Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
<p>This study was aimed to develop financial management framework for Industrialised</p><p>Building System (IBS) project through incorporation criteria which employed Analytic Hierarchy</p><p>Process (AHP) based on adaptation from...
Saved in:
Main Author: | |
---|---|
Format: | thesis |
Language: | eng |
Published: |
2019
|
Subjects: | |
Online Access: | https://ir.upsi.edu.my/detailsg.php?det=8599 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
oai:ir.upsi.edu.my:8599 |
---|---|
record_format |
uketd_dc |
institution |
Universiti Pendidikan Sultan Idris |
collection |
UPSI Digital Repository |
language |
eng |
topic |
|
spellingShingle |
Natasha Dzulkalnine Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP |
description |
<p>This study was aimed to develop financial management framework for Industrialised</p><p>Building System (IBS) project through incorporation criteria which employed Analytic Hierarchy</p><p>Process (AHP) based on adaptation from Saatys rule of thumb. The study also analysed the payment</p><p>issue of IBS project and factors influencing it. The criteria in the new payment method for IBS</p><p>project was also studied. The research design in this study was survey method. The research</p><p>instruments were survey questionnaire, interview protocol and focus groups. A sample of 172</p><p>respondents from 43 IBS projects in Klang Valley from the year 2008 until 2015 were selected using</p><p>the cluster sampling. Majority of IBS projects were saturated in Klang Valley. Data were analysed</p><p>using descriptive statistics which are mean and standard deviation to rank the payment issues and</p><p>Analytic Hierarchy Process (AHP) to select the criteria for IBS project in the development of</p><p>financial management framework. Cronbachs alpha had been undertaken to validate the instrument</p><p>with value of 0.881. Based on weightage of importance, the main criteria for the development of</p><p>financial framework for IBS project showed that the main key criteria are Material (31.0) followed</p><p>by Initial Cost (27.4), Contract Document (25.3) and Drawing and Design Matters (25.1) while for</p><p>the sub-criteria is the advance payment for initial stage (22.9). In conclusion, the most critical</p><p>criteria to take into consideration in new payment method is in terms of Material and Initial Cost.</p><p>The implication of the research is the financial management framework proposed can be used by the</p><p>industry players to resolve the payment issue in IBS project. The study also implicates that</p><p>tackling the main issues of payment of IBS project may assist the government and relevant parties</p><p>especially in the early stage of construction due to huge capital investment.</p><p></p> |
format |
thesis |
qualification_name |
|
qualification_level |
Doctorate |
author |
Natasha Dzulkalnine |
author_facet |
Natasha Dzulkalnine |
author_sort |
Natasha Dzulkalnine |
title |
Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP |
title_short |
Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP |
title_full |
Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP |
title_fullStr |
Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP |
title_full_unstemmed |
Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP |
title_sort |
development of financial management framework for industrialsed building system ibs project by using analytic hierarchy process ahp |
granting_institution |
Universiti Pendidikan Sultan Idris |
granting_department |
Fakulti Pengurusan dan Ekonomi |
publishDate |
2019 |
url |
https://ir.upsi.edu.my/detailsg.php?det=8599 |
_version_ |
1776104544341590016 |
spelling |
