Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP

<p>This study was aimed to develop financial management framework for Industrialised</p><p>Building System (IBS) project through incorporation criteria which employed Analytic Hierarchy</p><p>Process (AHP) based on adaptation from...

Full description

Saved in:
Bibliographic Details
Main Author: Natasha Dzulkalnine
Format: thesis
Language:eng
Published: 2019
Subjects:
Online Access:https://ir.upsi.edu.my/detailsg.php?det=8599
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:ir.upsi.edu.my:8599
record_format uketd_dc
institution Universiti Pendidikan Sultan Idris
collection UPSI Digital Repository
language eng
topic
spellingShingle
Natasha Dzulkalnine
Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
description <p>This study was aimed to develop financial management framework for Industrialised</p><p>Building System (IBS) project through incorporation criteria which employed Analytic Hierarchy</p><p>Process (AHP) based on adaptation from Saatys rule of thumb. The study also analysed the payment</p><p>issue of IBS project and factors influencing it. The criteria in the new payment method for IBS</p><p>project was also studied. The research design in this study was survey method. The research</p><p>instruments were survey questionnaire, interview protocol and focus groups. A sample of 172</p><p>respondents from 43 IBS projects in Klang Valley from the year 2008 until 2015 were selected using</p><p>the cluster sampling. Majority of IBS projects were saturated in Klang Valley. Data were analysed</p><p>using descriptive statistics which are mean and standard deviation to rank the payment issues and</p><p>Analytic Hierarchy Process (AHP) to select the criteria for IBS project in the development of</p><p>financial management framework. Cronbachs alpha had been undertaken to validate the instrument</p><p>with value of 0.881. Based on weightage of importance, the main criteria for the development of</p><p>financial framework for IBS project showed that the main key criteria are Material (31.0) followed</p><p>by Initial Cost (27.4), Contract Document (25.3) and Drawing and Design Matters (25.1) while for</p><p>the sub-criteria is the advance payment for initial stage (22.9). In conclusion, the most critical</p><p>criteria to take into consideration in new payment method is in terms of Material and Initial Cost.</p><p>The implication of the research is the financial management framework proposed can be used by the</p><p>industry players to resolve the payment issue in IBS project. The study also implicates that</p><p>tackling the main issues of payment of IBS project may assist the government and relevant parties</p><p>especially in the early stage of construction due to huge capital investment.</p><p></p>
format thesis
qualification_name
qualification_level Doctorate
author Natasha Dzulkalnine
author_facet Natasha Dzulkalnine
author_sort Natasha Dzulkalnine
title Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
title_short Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
title_full Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
title_fullStr Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
title_full_unstemmed Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP
title_sort development of financial management framework for industrialsed building system ibs project by using analytic hierarchy process ahp
granting_institution Universiti Pendidikan Sultan Idris
granting_department Fakulti Pengurusan dan Ekonomi
publishDate 2019
url https://ir.upsi.edu.my/detailsg.php?det=8599
_version_ 1776104544341590016
