin, 96, 201-210. doi: 10.1037/0033- 2909.96.1.201. Kerlinger, F. N. (1973). Foundations of behavioral research (2 ed.). New York: Holt, Rinehart and Winston. Keoki, S. Sears G.A. Clough R.H. (2008). Construction project management – A practical guide to field construction management. 5th ed. Hoboken: John Wiley & Sons. Kerzner, H. (2001). Project Management: A Systems approach to planning, scheduling, and controlling Ohio, John Wiley & Sons, Inc. Kim, D. Y., Han, S. H., Kim, H., & Park, H. (2009). Structuring the prediction model of project performance for international construction projects: A comparative analysis. Expert Systems with Applications, 36(2), 1961-1971. Kling, G., & Weitzel, U. (2011). The internationalization of Chinese companies : firm characteristics, company effects and corporate governance. Research in International Business and Finance, 25(3), 357-372. Knowles, C., Hansen, E., & Dibrell, C. (2008). Measuring firm innovativeness: Development and refinement of a new scale. Journal of Forest Products Business Research, 5(5), 1-24. Kolltveit, B. J., Karlsen, J. T., & Grønhaug, K. (2007). Perspectives on project management. International Journal of Project Management, 25(1), 3-9. Kotter, J., & Heskett, J. (1992). Corporate Culture and Performance: Free Pr. Koushki, P., Al‐Rashid, K., & Kartam, N. (2005). Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), 285-294. Kumaraswamy, M. M., & Chan, D. W. (1998). Contributors to construction delays. Construction Management & Economics, 16(1), 17-29. Kumar, B. (2012). Theory of planned behaviour approach to understand the purchasing behaviour for environmentally sustainable products. (W.P. No. 2015-11-08). http://www.iimahd.ernet.in/assets/ snippets/workingpaperpdf/10260621182012-12-08.pdf. Kuo, T.-H., & Kuo, Y.-L. (2010). The effect of corporate culture and total quality management on construction project performance in Taiwan. Total Quality Management, 21(6), 617-632. Lagos State Government, S. T. B. (2009). List of Registered contractors in Lagos State Nigeria. Retrieved January 4, 2015 http://www.stb.lagosstate.gov.ng/contractorslist. php Lai, K.-H., Ngai, E., & Cheng, T. (2005). Information technology adoption in Hong Kong's logistics company. Transportation Journal, 1-9. Lambert, D. M., & Harrington, T. C. (1990). Measuring nonresponse bias in customer service mail surveys. Journal of Business Logistics, 11(2), 5-25. Larson, E. W. & Gray, C. F. (2011). Project Management: The Managerial Process, McGraw-Hill, Inc. Laufer, A. and Coheca, D. (1990), ‘‘Factors affecting construction planning outcomes’’, Journal of Construction Engineering and Management, Vol. 116 No. 6, pp. 135-56. Leavitt, H. J., & Whisler, T. L. (1958). Management in the 1980’s: November. Leopoulos, V.N., Kirytopoulos, K.A. and Malandrakis, C. (2006), “Risk management for SMEs: tools to use and how”, Production Planning and Control, Vol. 17 No. 3, pp. 322-332. Lester, A. (2007). Project management, planning and control: managing engineering, construction and manufacturing projects to PMI, APM and BSI standards. 5th ed. Amsterdam; Boston Elsevier/Butterworth-Heinemann. Levy, S. M. (2001). Construction Building Envelope and Interior Finishes Databook: McGraw Hill. Lewis, W., Agarwal, R., & Sambamurthy, V. (2003). Sources of influence on beliefs about information technology use: an empirical study of knowledge workers. MIS quarterly, 657-678. Li, Y., Yang, M.-H., Klein, G., & Chen, H.-G. (2011). The role of team problem solving competency in information system development projects. International Journal of Project Management, 29(7), 911-922. Lifson, M. W., & Shaifer, E. F. (1982). Decision and risk analysis for construction management. JOHN WILEY & SONS, INC., 605 THIRD AVE., NEW YORK, NY 10158. 1982. Lindner, J. R., & Wingenbach, G. J. (2002). Communicating the handling of nonresponse error in Journal of Extension Research in Brief articles. Journal ofExtension, 40(6), 1-5. Ling, F. Y. Y., & Hoi, L. (2006). Risks faced by Singapore firms when undertaking construction projects in India. International Journal of Project Management, 24(3), 261-270. Ling, F.Y.Y., Low, S.P., Wang, S.Q., Lim, H.H, (2007). Key project management practices affecting Singaporean firms’ project performance in China, Int. J. Proj. Manag. 