oai:ir.upsi.edu.my:85992023-01-16 Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP 2019 Natasha Dzulkalnine <p>This study was aimed to develop financial management framework for Industrialised</p><p>Building System (IBS) project through incorporation criteria which employed Analytic Hierarchy</p><p>Process (AHP) based on adaptation from Saatys rule of thumb. The study also analysed the payment</p><p>issue of IBS project and factors influencing it. The criteria in the new payment method for IBS</p><p>project was also studied. The research design in this study was survey method. The research</p><p>instruments were survey questionnaire, interview protocol and focus groups. A sample of 172</p><p>respondents from 43 IBS projects in Klang Valley from the year 2008 until 2015 were selected using</p><p>the cluster sampling. Majority of IBS projects were saturated in Klang Valley. Data were analysed</p><p>using descriptive statistics which are mean and standard deviation to rank the payment issues and</p><p>Analytic Hierarchy Process (AHP) to select the criteria for IBS project in the development of</p><p>financial management framework. Cronbachs alpha had been undertaken to validate the instrument</p><p>with value of 0.881. Based on weightage of importance, the main criteria for the development of</p><p>financial framework for IBS project showed that the main key criteria are Material (31.0) followed</p><p>by Initial Cost (27.4), Contract Document (25.3) and Drawing and Design Matters (25.1) while for</p><p>the sub-criteria is the advance payment for initial stage (22.9). In conclusion, the most critical</p><p>criteria to take into consideration in new payment method is in terms of Material and Initial Cost.</p><p>The implication of the research is the financial management framework proposed can be used by the</p><p>industry players to resolve the payment issue in IBS project. The study also implicates that</p><p>tackling the main issues of payment of IBS project may assist the government and relevant parties</p><p>especially in the early stage of construction due to huge capital investment.</p><p></p> 2019 thesis https://ir.upsi.edu.my/detailsg.php?det=8599 https://ir.upsi.edu.my/detailsg.php?det=8599 text eng closedAccess Doctoral Universiti Pendidikan Sultan Idris Fakulti Pengurusan dan Ekonomi <p>Abdullah, M. R., Kamar, K. A. M., Nawi, M. N. M., Haron, A. T., & Arif, M. (2009).</p><p>Industrialized Building System: A Definition and Concept. In ARCOM Conference</p><p>(pp. 79).</p><p></p><p>Abedi, M., Mohamad, M. F., & Fathi, M. S. (2011). Effects of Construction Delays on Construction</p><p>Project Objectives. The First Iranian Students Scientific Conference in Malaysia, 9 & 10 Apr 2011,</p><p>UPM, Malaysia, 18.</p><p></p><p>Abidin, A. R. Z. (2007). Simulation of industrialised building system formation for housing</p><p>construction. Master Project. Retrieved from http://eprints.utm.my/11242/</p><p></p><p>Ahmadian, F. F. A., Akbarnezhad, A., Rashidi, T. H., & Waller, S. T. (2016). Accounting for</p><p>Transport Times in Planning Off-Site Shipment of Construction Materials. Journal of </p><p>Construction Engineering and Management, 142(1).</p><p>https://doi.org/10.1061/(ASCE)CO.1943-7862.0001030.</p><p></p><p>Ariffin, H. L. T., Lynn, B. Y. H., Shukery, N. M., Rahiman, N. A., Mahmud, S. H., & Raslim, F. M.</p><p>(2018). Innovative Procurement Adoption for Industrialised Building System (IBS) Projects.</p><p>International Journal of Engineering & Technology, 7, 887 892.</p><p></p><p>Arnt Buvik. (2001). The industrial purchasing research framework: a comparison of theoretical</p><p>perspectives from micro economics, marketing and organization science. Journal of Business &</p><p>Industrial Marketing, 16(6), 439450. https://doi.org/10.1108/EUM0000000006019</p><p></p><p>Ashraf, M., Fateh, M., & Mohammad, M. F. (2018). Industrialized Building System ( IBS</p><p>) Provision in Local and International Standard Form of Contracts. Journal of Construction in</p><p>Developing Countries, 22(2), 6780.</p><p></p><p>Azman, M.N.A., Dzulkalnine, N., Hamid, Z. A., & Bing, K. W. (2014). Payment issue in Malaysian</p><p>construction industry: Contractors perspective. Jurnal Teknologi</p><p>(Sciences and Engineering), 70(1). https://doi.org/10.11113/jt.v70.2804</p><p></p><p>Azman, M.N.A., Mohamed Nor Azhari, Dzulkalnine, N., Kamar, K. A. M., Hamid, Z. A., & Nawi, M. N. M.</p><p>(2013). CIB 2013 World Congress Payment Scenario in the Malaysian Construction Industry Prior to</p><p>CIPAA.</p><p></p><p>Badir, Y. F., Kadir, M. R. A., & Hashim, A. H. (2002). Industrialized Building Systems Construction</p><p>in Malaysia. Journal of Architectural Engineering, 8(March).