spelling oai:ir.upsi.edu.my:85992023-01-16 Development of financial management framework for industrialsed building system IBS project by using analytic hierarchy process AHP 2019 Natasha Dzulkalnine <p>This study was aimed to develop financial management framework for Industrialised</p><p>Building System (IBS) project through incorporation criteria which employed Analytic Hierarchy</p><p>Process (AHP) based on adaptation from Saatys rule of thumb. The study also analysed the payment</p><p>issue of IBS project and factors influencing it. The criteria in the new payment method for IBS</p><p>project was also studied. The research design in this study was survey method. The research</p><p>instruments were survey questionnaire, interview protocol and focus groups. A sample of 172</p><p>respondents from 43 IBS projects in Klang Valley from the year 2008 until 2015 were selected using</p><p>the cluster sampling. Majority of IBS projects were saturated in Klang Valley. Data were analysed</p><p>using descriptive statistics which are mean and standard deviation to rank the payment issues and</p><p>Analytic Hierarchy Process (AHP) to select the criteria for IBS project in the development of</p><p>financial management framework. Cronbachs alpha had been undertaken to validate the instrument</p><p>with value of 0.881. Based on weightage of importance, the main criteria for the development of</p><p>financial framework for IBS project showed that the main key criteria are Material (31.0) followed</p><p>by Initial Cost (27.4), Contract Document (25.3) and Drawing and Design Matters (25.1) while for</p><p>the sub-criteria is the advance payment for initial stage (22.9). In conclusion, the most critical</p><p>criteria to take into consideration in new payment method is in terms of Material and Initial Cost.</p><p>The implication of the research is the financial management framework proposed can be used by the</p><p>industry players to resolve the payment issue in IBS project. The study also implicates that</p><p>tackling the main issues of payment of IBS project may assist the government and relevant parties</p><p>especially in the early stage of construction due to huge capital investment.</p><p></p> 2019 thesis https://ir.upsi.edu.my/detailsg.php?det=8599 https://ir.upsi.edu.my/detailsg.php?det=8599 text eng closedAccess Doctoral Universiti Pendidikan Sultan Idris Fakulti Pengurusan dan Ekonomi <p>Abdullah, M. R., Kamar, K. A. M., Nawi, M. N. M., Haron, A. T., & Arif, M. (2009).</p><p>Industrialized Building System: A Definition and Concept. In ARCOM Conference</p><p>(pp. 79).</p><p></p><p>Abedi, M., Mohamad, M. F., & Fathi, M. S. (2011). Effects of Construction Delays on Construction</p><p>Project Objectives. The First Iranian Students Scientific Conference in Malaysia, 9 & 10 Apr 2011,</p><p>UPM, Malaysia, 18.</p><p></p><p>Abidin, A. R. Z. (2007). Simulation of industrialised building system formation for housing</p><p>construction. Master Project. Retrieved from http://eprints.utm.my/11242/</p><p></p><p>Ahmadian, F. F. A., Akbarnezhad, A., Rashidi, T. H., & Waller, S. T. (2016). Accounting for</p><p>Transport Times in Planning Off-Site Shipment of Construction Materials. Journal of </p><p>Construction Engineering and Management, 142(1).</p><p>https://doi.org/10.1061/(ASCE)CO.1943-7862.0001030.</p><p></p><p>Ariffin, H. L. T., Lynn, B. Y. H., Shukery, N. M., Rahiman, N. A., Mahmud, S. H., & Raslim, F. M.</p><p>(2018). Innovative Procurement Adoption for Industrialised Building System (IBS) Projects.</p><p>International Journal of Engineering & Technology, 7, 887 892.</p><p></p><p>Arnt Buvik. (2001). The industrial purchasing research framework: a comparison of theoretical</p><p>perspectives from micro economics, marketing and organization science. Journal of Business &</p><p>Industrial Marketing, 16(6), 439450. https://doi.org/10.1108/EUM0000000006019</p><p></p><p>Ashraf, M., Fateh, M., & Mohammad, M. F. (2018). Industrialized Building System ( IBS</p><p>) Provision in Local and International Standard Form of Contracts. Journal of Construction in</p><p>Developing Countries, 22(2), 6780.</p><p></p><p>Azman, M.N.A., Dzulkalnine, N., Hamid, Z. A., & Bing, K. W. (2014). Payment issue in Malaysian</p><p>construction industry: Contractors perspective. Jurnal Teknologi</p><p>(Sciences and Engineering), 70(1). https://doi.org/10.11113/jt.v70.2804</p><p></p><p>Azman, M.N.A., Mohamed Nor Azhari, Dzulkalnine, N., Kamar, K. A. M., Hamid, Z. A., & Nawi, M. N. M.</p><p>(2013). CIB 2013 World Congress Payment Scenario in the Malaysian Construction Industry Prior to</p><p>CIPAA.</p><p></p><p>Badir, Y. F., Kadir, M. R. A., & Hashim, A. H. (2002). Industrialized Building Systems Construction</p><p>in Malaysia. Journal of Architectural Engineering, 8(March).