Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage : the relationship with project performance /

Saved in:
Bibliographic Details
Main Author: Wong, Phui Fung (Author)
Format: Thesis Book
Language:English
Published: 2015.
Subjects:
Online Access:http://studentsrepo.um.edu.my/5852/
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01447cam a2200349 i 4500
001 u1019175
003 SIRSI
005 201507311035
008 150731s2015 my a m 000 0 eng
040 |a UMM  |d AUM  |e rda 
090 |a TH145  |b UMP 2015 Won 
100 1 |a Wong, Phui Fung,  |e author. 
245 1 0 |a Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage :  |b the relationship with project performance /  |c Wong Phui Fung. 
264 1 |c 2015. 
264 4 |c  2015. 
300 |a xix, 312 leaves :  |b illustrations ;  |c 30 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b Ph.D  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya  |d 2015. 
504 |a Bibliography: leaves 255-293. 
530 |a Also issued in CD. 
650 0 |a Building information modeling. 
650 0 |a Building  |x Estimates. 
650 0 |a Quantity surveying. 
650 0 |a Construction industry  |x Management. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
856 4 1 |u http://studentsrepo.um.edu.my/5852/ 
900 |a NSR NSM 
596 |a 1 25 
999 |a TH145 UMP 2015 WON  |w LC  |c 1  |i A516239052  |d 1/10/2018  |e 1/10/2018  |f 25/11/2016  |g 1  |l STACKS  |m P01UTAMA  |n 2  |r Y  |s Y  |t TESIS  |u 23/11/2016  |1 STEM 
999 |a TH145 UMP 2015 WON  |w LC  |c 1  |i A516238984  |d 16/10/2018  |f 16/10/2018  |g 1  |l STACKS  |m P25UMARCHI  |r N  |s Y  |t CD  |u 16/10/2018  |1 STEM