</p><p></p><p>Baharuddin, A., Rahman, A., & Omar, W. (2006). Issues and Challenges in the Implementation of</p><p>Industrialised Building Systems in Malaysia. In Proceedings of the 6th Asia-Pacific Structural</p><p>Engineering and Construction Conference (ASPEC 2006) (pp. 56).</p><p></p><p>Bank Negara Malaysia (BNM). (2018). Loans Applied by Sectors. Bank Negara Malaysia (BNM).</p><p></p><p>Begum, R. A., Satari, S. K., & Pereira, J. J. (2010). Waste Generation and Recycling : Comparison</p><p>of Conventional and Industrialized Building Systems. AmericalnJournal of Environmental</p><p>Sciences, 6(4), 383388.</p><p></p><p>Bland, J. M., & Altman, D. G. (1997). Statistics notes: Cronbachs alpha.</p><p>https://doi.org/http://dx.doi.org/10.1136/bmj.314.7080.572</p><p></p><p>Blismas, N. (2007). Off-site manufacture in Australia : Current state and future directions CRC for</p><p>Construction Innovation participants ER SE AR. Public Works. Retrieved from </p><p>http://www.construction- innovation.info/images/pdfs/Publications/Industry_publications/Off-</p><p>site_manufacture_in_Australia.pdf</p><p></p><p>Bloor, M., Frankland, J., Thomas, M., & Kate Robson. (2001). Focus Groups in Social Research. SAGE.</p><p></p><p>Bower, D. (2003). Management of Procurement. (D. Bower, Ed.) (1st Editio). London: Thomas Telford.</p><p>Retrieved from http://www.thomastelford.com</p><p></p><p>Chung, L. P. (2006). IMPLEMENTATION STRATEGY FOR INDUSTRIALISED</p><p>BUILDING SYSTEM. Universiti Teknologi Malaysia (UTM).</p><p>https://doi.org/10.1017/CBO9781107415324.004</p><p></p><p>CIDB. (2002). Survey on Problems Faced by Contractors in Raising Finance.</p><p></p><p>CIDB. (2003). Industrialised building systems (IBS) - roadmap 2003-2010, (72), 124.</p><p></p><p>CIDB. (2007). Construction Industry Master Plan Malaysia 2006-2015. . Construction Industry </p><p>Development Board Malaysia. Retrieved from</p><p>http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Construction+In</p><p>dustry+Malaysia+Master+Plan,+Malaysia+2006-2015#0</p><p></p><p>CIDB. (2009). The Feasibility of Guaranteed Maximum Price (GMP) Contract for Public Sector</p><p>Construction Projects. Kuala Lumpur: CIDB</p><p></p><p>CIDB. (2010). IBS-Roadmap 2011-2015. Construction Industry Development Board Malaysia. </p><p>Retrieved from http://www.cidb.gov.my/cidbv4/?option=com_content&view=article&id=594:ibs-</p><p>roadmap-2011-2015&catid=57&Itemid=577&lang=en</p><p></p><p>CIDB. (2012). Report on the Effectiveness of Industrialised Building System (IBS) for Government</p><p>Projects (1st ed.). CIDB.</p><p></p><p>CIDB. (2015a). Construction Industry Transformation Programme (CITP) 2016-2020.</p><p>https://doi.org/10.1007/s13398-014-0173-7.2</p><p></p><p>CIDB. (2015b). IBS Digest. CIDB, 33.</p><p></p><p>CIDB. (2017). CITP Report No. 3 Q4 2017.</p><p></p><p>CIDB, MPC, REHDA, & CREAM. (2014). An Introduction of Industrialised Building System Manual for</p><p>Developer. CIDB.</p><p></p><p>Construction Industry Development Board (CIDB). (2018). Construction Industry Review & Prospect</p><p>2018 / 2019. (Construction Industry Development Board (CIDB), Ed.). Kuala Lumpur: Construction</p><p>Industry Development Board (CIDB).</p><p></p><p>Creswell, J. W. (2012). Overview of Mixed Methods Research in Dissemination and</p><p>Implementation.Thousand Oaks: SAGE Publications Inc</p><p></p><p>Creswell, J. W. (2013). Research Design: Qualitative, Quantitative and Mixed Methods Approaches</p><p>(4th ed.). Thousand Oaks: SAGE Publications Inc</p><p></p><p>Creswell, J. W., & Clark, V. L. P. (2011). Designing and Conducting Mixed Methods Research (2nd</p><p>ed.). SAGE.</p><p></p><p>Crosthwaite, D. (2000). The Global Construction Market: A Cross Sectional Analysis. Construction </p><p>Management and Economics, 18(5), 619627. https://doi.org/10.1080/014461900407428</p><p></p><p>Central Unit of Procurement (CUP). (1993). HM Treasury: Central Unit on Procurement ; Guidance</p><p>Note No 41 Managing Risks and Contigency for Works Projects. London: CUP</p><p></p><p>Dalalah, D., Al-oqla, F., & Hayajneh, M. (2010). Application of the Analytic Hierarchy Process (</p><p>AHP ) in Multi- Criteria Analysis of the Selection of Cranes. Jordan Journal of Mechanical and</p><p>Industrial Engineering, 4(5), 567578.