</p><p></p><p>Baharuddin, A., Rahman, A., & Omar, W. (2006). Issues and Challenges in the Implementation of</p><p>Industrialised Building Systems in Malaysia. In Proceedings of the 6th Asia-Pacific Structural</p><p>Engineering and Construction Conference (ASPEC 2006) (pp. 56).</p><p></p><p>Bank Negara Malaysia (BNM). (2018). Loans Applied by Sectors. Bank Negara Malaysia (BNM).</p><p></p><p>Begum, R. A., Satari, S. K., & Pereira, J. J. (2010). Waste Generation and Recycling : Comparison</p><p>of Conventional and Industrialized Building Systems. AmericalnJournal of Environmental</p><p>Sciences, 6(4), 383388.</p><p></p><p>Bland, J. M., & Altman, D. G. (1997). Statistics notes: Cronbachs alpha.</p><p>https://doi.org/http://dx.doi.org/10.1136/bmj.314.7080.572</p><p></p><p>Blismas, N. (2007). Off-site manufacture in Australia : Current state and future directions CRC for</p><p>Construction Innovation participants ER SE AR. Public Works. Retrieved from </p><p>http://www.construction- innovation.info/images/pdfs/Publications/Industry_publications/Off-</p><p>site_manufacture_in_Australia.pdf</p><p></p><p>Bloor, M., Frankland, J., Thomas, M., & Kate Robson. (2001). Focus Groups in Social Research. SAGE.</p><p></p><p>Bower, D. (2003). Management of Procurement. (D. Bower, Ed.) (1st Editio). London: Thomas Telford.</p><p>Retrieved from http://www.thomastelford.com</p><p></p><p>Chung, L. P. (2006). IMPLEMENTATION STRATEGY FOR INDUSTRIALISED</p><p>BUILDING SYSTEM. Universiti Teknologi Malaysia (UTM).</p><p>https://doi.org/10.1017/CBO9781107415324.004</p><p></p><p>CIDB. (2002). Survey on Problems Faced by Contractors in Raising Finance.</p><p></p><p>CIDB. (2003). Industrialised building systems (IBS) - roadmap 2003-2010, (72), 124.</p><p></p><p>CIDB. (2007). Construction Industry Master Plan Malaysia 2006-2015. . Construction Industry </p><p>Development Board Malaysia. Retrieved from</p><p>http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Construction+In</p><p>dustry+Malaysia+Master+Plan,+Malaysia+2006-2015#0</p><p></p><p>CIDB. (2009). The Feasibility of Guaranteed Maximum Price (GMP) Contract for Public Sector</p><p>Construction Projects. Kuala Lumpur: CIDB</p><p></p><p>CIDB. (2010). IBS-Roadmap 2011-2015. Construction Industry Development Board Malaysia. </p><p>Retrieved from http://www.cidb.gov.my/cidbv4/?option=com_content&view=article&id=594:ibs-</p><p>roadmap-2011-2015&catid=57&Itemid=577&lang=en</p><p></p><p>CIDB. (2012). Report on the Effectiveness of Industrialised Building System (IBS) for Government</p><p>Projects (1st ed.). CIDB.</p><p></p><p>CIDB. (2015a). Construction Industry Transformation Programme (CITP) 2016-2020.</p><p>https://doi.org/10.1007/s13398-014-0173-7.2</p><p></p><p>CIDB. (2015b). IBS Digest. CIDB, 33.</p><p></p><p>CIDB. (2017). CITP Report No. 3 Q4 2017.</p><p></p><p>CIDB, MPC, REHDA, & CREAM. (2014). An Introduction of Industrialised Building System Manual for</p><p>Developer. CIDB.</p><p></p><p>Construction Industry Development Board (CIDB). (2018). Construction Industry Review & Prospect</p><p>2018 / 2019. (Construction Industry Development Board (CIDB), Ed.). Kuala Lumpur: Construction</p><p>Industry Development Board (CIDB).</p><p></p><p>Creswell, J. W. (2012). Overview of Mixed Methods Research in Dissemination and</p><p>Implementation.Thousand Oaks: SAGE Publications Inc</p><p></p><p>Creswell, J. W. (2013). Research Design: Qualitative, Quantitative and Mixed Methods Approaches</p><p>(4th ed.). Thousand Oaks: SAGE Publications Inc</p><p></p><p>Creswell, J. W., & Clark, V. L. P. (2011). Designing and Conducting Mixed Methods Research (2nd</p><p>ed.). SAGE.</p><p></p><p>Crosthwaite, D. (2000). The Global Construction Market: A Cross Sectional Analysis. Construction </p><p>Management and Economics, 18(5), 619627. https://doi.org/10.1080/014461900407428</p><p></p><p>Central Unit of Procurement (CUP). (1993). HM Treasury: Central Unit on Procurement ; Guidance</p><p>Note No 41 Managing Risks and Contigency for Works Projects. London: CUP</p><p></p><p>Dalalah, D., Al-oqla, F., & Hayajneh, M. (2010). Application of the Analytic Hierarchy Process (</p><p>AHP ) in Multi- Criteria Analysis of the Selection of Cranes. Jordan Journal of Mechanical and</p><p>Industrial Engineering, 4(5), 567578.