Implementation of a systematic production plan in a make to order company /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01371cam a2200337 i 4500 | ||
---|---|---|---|
001 | u1001233 | ||
003 | SIRSI | ||
005 | 201408201204 | ||
008 | 140820s2014 my a t 000 0 eng m | ||
040 | |a UMM |d UMJ |e rda | ||
090 | |a TS176 |b UM 2014 Lia | ||
097 | |a TS176 |b UM 2014 Lia | ||
100 | 1 | |a Liau, Yee Yeng, |e author. | |
245 | 1 | 0 | |a Implementation of a systematic production plan in a make to order company / |c Liau Yee Yeng. |
264 | 1 | |c 2014. | |
264 | 4 | |c 2014. | |
300 | |a xi, 71 leaves : |b illustrations ; |c 30 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
502 | |b M.Eng. |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya |d 2014. | ||
504 | |a Bibliography: leaves 70-71. | ||
650 | 0 | |a Production planning. | |
650 | 0 | |a Production control. | |
650 | 0 | |a Manufacturing processes |x Automation. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Mekanik, |e degree granting institution. | |
900 | |a HA | ||
596 | |a 1 7 | ||
999 | |a TS176 UM 2014 LIA |w LC |c 1 |i A516152237 |d 27/2/2015 |f 27/2/2015 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 27/2/2015 | ||
999 | |a TS176 UM 2014 LIA |w LC |c 2 |i A516154343 |d 27/2/2015 |f 27/2/2015 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 27/2/2015 | ||
999 | |a TS176 UM 2014 LIA |w LC |c 1 |i A515879981 |d 18/5/2015 |f 18/5/2015 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 14/5/2015 |