</p><p></p><p>Morgan. (1998). The Focus Group Guidebook.Portland: SAGE Publications Inc</p><p></p><p>Department of Statistics (DOS). (2018). Quarterly Construction Statistics, Second Quarter 2018.</p><p>Department of Statistics, Malaysia, (February), 12. Retrieved from</p><p>https://www.statistics.gov.my/index.php?r=column/cthemeByCat&cat=77&bul_id</p><p>=RlBvVUUwNVZnb0NkL2I2UnBjOUZhUT09&menu_id=OEY5SWtFSVVFVU pmUXEyaHppMVhEdz09</p><p></p><p>Doloi, H. (2008). Application of AHP in improving construction productivity from a management</p><p>perspective. Construction Management and Economics, 26(8), 841 854.</p><p>https://doi.org/10.1080/01446190802244789</p><p></p><p>Egbu, C., & Abdullah, M. (2011). Industrialised Building System in Malaysia: Issues for Research in</p><p>Changing Financial and Property Market. In Proceedings of the BUHU 9th International Post Graduate</p><p>Research Conference. University of Salford. Retrieved from http://usir.salford.ac.uk/12820/</p><p></p><p>Engineering News Record (ENR). (2005). World Market Overview. Ohio: McGraw-Hill Construction,.</p><p></p><p>Fewings, P., & Henjewele, C. (2019). Construction Project Management. (Routledge, Ed.) (Third</p><p>Edit). New York: Routledge.</p><p></p><p>Franks, J., & Harlow, P. A. (1984). Building Procurement Systems: A Guide to Building Project</p><p>Management (2nd ed.). Chartered Institute of Building.</p><p></p><p>George, D., & Mallery, P. (2003). SPSS for Windows Step by Step: Answers to Selected Exercises. A</p><p>Simple Guide and Reference. https://doi.org/9780335262588</p><p></p><p>Gibb, A. G., & Isack, F. (2003). Re-engineering through pre-assembly - client expectations and</p><p>drivers. Building Research & Information, 31, 146160. https://doi.org/10.1080/09613210302000</p><p></p><p>Gibbons, J. H. (1986). Technology, Trade and the U.S. Residential Construction Industry.Washington,</p><p>DC:U.S. Government Printing Office</p><p></p><p>Glass, J. (2000). The Future for Precast Concrete in Low-Rise Housing.Oxford: British Precast</p><p></p><p>Hamouda, H., & Abu-shaaban, N. (2015). Enhancing Labour Productivity Within Construction Industry</p><p>Through Analytical Hierarchy Process , the Case of Gaza Strip, 3(8), 329336.</p><p>https://doi.org/10.13189/ujm.2015.03080</p><p></p><p>Hassim, S., Jaafar, M. S., & Sazalli, S. A. A. H. (2009). The Contractor Perception Towers</p><p>Industrialised Building System Risk in Construction Projects in Malaysia. American Journal of</p><p>Applied Sciences, 6(5), 937942.</p><p></p><p>Ibrahim, M., Mohammad, M., Nekooie, A., Binti, N., & Kamaruddin, C. (2012). The Adequacy of</p><p>Contractual Provisions in Managing Construction Failure in Malaysia. European Journal of Business</p><p>and Management, 4(1), 2238. Retrieved from</p><p>http://www.iiste.org/Journals/index.php/EJBM/article/view/1023/943</p><p></p><p>Jaafar, M., & Radzi, N. M. (2013). Level of Satisfaction and Issues with Procurement Systems used</p><p>in the Malaysian Public Sector. Australasian Journal of Construction Economics and Building, 13(1),</p><p>50.</p><p></p><p>Jalil, Ahmad Abd, Jaafar, M., Mydin, A. O., & Nuruddin, A. R. (2017). The Application of</p><p>Procurement Systems in IBS Housing Project. International Journal Supply Chain Management, 6(4),</p><p>299307.</p><p></p><p>Jalil, Ahmad Abd, Nuruddin, A. R., Jaafar, M., & Mydin, A. O. (2015). New Procurement Method for</p><p>Housing Projects Implementing IBS Modular System. In International Conference on Advances in Civil</p><p>and Environmental Engineering (pp. 18).</p><p></p><p>Jalil, Ahmad Abdul, Jaafar, M., Mydin, A. O., & Nuruddin, A. R. (2017). How Industry Players</p><p>Perceived Payment Issues in Industrialised Building System (IBS) Housing Projects? Malaysian</p><p>Construction Research Journal, 2(2), 2235.</p><p></p><p>James Dean Brown. (1996). Testing in Language Programs. (Dominick Mosco, Ed.).</p><p>New Jersey: Prentice Hall Regents.</p><p></p><p>Jenny Kitzinger. (2008). The Methodology of Focus Groups: The Importance of Interaction between</p><p>Research Participants. Sociology of Health & Illness, 16(1), 103121.