</p><p></p><p>Morgan. (1998). The Focus Group Guidebook.Portland: SAGE Publications Inc</p><p></p><p>Department of Statistics (DOS). (2018). Quarterly Construction Statistics, Second Quarter 2018.</p><p>Department of Statistics, Malaysia, (February), 12. Retrieved from</p><p>https://www.statistics.gov.my/index.php?r=column/cthemeByCat&cat=77&bul_id</p><p>=RlBvVUUwNVZnb0NkL2I2UnBjOUZhUT09&menu_id=OEY5SWtFSVVFVU pmUXEyaHppMVhEdz09</p><p></p><p>Doloi, H. (2008). Application of AHP in improving construction productivity from a management</p><p>perspective. Construction Management and Economics, 26(8), 841 854.</p><p>https://doi.org/10.1080/01446190802244789</p><p></p><p>Egbu, C., & Abdullah, M. (2011). Industrialised Building System in Malaysia: Issues for Research in</p><p>Changing Financial and Property Market. In Proceedings of the BUHU 9th International Post Graduate</p><p>Research Conference. University of Salford. Retrieved from http://usir.salford.ac.uk/12820/</p><p></p><p>Engineering News Record (ENR). (2005). World Market Overview. Ohio: McGraw-Hill Construction,.</p><p></p><p>Fewings, P., & Henjewele, C. (2019). Construction Project Management. (Routledge, Ed.) (Third</p><p>Edit). New York: Routledge.</p><p></p><p>Franks, J., & Harlow, P. A. (1984). Building Procurement Systems: A Guide to Building Project</p><p>Management (2nd ed.). Chartered Institute of Building.</p><p></p><p>George, D., & Mallery, P. (2003). SPSS for Windows Step by Step: Answers to Selected Exercises. A</p><p>Simple Guide and Reference. https://doi.org/9780335262588</p><p></p><p>Gibb, A. G., & Isack, F. (2003). Re-engineering through pre-assembly - client expectations and</p><p>drivers. Building Research & Information, 31, 146160. https://doi.org/10.1080/09613210302000</p><p></p><p>Gibbons, J. H. (1986). Technology, Trade and the U.S. Residential Construction Industry.Washington,</p><p>DC:U.S. Government Printing Office</p><p></p><p>Glass, J. (2000). The Future for Precast Concrete in Low-Rise Housing.Oxford: British Precast</p><p></p><p>Hamouda, H., & Abu-shaaban, N. (2015). Enhancing Labour Productivity Within Construction Industry</p><p>Through Analytical Hierarchy Process , the Case of Gaza Strip, 3(8), 329336.</p><p>https://doi.org/10.13189/ujm.2015.03080</p><p></p><p>Hassim, S., Jaafar, M. S., & Sazalli, S. A. A. H. (2009). The Contractor Perception Towers</p><p>Industrialised Building System Risk in Construction Projects in Malaysia. American Journal of</p><p>Applied Sciences, 6(5), 937942.</p><p></p><p>Ibrahim, M., Mohammad, M., Nekooie, A., Binti, N., & Kamaruddin, C. (2012). The Adequacy of</p><p>Contractual Provisions in Managing Construction Failure in Malaysia. European Journal of Business</p><p>and Management, 4(1), 2238. Retrieved from</p><p>http://www.iiste.org/Journals/index.php/EJBM/article/view/1023/943</p><p></p><p>Jaafar, M., & Radzi, N. M. (2013). Level of Satisfaction and Issues with Procurement Systems used</p><p>in the Malaysian Public Sector. Australasian Journal of Construction Economics and Building, 13(1),</p><p>50.</p><p></p><p>Jalil, Ahmad Abd, Jaafar, M., Mydin, A. O., & Nuruddin, A. R. (2017). The Application of</p><p>Procurement Systems in IBS Housing Project. International Journal Supply Chain Management, 6(4),</p><p>299307.</p><p></p><p>Jalil, Ahmad Abd, Nuruddin, A. R., Jaafar, M., & Mydin, A. O. (2015). New Procurement Method for</p><p>Housing Projects Implementing IBS Modular System. In International Conference on Advances in Civil</p><p>and Environmental Engineering (pp. 18).</p><p></p><p>Jalil, Ahmad Abdul, Jaafar, M., Mydin, A. O., & Nuruddin, A. R. (2017). How Industry Players</p><p>Perceived Payment Issues in Industrialised Building System (IBS) Housing Projects? Malaysian</p><p>Construction Research Journal, 2(2), 2235.</p><p></p><p>James Dean Brown. (1996). Testing in Language Programs. (Dominick Mosco, Ed.).</p><p>New Jersey: Prentice Hall Regents.</p><p></p><p>Jenny Kitzinger. (2008). The Methodology of Focus Groups: The Importance of Interaction between</p><p>Research Participants. Sociology of Health & Illness, 16(1), 103121.