Systemic process of “on-time delivery” in aerospace composites manufacturing company
There is a lack of systemic resource deployment strategy in producing the right, acceptable quality of wing panel, in the right quantity, complete and delivered on time. Thus, a study was done to examine the systemic impact of the number of labour, output, output accuracy and work-in-process on on-t...
Saved in:
主要作者: | Rozita, Long |
---|---|
格式: | Thesis |
语言: | eng eng |
出版: |
2018
|
主题: | |
在线阅读: | https://etd.uum.edu.my/7835/1/Depositpermission_s93542.pdf https://etd.uum.edu.my/7835/2/s93542_01.pdf |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
A Case Study of An Aerospace Company: Challenges, Impacts, and Strategies in Procurement and Inventory Integration to Enhance Supply Chain Resilience
由: Teh, Yi Ling
出版: (2024) -
A Study of Green HRM Practices In Manufacturing Companies In Perlis
由: Runismar, Razali
出版: (2020) -
Safety citizenship behaviours among the employees in a manufacturing company
由: Muhammad Syafiq Athir, Husni
出版: (2020) -
Information Sharing Along Supply Chain In Malaysian Manufacturing Companies
由: Vafaei Zadeh, Ali
出版: (2017) -
The relationship between agency cost and corporate performance among manufacturing companies in Malaysia
由: Nasaruddin, Md Yusoff
出版: (2019)