</p><p>https://doi.org/10.1111/1467-9566.ep11347023</p><p></p><p>Southern, J. (2016). Smart Construction. Aberdeen: KPMG</p><p></p><p>Kamar, K.A.M., Hamid, Z. A., & Dzulkalnine, N. (2012). Industrialised Building System (IBS)</p><p>construction: Measuring the perception of contractors in Malaysia. In BEIAC 2012 - 2012 IEEE</p><p>Business, Engineering and Industrial Applications Colloquium.</p><p>https://doi.org/10.1109/BEIAC.2012.6226077</p><p></p><p>Kamar, K. A. M., & Hamid, Z. A. (2011). Supply chain strategy for contractor in adopting</p><p>industrialized building system (IBS). Australian Journal of Basic and Applied , 5(12), 25522557.</p><p>Retrieved from http://ajbasweb.com/old/ajbas/2011/December- 2011/2552-2557.pdf</p><p></p><p>Kamar, K. A. M., Hamid, Z. A., & Mustapha Alshawi. (2009). Barriers To Industrialized Building</p><p>System (IBS): The Case of Malaysia. In Built and Human Environment 9th International Postgraduate</p><p>Research Conference (pp. 116).</p><p></p><p>Kamar, K. A. M., Hamid, Z. A., Zain, M. Z. M., & Ahmad Hazim Abd. Rahim. (2008). Industrialised</p><p>Building Systems (IBS): The Current State Malaysia and R&D Initiatives. Construction Research</p><p>Institute of Malaysia (CREAM).</p><p></p><p>Kapliski, O., & Tamoaitiene, J. (2010). Game theory applications in construction engineering and</p><p>management. Technological and Economic Development of Economy, 16(2), 348363.</p><p>https://doi.org/10.3846/tede.2010.22</p><p></p><p>Khalfan, M. M. A., Mcdermott, P., & Vrijhoef, R. (2005). The effect of procurement on the</p><p>integration of the supply chain within the construction industry. In Understanding the</p><p>Construction Business and Companies (pp. 1425).</p><p></p><p>Krippendorff, K. (2012). Content Analysis: An Introduction to Its Methodology.</p><p>California:SAGE Publications.</p><p></p><p>Kuder, G. F., & Richardson, M. W. (1937). The theory of the estimation of test reliability.</p><p>Psychometrika, 2(3), 151160. https://doi.org/10.1007/BF02288391</p><p></p><p>Lessing, J., Stehn, L., & Ekholm, A. (2005). Industrialised Housing Definition and Categorization</p><p>of the Concept. In International Group of Lean Construction Conference no 13.</p><p></p><p>Lewis, W. A. (2014). W . Arthur Lewis s Theory of Economic Growth : a Review with 50 years of</p><p>Foresight Derick Boyd University of East London.</p><p></p><p>Li, H. X., Al-Hussein, M., Lei, Z., & Ajweh, Z. (2013). Risk identification and assessment of</p><p>modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation. Canadian</p><p>Journal of Civil Engineering, 40(12), 11841195. https://doi.org/10.1139/cjce-2013-0013</p><p></p><p>Lincoln, Y. S., & Guba, E. G. (1985). Naturalistic Inquiry. (C. Beverly Hills, Ed.). SAGE</p><p>Publications.</p><p></p><p>Losby, J., & Wetmore, A. (2012). Using Likert Scale in Evaluation Survey Work.</p><p>California:CDC.</p><p></p><p>Love, P. E. D. (2002). Influence of Project Type and Procurement Method on Rework Costs in Building</p><p>Construction Projects, (February), 1829.</p><p></p><p>Macharis, C., Springael, J., Brucker, K. De, & Verbeke, A. (2004). PROMETHEE and AHP: The Design of</p><p>Operational Synergies in Multicriteria Analysis: Strengthening PROMETHEE with Ideas of AHP.</p><p>European Journal of Operational Research. https://doi.org/10.1016/S0377-2217(03)00153-X</p><p></p><p>Malaysian Productivity Corporation (MPC). (2017a). Construction Labour Productivity in Malaysia.</p><p>Kuala Lumpur: MPC</p><p></p><p>Malaysian Productivity Corporation (MPC). (2017b). Summary of Issues and Recommendations.</p><p>Kuala Lumpur: Malaysia Productivity Corporation (MPC).</p><p></p><p>Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016). Cost analysis for sustainable</p><p>off-site construction based on a multiple- case study in China. Habitat International, 57, 215222.</p><p>https://doi.org/10.1016/j.habitatint.2016.08.002</p><p></p><p>Marhani, M. A., Adnan, H., Baharuddin, H. E., Esa, M. R., & Hassan, A. A. (2012). Dependency of</p><p>Foreign Workers in Malaysian Construction Industry, 9(1), 3950.