</p><p>https://doi.org/10.1111/1467-9566.ep11347023</p><p></p><p>Southern, J. (2016). Smart Construction. Aberdeen: KPMG</p><p></p><p>Kamar, K.A.M., Hamid, Z. A., & Dzulkalnine, N. (2012). Industrialised Building System (IBS)</p><p>construction: Measuring the perception of contractors in Malaysia. In BEIAC 2012 - 2012 IEEE</p><p>Business, Engineering and Industrial Applications Colloquium.</p><p>https://doi.org/10.1109/BEIAC.2012.6226077</p><p></p><p>Kamar, K. A. M., & Hamid, Z. A. (2011). Supply chain strategy for contractor in adopting</p><p>industrialized building system (IBS). Australian Journal of Basic and Applied , 5(12), 25522557.</p><p>Retrieved from http://ajbasweb.com/old/ajbas/2011/December- 2011/2552-2557.pdf</p><p></p><p>Kamar, K. A. M., Hamid, Z. A., & Mustapha Alshawi. (2009). Barriers To Industrialized Building</p><p>System (IBS): The Case of Malaysia. In Built and Human Environment 9th International Postgraduate</p><p>Research Conference (pp. 116).</p><p></p><p>Kamar, K. A. M., Hamid, Z. A., Zain, M. Z. M., & Ahmad Hazim Abd. Rahim. (2008). Industrialised</p><p>Building Systems (IBS): The Current State Malaysia and R&D Initiatives. Construction Research</p><p>Institute of Malaysia (CREAM).</p><p></p><p>Kapliski, O., & Tamoaitiene, J. (2010). Game theory applications in construction engineering and</p><p>management. Technological and Economic Development of Economy, 16(2), 348363.</p><p>https://doi.org/10.3846/tede.2010.22</p><p></p><p>Khalfan, M. M. A., Mcdermott, P., & Vrijhoef, R. (2005). The effect of procurement on the</p><p>integration of the supply chain within the construction industry. In Understanding the</p><p>Construction Business and Companies (pp. 1425).</p><p></p><p>Krippendorff, K. (2012). Content Analysis: An Introduction to Its Methodology.</p><p>California:SAGE Publications.</p><p></p><p>Kuder, G. F., & Richardson, M. W. (1937). The theory of the estimation of test reliability.</p><p>Psychometrika, 2(3), 151160. https://doi.org/10.1007/BF02288391</p><p></p><p>Lessing, J., Stehn, L., & Ekholm, A. (2005). Industrialised Housing Definition and Categorization</p><p>of the Concept. In International Group of Lean Construction Conference no 13.</p><p></p><p>Lewis, W. A. (2014). W . Arthur Lewis s Theory of Economic Growth : a Review with 50 years of</p><p>Foresight Derick Boyd University of East London.</p><p></p><p>Li, H. X., Al-Hussein, M., Lei, Z., & Ajweh, Z. (2013). Risk identification and assessment of</p><p>modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation. Canadian</p><p>Journal of Civil Engineering, 40(12), 11841195. https://doi.org/10.1139/cjce-2013-0013</p><p></p><p>Lincoln, Y. S., & Guba, E. G. (1985). Naturalistic Inquiry. (C. Beverly Hills, Ed.). SAGE</p><p>Publications.</p><p></p><p>Losby, J., & Wetmore, A. (2012). Using Likert Scale in Evaluation Survey Work.</p><p>California:CDC.</p><p></p><p>Love, P. E. D. (2002). Influence of Project Type and Procurement Method on Rework Costs in Building</p><p>Construction Projects, (February), 1829.</p><p></p><p>Macharis, C., Springael, J., Brucker, K. De, & Verbeke, A. (2004). PROMETHEE and AHP: The Design of</p><p>Operational Synergies in Multicriteria Analysis: Strengthening PROMETHEE with Ideas of AHP.</p><p>European Journal of Operational Research. https://doi.org/10.1016/S0377-2217(03)00153-X</p><p></p><p>Malaysian Productivity Corporation (MPC). (2017a). Construction Labour Productivity in Malaysia.</p><p>Kuala Lumpur: MPC</p><p></p><p>Malaysian Productivity Corporation (MPC). (2017b). Summary of Issues and Recommendations.</p><p>Kuala Lumpur: Malaysia Productivity Corporation (MPC).</p><p></p><p>Mao, C., Xie, F., Hou, L., Wu, P., Wang, J., & Wang, X. (2016). Cost analysis for sustainable</p><p>off-site construction based on a multiple- case study in China. Habitat International, 57, 215222.</p><p>https://doi.org/10.1016/j.habitatint.2016.08.002</p><p></p><p>Marhani, M. A., Adnan, H., Baharuddin, H. E., Esa, M. R., & Hassan, A. A. (2012). Dependency of</p><p>Foreign Workers in Malaysian Construction Industry, 9(1), 3950.</p><p></p><p>Masterman, J. W. E. (2005). An Introduction to Building Procurement Systems. (J. W. E. Masterman,</p><p>Ed.) (Second). New York: Spon Press.