Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DL...
Saved in:
Main Author: | Fait Hanapi |
---|---|
Format: | thesis |
Language: | eng |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.upsi.edu.my/detailsg.php?det=1271 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Leveraging on lesson learnt in Jabatan Kerja Raya project management
by: Hamzah, Ramlan
Published: (2011) -
Contractor's liabilities towards employer's defective building work claims during defect liability period
by: Lim, Tze Shwan
Published: (2011) -
Occurrences of building defects during defects liability periods of low-cost housing projects / Addruse Hassan
by: Hassan, Addruse
Published: (2006) -
Contractor's liability relating to defective works that are discovered after the defects liability period
by: Leong, Mei Wan
Published: (2010) -
Law and governance of waqf in selected higher education institutions (HEIs) in Malaysia: lessons learnt from Turkey / Rohayati Hussin
by: Hussin, Rohayati
Published: (2020)