</p><p></p><p>Masterman, J. W. E. (2005). An Introduction to Building Procurement Systems. (J. W. E. Masterman,</p><p>Ed.) (Second). New York: Spon Press.</p><p></p><p>Melik, S. (2010). Cash Flow Analysis of Construction Projects Using. Middle East Technical</p><p>University.</p><p></p><p>Michnik, J., & Lo, M. (2005). Enhancement of Financial Risk Management With the Aid of Analytic</p><p>Hierarchy Process. In International Symposium on the Analytic Hierarchy Process.</p><p></p><p>Millet, I., & Wedley, W. C. (2002). Modelling Risk and Uncertainty with the Analytic Hierarchy</p><p>Process. Journal of Multi-Criteria Decision Analysis, 11(2), 97107.</p><p>https://doi.org/https://doi.org/10.1002/mcda.319</p><p></p><p>Miloevi, A., Miloevi, M., Miloevi, D., & Selimi, A. (2016). AHP Multi-Criteria Method for</p><p>Sustainable in Construction. In Conference Proceedings International Conference (pp. 929938).</p><p>https://doi.org/10.14415/konferencijaGFS</p><p></p><p>Ministry of Finance (MOF). (2008). Perlaksanaan Industrialised Building System (IBS) dalam projek</p><p>kerajaan (Vol. 3). Kuala Lumpur: MOF</p><p></p><p>Ministry of International Trade and Industry (MITI). (2019). Cabotage Policy. Retrieved from</p><p>https://www.miti.gov.my/index.php/glossary/term/184</p><p></p><p>Modular Building Institute. (2018). Modular Construction. Retrieved from</p><p>http://www.modular.org/HtmlPage.aspx?name=why_modular</p><p></p><p>Mohammed, A. H., & Ahmad, I. (2002). Pengurusan Projek Binaan: Pembiayaan dan Pengawalan Kos yang</p><p>Berkesan (2nd ed.). Dewan Bahasa dan Pustaka Kuala Lumpur.</p><p></p><p>Ghafar, M. N. A., (2003). Reka Bentuk Tinjauan Soal Selidik Pendidikan. Universiti Teknologi</p><p>Malaysia (UTM).</p><p></p><p>Morledge, R., & Smith, A. (2013). Building Procurement. (R. Morledge & A. Smith, Eds.) (2nd</p><p>Editio). Sussex: Wiley-Blacwell.</p><p></p><p>Moscarini, G., & Postel-Vinay, F. (2009). Large Employers Are More Cyclically Sensitive.</p><p>https://doi.org/10.3386/w14740</p><p></p><p>Musa, M. F., Mohammad, M. F., Yusof, M. R., & Mahbub, R. (2014). The Way Forward Industrialised</p><p>Building System (IBS) in Malaysia. In InCIEC 2014: Proceedings of the International Civil and</p><p>Infrastructure Engineering Conference 2014 (pp. 163 173). Springer.</p><p></p><p>Nawi, M. N. M., Lee, A., Kamar, K. A. M., & Hamid, Z. A. (2012). A Critical Literature Review on</p><p>the Concept of Team Integration in Industrialised Building System (IBS) Project. Malaysian</p><p>Construction Research Journal, 9(1), 17.</p><p></p><p>Nawi, M. N. M., Mydin, M. A. O., Nursal, A. T., Nifa, F. A. A., & Bahaudin, A. Y. (2015). Payment</p><p>issues in Malaysia Industrialised Building System ( IBS ): Literature visit Payment issues in</p><p>Malaysia Industrialised Building System ( IBS ): Literature visit. AENSI Journals, 9(4), 185188.</p><p></p><p>Nawi, N. M., Mydin, A. O., Nursal, A. T., Akmar, F., Nifa, A., & Hanafi, M. H. (2015). Payment</p><p>issues in Malaysia Industrialised Building System ( IBS ): A Research Framework, 9(March), 8891.</p><p></p><p>Nee, T. S., & Wei, C. L. (2013). Selection Criteria and the Related Sub-Criteria for the Selection</p><p>of Standard Form of Contract for Construction Projects in Sarawak. UNIMAS E-Journal of Civil</p><p>Engineering, 4(2), 3338.</p><p></p><p>Ngowi, A. B., Pienaar, E., & Mbachu, J. (2005). Globalisation of the construction industry: A</p><p>review of infrastructure financing. Journal of Financial Management of Property and Construction.</p><p>https://doi.org/http://dx.doi.org/10.1108/13664380680001079</p><p></p><p>NHBC Foundation. (2016). Modern Methods of Construction: views from the industry. IHS BRE </p><p> Press. Retrieved from</p><p>http://www.nhbcfoundation.org/Publications/Primary-Research/Modern-methods- of-construction-NF70</p><p></p><p>Nunnally, J. C., & Bernstein Ira H. (n.d.). Psychometric Theory (3rd ed.). New York: McGraw-Hill</p><p>Education (India) Pvt Limited.</p><p></p><p>Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of</p><p>offsite modern methods of construction. Construction Management and Economics, 25(2), 183194.</p><p></p><p>Pan, W., Sidwell, R., Pan, W. E. I., & Sidwell, R. (2011). Demystifying the cost barriers to</p><p>offsite construction in the UK Demystifying the cost barriers to offsite construction in the UK.