Hanapi, F. (2015). Defect liability period in the construction contract: Lessons learnt from an institution of higher education (IOHE) building project (IR).
توثيق أسلوب شيكاغو (الطبعة السابعة عشر)Hanapi, Fait. Defect Liability Period in the Construction Contract: Lessons Learnt from an Institution of Higher Education (IOHE) Building Project (IR). 2015.
توثيق جمعية اللغة المعاصرة MLA (الطبعة الثامنة)Hanapi, Fait. Defect Liability Period in the Construction Contract: Lessons Learnt from an Institution of Higher Education (IOHE) Building Project (IR). 2015.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.