</p><p></p><p>Melik, S. (2010). Cash Flow Analysis of Construction Projects Using. Middle East Technical</p><p>University.</p><p></p><p>Michnik, J., & Lo, M. (2005). Enhancement of Financial Risk Management With the Aid of Analytic</p><p>Hierarchy Process. In International Symposium on the Analytic Hierarchy Process.</p><p></p><p>Millet, I., & Wedley, W. C. (2002). Modelling Risk and Uncertainty with the Analytic Hierarchy</p><p>Process. Journal of Multi-Criteria Decision Analysis, 11(2), 97107.</p><p>https://doi.org/https://doi.org/10.1002/mcda.319</p><p></p><p>Miloevi, A., Miloevi, M., Miloevi, D., & Selimi, A. (2016). AHP Multi-Criteria Method for</p><p>Sustainable in Construction. In Conference Proceedings International Conference (pp. 929938).</p><p>https://doi.org/10.14415/konferencijaGFS</p><p></p><p>Ministry of Finance (MOF). (2008). Perlaksanaan Industrialised Building System (IBS) dalam projek</p><p>kerajaan (Vol. 3). Kuala Lumpur: MOF</p><p></p><p>Ministry of International Trade and Industry (MITI). (2019). Cabotage Policy. Retrieved from</p><p>https://www.miti.gov.my/index.php/glossary/term/184</p><p></p><p>Modular Building Institute. (2018). Modular Construction. Retrieved from</p><p>http://www.modular.org/HtmlPage.aspx?name=why_modular</p><p></p><p>Mohammed, A. H., & Ahmad, I. (2002). Pengurusan Projek Binaan: Pembiayaan dan Pengawalan Kos yang</p><p>Berkesan (2nd ed.). Dewan Bahasa dan Pustaka Kuala Lumpur.</p><p></p><p>Ghafar, M. N. A., (2003). Reka Bentuk Tinjauan Soal Selidik Pendidikan. Universiti Teknologi</p><p>Malaysia (UTM).</p><p></p><p>Morledge, R., & Smith, A. (2013). Building Procurement. (R. Morledge & A. Smith, Eds.) (2nd</p><p>Editio). Sussex: Wiley-Blacwell.</p><p></p><p>Moscarini, G., & Postel-Vinay, F. (2009). Large Employers Are More Cyclically Sensitive.</p><p>https://doi.org/10.3386/w14740</p><p></p><p>Musa, M. F., Mohammad, M. F., Yusof, M. R., & Mahbub, R. (2014). The Way Forward Industrialised</p><p>Building System (IBS) in Malaysia. In InCIEC 2014: Proceedings of the International Civil and</p><p>Infrastructure Engineering Conference 2014 (pp. 163 173). Springer.</p><p></p><p>Nawi, M. N. M., Lee, A., Kamar, K. A. M., & Hamid, Z. A. (2012). A Critical Literature Review on</p><p>the Concept of Team Integration in Industrialised Building System (IBS) Project. Malaysian</p><p>Construction Research Journal, 9(1), 17.</p><p></p><p>Nawi, M. N. M., Mydin, M. A. O., Nursal, A. T., Nifa, F. A. A., & Bahaudin, A. Y. (2015). Payment</p><p>issues in Malaysia Industrialised Building System ( IBS ): Literature visit Payment issues in</p><p>Malaysia Industrialised Building System ( IBS ): Literature visit. AENSI Journals, 9(4), 185188.</p><p></p><p>Nawi, N. M., Mydin, A. O., Nursal, A. T., Akmar, F., Nifa, A., & Hanafi, M. H. (2015). Payment</p><p>issues in Malaysia Industrialised Building System ( IBS ): A Research Framework, 9(March), 8891.</p><p></p><p>Nee, T. S., & Wei, C. L. (2013). Selection Criteria and the Related Sub-Criteria for the Selection</p><p>of Standard Form of Contract for Construction Projects in Sarawak. UNIMAS E-Journal of Civil</p><p>Engineering, 4(2), 3338.</p><p></p><p>Ngowi, A. B., Pienaar, E., & Mbachu, J. (2005). Globalisation of the construction industry: A</p><p>review of infrastructure financing. Journal of Financial Management of Property and Construction.</p><p>https://doi.org/http://dx.doi.org/10.1108/13664380680001079</p><p></p><p>NHBC Foundation. (2016). Modern Methods of Construction: views from the industry. IHS BRE </p><p> Press. Retrieved from</p><p>http://www.nhbcfoundation.org/Publications/Primary-Research/Modern-methods- of-construction-NF70</p><p></p><p>Nunnally, J. C., & Bernstein Ira H. (n.d.). Psychometric Theory (3rd ed.). New York: McGraw-Hill</p><p>Education (India) Pvt Limited.</p><p></p><p>Pan, W., Gibb, A. G. F., & Dainty, A. R. J. (2007). Perspectives of UK housebuilders on the use of</p><p>offsite modern methods of construction. Construction Management and Economics, 25(2), 183194.</p><p></p><p>Pan, W., Sidwell, R., Pan, W. E. I., & Sidwell, R. (2011). Demystifying the cost barriers to</p><p>offsite construction in the UK Demystifying the cost barriers to offsite construction in the UK.