</p><p>Construction Management and Economics, 29(November 2014), 10811099.</p><p>https://doi.org/10.1080/01446193.2011.637938</p><p></p><p>Peldschus, F., Zavadskas, E. K., Turskis, Z., & Tamoaitiene, J. (2010). Sustainable Assessment of</p><p>Construction Site by Applying Game Theory. Inzinerine Ekonomika- Engineering Economics, 21(3),</p><p>223237.</p><p></p><p>Perera, N., & Sutrisna, M. (2010). The Use of Analytic Hierarchy Process (AHP) in the Analysis of</p><p>Delay Claims in Construction Projects in the UAE. The Built & Human Environment Review, 3(1),</p><p>2947.</p><p></p><p>Persatuan Arkitek Malaysia (PAM). (2010). ARCHITECT S PERSPECTIVE ON IBS.</p><p></p><p>Pozin, M. A. A., & Nawi, M. N. M. (2017). The communication in industrialised building system ( IBS</p><p>) construction project : Virtual environment The communication in industrialised building system (</p><p>IBS ) construction project : Virtual environment Mohd Affendi Ahmad Pozin , and Mohd Nasrun Mohd N.</p><p>In AIP Conference Proceedings (p. 7). https://doi.org/10.1063/1.5005358</p><p></p><p>Rakhmatullin, R. (2016). Learning Together: Peer Review Methodology. Seville: European Commision</p><p></p><p>Ramanathan, R. (2001). A note on the use of the analytic hierarchy process for environmental impact</p><p>assessment. Journal of Environmental Management, 63(1), 2735.</p><p>https://doi.org/10.1006/jema.2001.0455</p><p></p><p>Richard, R. B. (2006). Industrialised , Flexible and Demountable Building Systems : Quality ,</p><p>Economy and Sustainability. The CRIOCM 2006 International Symposium on Advancement of</p><p>Construction Management and Real Estate INDUSTRIALISED, (Richard 2005), 111.</p><p></p><p>Rogan, a L., Lawson, R. M., & Bates-Brkljac, N. (2000). Value and Benefits Assessment of Modular</p><p>Construction. In Modular Matters Conference (pp. 124). Retrieved from </p><p>http://www.designforhomes.org/wp-</p><p>content/uploads/2012/03/ModularSteel.pdf</p><p></p><p>Bruno, R. (2007). A Generic Classification of Industrialised Building System. In Open Building</p><p>Manufacturing: Core Concepts and Industrial Requirements (pp. 5366). ManuBuild. </p><p>Retrieved from</p><p>http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Open+Building+</p><p>Manufacturing+Core+Concepts+and+Industrial+Requirements#0%5Cnhttp://schol</p><p>ar.google.com/scholar?hl=en&btnG=Search&q=intitle:Open+Building+Manufactu</p><p>ring:+Core+Concepts+and+Industrial+</p><p></p><p>Saaty, T. L. (1980). The Analytic Hierarchy Process. New York: McGraw Hill.</p><p></p><p>Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of</p><p>Services Sciences, 1(1), 83. https://doi.org/10.1504/IJSSCI.2008.017590</p><p></p><p>Saaty, T. L., & Vargas, L. G. (2012). Models, Methods, Concepts & Applications of the Analytic</p><p>Hierarchy Process. Pittsburgh:Springer.</p><p></p><p>Sajjad Zahir. (1999). Clusters in a Group: Decision Making in the Vector Space Formulation of the</p><p>Analytic Hierarchy Process. European Journal of Operational Research.</p><p>https://doi.org/10.1016/S0377-2217(98)00021-6</p><p></p><p>Sekaran, U., & Bougie, R. (2010). Research Methods for Business: A Skill Building Approach (5th</p><p>ed.). Chichester: John Wiley & Sons.</p><p></p><p>Serrano-Cinca, C., & Gutirrez-Nieto, B. (2013). A Decision Support System for Financial and </p><p>Social Investment. Applied Economics. https://doi.org/10.1080/00036846.2012.748180</p><p></p><p>Sherri, L. Jackson. (2012). Research Methods and Statistics: A Critical Approach (4th Editio).</p><p>Belmont: Cengage Learning.</p><p></p><p>Shukor, A. S. A., Mohammad, M. F., Mahbub, R., & Faridah Ismail. (2011). Supply chain integration</p><p>challenges in project procurement in Malaysia: The perspective of IBS manufacturers. Association of</p><p>Researchers in Construction Management, ARCOM 2011 - Proceedings of the 27th Annual Conference,</p><p>1(September 2011), 495504. Retrieved from </p><p>http://www.scopus.com/inward/record.url?eid=2-s2.0-</p><p>84861044849&partnerID=40&md5=37bdafccb50a60d54b5a33e07bfb80d7</p><p></p><p>Stewart, D. W., & Shamdasani, P. N. (2015). Focus Group: Theory and Practices (3rd ed.). Portland:</p><p>SAGE.