Financial factors and impacts of project delays in Malaysian construction industry

The construction industry has been determined as one of the main pillars toward a country’s development. Project delays are one of the crucial issues facing the construction industry. Delays give major impacts in terms of on time project delivery, cash flow management, and the required quality. Prev...

Full description

Saved in:
Bibliographic Details
Main Author: Wan Aide Indera, Wan Adnan
Format: Thesis
Language:eng
eng
Published: 2017
Subjects:
Online Access:https://etd.uum.edu.my/7430/1/s816312_01.pdf
https://etd.uum.edu.my/7430/2/s816312_02.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uum-etd.7430
record_format uketd_dc
institution Universiti Utara Malaysia
collection UUM ETD
language eng
eng
advisor Mohd Nawi, Mohd Nasrun
topic HG Finance
spellingShingle HG Finance
Wan Aide Indera, Wan Adnan
Financial factors and impacts of project delays in Malaysian construction industry
description The construction industry has been determined as one of the main pillars toward a country’s development. Project delays are one of the crucial issues facing the construction industry. Delays give major impacts in terms of on time project delivery, cash flow management, and the required quality. Previous studies highlighted general factors of delay that lead to the failure of contractor performance, including non-financial factors, but financial factors are significant issues in the Malaysian construction industry. Therefore, this study investigated the factors and impacts of financial difficulties faced by contractors in the Malaysian construction industry. The study objective was to investigate the causes of financial issues, to analyse the implications of financial issues and its effects, and to identify the available options and strategic methods to resolve these financial issues. Structured interview sessions were conducted using standard structured questions involving seven respondents who were selected based on their experience and competence in running construction projects in Malaysia. The results of the study revealed that the main causes of delay in construction projects included lack of cash flow management, past due payment received from client, and difficulties in obtaining funds from financial institutions. The implications of these financial issues and their effects on delayed projects would lead to total abandonment, delayed for one to three years from expected delivery date to the clients, increased costs of the project, low quality workmanship, incomplete construction projects, bad reputation to the contractors and clients, budget overrun, time overrun, upward review of contract sum, and revised contract prices. The recommendations to improve and overcome financial issues faced included better managing the cash flow, budget, and payment received from clients.
format Thesis
qualification_name masters
qualification_level Master's degree
author Wan Aide Indera, Wan Adnan
author_facet Wan Aide Indera, Wan Adnan
author_sort Wan Aide Indera, Wan Adnan
title Financial factors and impacts of project delays in Malaysian construction industry
title_short Financial factors and impacts of project delays in Malaysian construction industry
title_full Financial factors and impacts of project delays in Malaysian construction industry
title_fullStr Financial factors and impacts of project delays in Malaysian construction industry
title_full_unstemmed Financial factors and impacts of project delays in Malaysian construction industry
title_sort financial factors and impacts of project delays in malaysian construction industry
granting_institution Universiti Utara Malaysia
granting_department School of Economics, Finance & Banking
publishDate 2017
url https://etd.uum.edu.my/7430/1/s816312_01.pdf
https://etd.uum.edu.my/7430/2/s816312_02.pdf
_version_ 1747828217366970368
spelling my-uum-etd.74302021-08-18T08:25:42Z Financial factors and impacts of project delays in Malaysian construction industry 2017 Wan Aide Indera, Wan Adnan Mohd Nawi, Mohd Nasrun School of Economics, Finance & Banking School of Economics, Finance and Banking HG Finance The construction industry has been determined as one of the main pillars toward a country’s development. Project delays are one of the crucial issues facing the construction industry. Delays give major impacts in terms of on time project delivery, cash flow management, and the required quality. Previous studies highlighted general factors of delay that lead to the failure of contractor performance, including non-financial factors, but financial factors are significant issues in the Malaysian construction industry. Therefore, this study investigated the factors and impacts of financial difficulties faced by contractors in the Malaysian construction industry. The study objective was to investigate the causes of financial issues, to analyse the implications of financial issues and its effects, and to identify the available options and strategic methods to resolve these financial issues. Structured interview sessions were conducted using standard structured questions involving seven respondents who were selected based on their experience and competence in running construction projects in Malaysia. The results of the study revealed that the main causes of delay in construction projects included lack of cash flow management, past due payment received from client, and difficulties in obtaining funds from financial institutions. The implications of these financial issues and their effects on delayed projects would lead to total abandonment, delayed for one to three years from expected delivery date to the clients, increased costs of the project, low quality workmanship, incomplete construction projects, bad reputation to the contractors and clients, budget overrun, time overrun, upward review of contract sum, and revised contract prices. The recommendations to improve and overcome financial issues faced included better managing the cash flow, budget, and payment received from clients. 