</p><p>Construction Management and Economics, 29(November 2014), 10811099.</p><p>https://doi.org/10.1080/01446193.2011.637938</p><p></p><p>Peldschus, F., Zavadskas, E. K., Turskis, Z., & Tamoaitiene, J. (2010). Sustainable Assessment of</p><p>Construction Site by Applying Game Theory. Inzinerine Ekonomika- Engineering Economics, 21(3),</p><p>223237.</p><p></p><p>Perera, N., & Sutrisna, M. (2010). The Use of Analytic Hierarchy Process (AHP) in the Analysis of</p><p>Delay Claims in Construction Projects in the UAE. The Built & Human Environment Review, 3(1),</p><p>2947.</p><p></p><p>Persatuan Arkitek Malaysia (PAM). (2010). ARCHITECT S PERSPECTIVE ON IBS.</p><p></p><p>Pozin, M. A. A., & Nawi, M. N. M. (2017). The communication in industrialised building system ( IBS</p><p>) construction project : Virtual environment The communication in industrialised building system (</p><p>IBS ) construction project : Virtual environment Mohd Affendi Ahmad Pozin , and Mohd Nasrun Mohd N.</p><p>In AIP Conference Proceedings (p. 7). https://doi.org/10.1063/1.5005358</p><p></p><p>Rakhmatullin, R. (2016). Learning Together: Peer Review Methodology. Seville: European Commision</p><p></p><p>Ramanathan, R. (2001). A note on the use of the analytic hierarchy process for environmental impact</p><p>assessment. Journal of Environmental Management, 63(1), 2735.</p><p>https://doi.org/10.1006/jema.2001.0455</p><p></p><p>Richard, R. B. (2006). Industrialised , Flexible and Demountable Building Systems : Quality ,</p><p>Economy and Sustainability. The CRIOCM 2006 International Symposium on Advancement of</p><p>Construction Management and Real Estate INDUSTRIALISED, (Richard 2005), 111.</p><p></p><p>Rogan, a L., Lawson, R. M., & Bates-Brkljac, N. (2000). Value and Benefits Assessment of Modular</p><p>Construction. In Modular Matters Conference (pp. 124). Retrieved from </p><p>http://www.designforhomes.org/wp-</p><p>content/uploads/2012/03/ModularSteel.pdf</p><p></p><p>Bruno, R. (2007). A Generic Classification of Industrialised Building System. In Open Building</p><p>Manufacturing: Core Concepts and Industrial Requirements (pp. 5366). ManuBuild. </p><p>Retrieved from</p><p>http://scholar.google.com/scholar?hl=en&btnG=Search&q=intitle:Open+Building+</p><p>Manufacturing+Core+Concepts+and+Industrial+Requirements#0%5Cnhttp://schol</p><p>ar.google.com/scholar?hl=en&btnG=Search&q=intitle:Open+Building+Manufactu</p><p>ring:+Core+Concepts+and+Industrial+</p><p></p><p>Saaty, T. L. (1980). The Analytic Hierarchy Process. New York: McGraw Hill.</p><p></p><p>Saaty, T. L. (2008). Decision making with the analytic hierarchy process. International Journal of</p><p>Services Sciences, 1(1), 83. https://doi.org/10.1504/IJSSCI.2008.017590</p><p></p><p>Saaty, T. L., & Vargas, L. G. (2012). Models, Methods, Concepts & Applications of the Analytic</p><p>Hierarchy Process. Pittsburgh:Springer.</p><p></p><p>Sajjad Zahir. (1999). Clusters in a Group: Decision Making in the Vector Space Formulation of the</p><p>Analytic Hierarchy Process. European Journal of Operational Research.</p><p>https://doi.org/10.1016/S0377-2217(98)00021-6</p><p></p><p>Sekaran, U., & Bougie, R. (2010). Research Methods for Business: A Skill Building Approach (5th</p><p>ed.). Chichester: John Wiley & Sons.</p><p></p><p>Serrano-Cinca, C., & Gutirrez-Nieto, B. (2013). A Decision Support System for Financial and </p><p>Social Investment. Applied Economics. https://doi.org/10.1080/00036846.2012.748180</p><p></p><p>Sherri, L. Jackson. (2012). Research Methods and Statistics: A Critical Approach (4th Editio).</p><p>Belmont: Cengage Learning.</p><p></p><p>Shukor, A. S. A., Mohammad, M. F., Mahbub, R., & Faridah Ismail. (2011). Supply chain integration</p><p>challenges in project procurement in Malaysia: The perspective of IBS manufacturers. Association of</p><p>Researchers in Construction Management, ARCOM 2011 - Proceedings of the 27th Annual Conference,</p><p>1(September 2011), 495504. Retrieved from </p><p>http://www.scopus.com/inward/record.url?eid=2-s2.0-</p><p>84861044849&partnerID=40&md5=37bdafccb50a60d54b5a33e07bfb80d7</p><p></p><p>Stewart, D. W., & Shamdasani, P. N. (2015). Focus Group: Theory and Practices (3rd ed.). Portland:</p><p>SAGE.