</p><p></p><p>Sum, R. M. (2013). Risk Management Decision Making. In Proceeding of the International Symposium on</p><p>the Analytic Hierarchy Process. Retrieved from www.cranfield.ac.uk/cds/cfda</p><p></p><p>Tabish, S. Z. S., & Jha, K. N. (2011). Construction Management and Economics Identification and</p><p>evaluation of success factors for public construction projects Identification and evaluation of</p><p>success factors for public construction projects. Construction Management and Economics, </p><p>29(8), 809823. https://doi.org/10.1080/01446193.2011.611152</p><p></p><p>Thanoon, W. A., Peng, L. W., Kadir, M. R. A., Jaafar, M. S., & Salit, M. S. (2003). the Essential</p><p>Characteristics of Industrialised Building System. International Conference on Industrialised</p><p>Building Systems, Kuala Lumpur, Malaysia, (1999), 1011.</p><p></p><p>Todd D. Jick. (1979). Mixing Qualitative and Quantitative Methods: Triangulation in Action.</p><p>Administrative Science Quarterly, 24(4), 602611.</p><p></p><p>Torki, L., Dalali Isfahani, R., & Rezai, A. (2013). Ranking of financial and electronic debts using</p><p>analytic hierarchy process (AHP). New Marketing Research Journal, 2130.</p><p>https://doi.org/10.1109/ECDC.2013.6556751</p><p></p><p>Trikha, D. N., & Ali, A. A. A. (2004). Industrialised Building Systems. Universiti Putra Malaysia</p><p>(UPM).</p><p></p><p>Vichare, V. K., Aher, M. C., & Devalkar, R. V. (2015). Application Of Analytical Hierarchy Process</p><p>In Construction Of Residential Building Project. International Journal of Modern Trends in</p><p>Engineering and Research. Retrieved from www.ijmter.com</p><p></p><p>Vignesh, S., & Shanmugapriya, S. (2016). Improvement of Decision Making Process in Construction</p><p>Supply Chain Management using Analytical Hierarchy. International Journal of Emerging Technology</p><p>and Advanced Engineering, 6(4), 109118.</p><p></p><p>Vrijhoef, R. (1998). Co-makership in Construction towards Construction Supply Chain Management.</p><p>Delft University of Technology.</p><p></p><p>Walker, A. (2015). Project Management in Construction (1st ed.). Sussex: Wiley Blackwell.</p><p></p><p>Whitaker, R. (2007). Validation examples of the Analytic Hierarchy Process and Analytic</p><p>Network Process. Mathematical and Computer Modelling, 46, 840859.</p><p>https://doi.org/10.1016/j.mcm.2007.03.018</p><p></p><p>Wiley, J. (1984). Construction Funding: Where the Money Comes From (2nd ed.).</p><p>Sussex: A Wiley-Interscience Publication.</p><p></p><p>Xue, H., Zhang, S., Su, Y., & Wu, Z. (2017). Factors Affecting the Capital Cost of Prefabrication </p><p>A Case Study of China. Sustainability Journal, 1512(7), 122. https://doi.org/10.3390/su9091512</p><p></p><p>Xue, H., Zhang, S., Su, Y., & Wu, Z. (2018). Capital Cost Optimization for Prefabrication : A</p><p>Factor Analysis Evaluation Model. Journal of Sustainability, 159(10), 122.</p><p>https://doi.org/10.3390/su10010159</p><p></p><p>Yousefi, V., Golkhandan, A. R., Kiani, S., Yakhchali, S. H., & Mehrabanfar, E. (2015). Ranking of</p><p>Financing Methods in Iran Construction Renovation Projects: A Sensitivity Analysis Approach.</p><p>Mediterranean Journal of Social Sciences, 6(5S2), 303309.</p><p>https://doi.org/10.5901/mjss.2015.v6n5s2p303</p><p></p><p>Zakaria, Z., Ismail, S., & Yusof, A. M. (2013). An Overview of Comparison between Construction</p><p>Contracts in Malaysia : The Roles and Responsibilities of Contract Administrator in Achieving Final</p><p>Account Closing Success. In International Conference on Education and Educational Technologies (pp.</p><p>3441).</p><p></p><p>Zala, M. I., & Bhatt, R. B. (2011). An Approach of Contractor Selection By Analytical Heirarchy</p><p>Process. In National Conference on Recent Trends in Engineering & Technology (pp. 16).</p><p></p><p>Zawawi, M. (2009). Effectiveness of Industrialised Building System (IBS) Implementation for</p><p>Malaysian Construction Industry. Skudai: UTM</p><p></p><p>Zimmer, S., Klumpp, M., & Abidi, H. (2012). Industry Project Evaluation with the Analytic Hierarchy</p><p>Process. In Information Security Conference. Retrieved from</p><p>www.fom-ild.de</p><p></p> |