2017 Thesis https://etd.uum.edu.my/7430/ https://etd.uum.edu.my/7430/1/s816312_01.pdf text eng public https://etd.uum.edu.my/7430/2/s816312_02.pdf text eng public masters masters Universiti Utara Malaysia Ab Halim, M. S. B., Junoh, M. Z. B. M., & Kamil, S. B. (2014). Financial performance and the management issues of Bumiputera construction firms in the Malaysian construction industry. Advances in Environmental Biology, 654-662. Abdullah, A. A., Mukmin, M. N., & Samad, Z. A. (2011). Application of Project Management Methods in the Construction of Bungalow House Project: A Case Study In Kuala Terengganu, Malaysia. International Journal of Economics and Management Sciences, 1(2), 42-58. Abdul-Rahman, H., Berawi, M. A., Berawi, A. R., Mohamed, O., Othman, M., & Yahya, I. A. (2006). Delay mitigation in the Malaysian construction industry. Journal of construction engineering and management, 132(2), 125-133. Abdul-Rahman, H., Takim, R., & Min, W. S. (2009). Financial-related causes contributing to project delays. Journal of Retail & Leisure Property, 8(3), 225-238. Aiyetan, O. A., Smallwood, J. J., & Shakantu, W. (2008). Influences on construction project delivery time performance. In the proceeding of Third Built Environment conference, Cape Town, South Africa. Alaghbari, W. E., Razali A. Kadir, M., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. Al-Ghafly, M. A. (1995). Delay in the construction of public utility projects in Saudi Arabia (Doctoral dissertation, King Fahd University of Petroleum and Minerals). Ali, A. S., Smith, A., & Pitt, M. (2012). Contractors' perception of factors contributing to project delay: case studies of commercial projects in Klang Valley, Malaysia. Journal of Design and Built Environment, 7(1). Al-Juwairah, Y. A. (1997). Factors Affecting Construction Costs in Saudi Arabia. Unpublished Master Thesis, King Fahd University of Petroleum and Minerals, Saudi Arabia. Retrieved from. Arain, F. M. (2008). Causes of insolvency and unethical practices of contractors in Pakistan construction industry. In Journal of International Conference on Building Education and Research (BEAR) ‘Building Resilience (Vol. 1115). Arora, H. (2011). Research Methodology: a step-by-step guide for beginners. Abhigyan, 29(3), 62-64. Ballesteros-Pérez, P., del Campo-Hitschfeld, M. L., González-Naranjo, M. A., & González-Cruz, M. C. (2015). Climate and construction delays: case study in Chile. Engineering, Construction and Architectural Management, 22(6), 596-621. Fellows, R. F., & Liu, A. M. (2015). Research methods for construction. John Wiley & Sons. Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of project management, 21(5), 321-326. GONZÁLEZ, J. J. C. (1969). Ranjit Kumar. Research methodology: a step-by-step guide for beginners. Halim, M. S. A., Jaafar, M., Osman, O., & Haniff, M. S. (2012). Financial Ratio Analysis: An Assessment of Malaysian Contracting Firms. Journal of Construction in Developing Countries, Supp, 1, 71-78. Hamzah, N., Khoiry, M. A., Arshad, I., Badaruzzaman, W. H. W., & Tawil, N. M. (2012). Identification of the causes of construction delay in Malaysia. World Academy of Science, Engineering and Technology, 72, 614-619. Hasmori, M. F., Ismail, I., & Said, I. (2012, March). Issues of Late and Non-Payment among Contractors in Malaysia. In 3rd International Conference on Business and Economic Research Proceeding (pp. 12-13). HOE, Y. E. (2013). Causes of abandoned construction projects in Malaysia (Doctoral dissertation, Department of Surveying, Faculty of Engineering and Science, Universiti Tunku Abdul Rahman). Ismail, I. A. (2014). Financial cash flow determinants of company failure in the construction Industry (Doctoral dissertation, The University of Michigan). McLellan, E., MacQueen, K. M., & Neidig, J. L. (2003). Beyond the qualitative interview: Data preparation and transcription. Field methods, 15(1), 63-84. Rosazuwad, M. (2010). The factors and effect of delay in government construction project (case study in Kuantan) (Doctoral dissertation, Universiti Malaysia Pahang). Nawi, M. N. M., Shaharanee, I. N. M., Hashim, K. F., Azman, M. N. A., & Ibrahim, S. H. (2015). Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects. Advanced Science Letters, 21(6), 2134-2138. Olawale, Y. A., & Sun, M. (2010). Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), 509-526. Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of project management, 25(5), 517-526. Sandelowski, M. (2000). Focus on research methods-whatever happened to qualitative description? Research in nursing and health, 23(4), 334-340. Shebob, A. (2012). Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. Shehu, Z., Endut, I. R., & Akintoye, A. (2014). Factors contributing to project time and hence cost overrun in the Malaysian construction industry. Journal of Financial Management of Property and Construction, 19(1), 55-75. Srivastava, A., & Thomson, S. B. (2009). Framework analysis: a qualitative methodology for applied policy research. Sunjka, B. P., & Jacob, U. (2013, June). Significant causes and effects of project delays in the niger delta region, Nigeria. In Southern African Institute of Industrial Engineering 2013. Taylor, J. E., & Jaselskis, E. J. (2009). Introduction to the special issue on research methodologies in construction engineering and management. Teku, A. Y. (2015). Effects of Delayed Payment on Projects and Stakeholders: A Case Study of Keta Municipal Assembly (Doctoral dissertation). Trauner Jr, T. J. (2009). Construction delays: understanding them clearly, analyzing them correctly. Butterworth-Heinemann. University of Ulster. School of Built Environment. (1996). Journal of Financial Management of Property and Construction. MCB University Press. Yap, Q. F. (2013). A study on the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur. Zaimi, M., & Majid, A. (1997). Non-excusable delays in construction (Doctoral dissertation, © Abd. Majid MZ).