</p><p></p><p>Sum, R. M. (2013). Risk Management Decision Making. In Proceeding of the International Symposium on</p><p>the Analytic Hierarchy Process. Retrieved from www.cranfield.ac.uk/cds/cfda</p><p></p><p>Tabish, S. Z. S., & Jha, K. N. (2011). Construction Management and Economics Identification and</p><p>evaluation of success factors for public construction projects Identification and evaluation of</p><p>success factors for public construction projects. Construction Management and Economics, </p><p>29(8), 809823. https://doi.org/10.1080/01446193.2011.611152</p><p></p><p>Thanoon, W. A., Peng, L. W., Kadir, M. R. A., Jaafar, M. S., & Salit, M. S. (2003). the Essential</p><p>Characteristics of Industrialised Building System. International Conference on Industrialised</p><p>Building Systems, Kuala Lumpur, Malaysia, (1999), 1011.</p><p></p><p>Todd D. Jick. (1979). Mixing Qualitative and Quantitative Methods: Triangulation in Action.</p><p>Administrative Science Quarterly, 24(4), 602611.</p><p></p><p>Torki, L., Dalali Isfahani, R., & Rezai, A. (2013). Ranking of financial and electronic debts using</p><p>analytic hierarchy process (AHP). New Marketing Research Journal, 2130.</p><p>https://doi.org/10.1109/ECDC.2013.6556751</p><p></p><p>Trikha, D. N., & Ali, A. A. A. (2004). Industrialised Building Systems. Universiti Putra Malaysia</p><p>(UPM).</p><p></p><p>Vichare, V. K., Aher, M. C., & Devalkar, R. V. (2015). Application Of Analytical Hierarchy Process</p><p>In Construction Of Residential Building Project. International Journal of Modern Trends in</p><p>Engineering and Research. Retrieved from www.ijmter.com</p><p></p><p>Vignesh, S., & Shanmugapriya, S. (2016). Improvement of Decision Making Process in Construction</p><p>Supply Chain Management using Analytical Hierarchy. International Journal of Emerging Technology</p><p>and Advanced Engineering, 6(4), 109118.</p><p></p><p>Vrijhoef, R. (1998). Co-makership in Construction towards Construction Supply Chain Management.</p><p>Delft University of Technology.</p><p></p><p>Walker, A. (2015). Project Management in Construction (1st ed.). Sussex: Wiley Blackwell.</p><p></p><p>Whitaker, R. (2007). Validation examples of the Analytic Hierarchy Process and Analytic</p><p>Network Process. Mathematical and Computer Modelling, 46, 840859.</p><p>https://doi.org/10.1016/j.mcm.2007.03.018</p><p></p><p>Wiley, J. (1984). Construction Funding: Where the Money Comes From (2nd ed.).</p><p>Sussex: A Wiley-Interscience Publication.</p><p></p><p>Xue, H., Zhang, S., Su, Y., & Wu, Z. (2017). Factors Affecting the Capital Cost of Prefabrication </p><p>A Case Study of China. Sustainability Journal, 1512(7), 122. https://doi.org/10.3390/su9091512</p><p></p><p>Xue, H., Zhang, S., Su, Y., & Wu, Z. (2018). Capital Cost Optimization for Prefabrication : A</p><p>Factor Analysis Evaluation Model. Journal of Sustainability, 159(10), 122.</p><p>https://doi.org/10.3390/su10010159</p><p></p><p>Yousefi, V., Golkhandan, A. R., Kiani, S., Yakhchali, S. H., & Mehrabanfar, E. (2015). Ranking of</p><p>Financing Methods in Iran Construction Renovation Projects: A Sensitivity Analysis Approach.</p><p>Mediterranean Journal of Social Sciences, 6(5S2), 303309.</p><p>https://doi.org/10.5901/mjss.2015.v6n5s2p303</p><p></p><p>Zakaria, Z., Ismail, S., & Yusof, A. M. (2013). An Overview of Comparison between Construction</p><p>Contracts in Malaysia : The Roles and Responsibilities of Contract Administrator in Achieving Final</p><p>Account Closing Success. In International Conference on Education and Educational Technologies (pp.</p><p>3441).</p><p></p><p>Zala, M. I., & Bhatt, R. B. (2011). An Approach of Contractor Selection By Analytical Heirarchy</p><p>Process. In National Conference on Recent Trends in Engineering & Technology (pp. 16).</p><p></p><p>Zawawi, M. (2009). Effectiveness of Industrialised Building System (IBS) Implementation for</p><p>Malaysian Construction Industry. Skudai: UTM</p><p></p><p>Zimmer, S., Klumpp, M., & Abidi, H. (2012). Industry Project Evaluation with the Analytic Hierarchy</p><p>Process. In Information Security Conference. Retrieved from</p><p>www.fom-ild.de</p><p></p>