The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry

<p>The objective of this study is to determine the relationship between 5S lean tool and</p><p>Value Stream Mapping (VSM) towards Warehouse Performance (WP) among</p><p>Malaysian manufacturing industry. A total of 378 responses we...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Fadzil Harun
Format: thesis
Language:eng
Published: 2020
Subjects:
Online Access:https://ir.upsi.edu.my/detailsg.php?det=11610
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:<p>The objective of this study is to determine the relationship between 5S lean tool and</p><p>Value Stream Mapping (VSM) towards Warehouse Performance (WP) among</p><p>Malaysian manufacturing industry. A total of 378 responses were received by using</p><p>the online survey with response rate of 15.55%. This study used structural equation</p><p>modeling technique. The results showed the positive and significant direct effect</p><p>between 5S lean tool and WP ((HI =0.628, p<0.001), 5S lean tool and VSM</p><p>(1-12=0.614, p<0.001), VSM and WP (H3=0.269, p<0.05) and lastly the indirect effect</p><p>of VSM (0.165) with p (0.022) <0.05) in the relationship between 5S lean tool and</p><p>WP. Therefore, VSM was partially mediated the relationship between 5S lean tool</p><p>and WP (direct effect= 0.628, pO.OOl, indirect effect=0.165 with p (0.022) <0.05). In</p><p>conclusion, there are positive and significant effect between 5S lean tool and WP, 5S</p><p>lean tool and VSM, VSM and WP and mediating effect of VSM occurs between 5S</p><p>lean tool and WP among Malaysian manufacturing industry. The findings showed that</p><p>Malaysian manufacturing industry can implement 5S lean tool and VSM, and this</p><p>lead to enhance their WP. Thus, the findings are important and useful in increasing</p><p>knowledge to determine 5S lean tool and VSM on WP among Malaysian</p><p>manufacturing industry. The implication of this study is useful to make important</p><p>decisions concerning the 5S lean tool, VSM, and WP in the Malaysian manufacturing</p><p>industry.</p>