27 (1) 59–61. Liu, Y. W., Zhao, G. F., & Wang, S. Q. (2010). Many hands, much politics, multiple risks–the case of the 2008 Beijing Olympics Stadium. Australian Journal of Public Administration, 69(s1), S85-S98. Lo, T. Y., Fung, I. W., & Tung, K. C. (2006). Construction delays in Hong Kong civil engineering projects. Journal of construction engineering and management, 132(6), 636-649. Lockyer, K. & Gordon, J. 1996. Project Management and Project Network Techniques, London,Financial Times-Pitman Publishing. Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in developing countries: a case study from Vietnam. International Journal of Project Management, 22(7), 553-561. Loosemore, M. (1998). The three ironies of crisis management in construction projects. International Journal of Project Management, 16(3), 139-144. Luu, V. T., Kim, S.-Y., Tuan, N. V., & Ogunlana, S. O. (2009). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1), 39-50. Mak, S., & Raftery, J. (1992). Risk attitude and systematic bias in estimating and forecasting. Construction Management and Economics, 10(4), 303-320. Malešević, E., Kekanović, M., & Čeh, A. (2007). Lob method apply in process of construction material planning. Zbornik radova Građevinskog fakulteta, Subotica(16), 157-162. Manavazhi, M. R., & Adhikari, D. K. (2002). Material and equipment procurement delays in highway projects in Nepal. International Journal of Project Management, 20(8), 627-632. Mansfield, N., Ugwu, O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254-260. Marcus, B., Schuler, H., Quell, P., & Hümpfner, G. (2002). Measuring counter productivity: Development and initial validation of a German self-report questionnaire. International Journal of Selection and Assessment, 10(1 -2), 18- 35. doi: 10.1111/1468-2389.00191. Marczyk, G., DeMatteo, D., & Festinger, D. (2005). Essentials of research design and methodology: John Wiley & Sons Inc. Mason, G. E. (1973). Quantitative Risk Management Approach to the Selection of Construction Contract Provisions: Department of Civil Engineering, Stanford University. Mawdesley, M., Askew, W. and O’Reilly, M. (1997), Planning and Controlling Construction Projects: The Best Laid Plans, Addison Wesley Longman and The Chartered Institute of Building, Essex, pp. 42-67. Maylor, H. (2003). Project Management, Essex, Pearson Education Limited. McKim, R.A. (1991), “Risk behaviour/risk allocation and contract strategy” in Bezelga, A. and Brandon, P. (Eds), Management, Quality and Economics in Building, E. & F. N. Spon, London, pp. 199-206. Memon, A.H., Ismail, A.R., Ade Asmi, A. and Nor Hazana, A. (2013), “Using structural equation modelling to assess effects of construction resource related factors on cost overrun”, WorldApplied Sciences Journal, Vol. 21, pp. 6-15 (Mathematical Applications in Engineering). Mezher, T. M., & Tawil, W. (1998). Causes of delays in the construction company in Lebanon. Engineering, Construction and Architectural Management, 5(3), 252-260. McCrae, R. R., Kurtz, J. E., Yamagata, S., & Terracciano, A. (2011). Internal consistency, retest reliability, and their implications for personality scale validity. [Article]. Personality & Social Psychology Review (Sage PublicationsInc.), 15(1), 28-50. doi: 10.1177/1088868310366253. Mills, A. (2001). A systematic approach to risk management for construction: Structuralsurvey. Victoria, Australia, University Press: University of Melbourne. Moavenzadeh, F. & Rosow J. (1999). Risks and risk analysis in construction management, Proceedings of the CIB W65, Symposium on Organization and Management of Construction,US National Academy of Science, May, 1999, Washington DC, USA. Mobley, M., Slaney, R. B., & Rice, K. G. (2005). Cultural validity of the Almost Perfect Scale--Revised for African American college students. Journal of Counseling Psychology, 52(4), 629. Moe, T. L., & Pathranarakul, P. (2006). An integrated approach to natural disaster management: public project management and its critical success factors. Disaster Prevention and Management, 15(3), 396-413. Mojahed, S., & Aghazadeh, F. (2008). Major factors influencing productivity of water and wastewater treatment plant construction: evidence from the deep south USA. International Journal of Project Management, 26(2), 195-202.