Assessment of permit-to-work (PTW) system in a pipeline operator company /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2017.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/8455/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01440cam a2200325 i 4500 | ||
---|---|---|---|
001 | u1077040 | ||
003 | SIRSI | ||
005 | 201803091624 | ||
008 | 180309s2017 my a m 000 0 eng | ||
040 | |a UMM |d UMJ |d AUM |e rda | ||
090 | |a TD7 |b UM 2017 Fadnab | ||
097 | |a TD7 |b UM 2017 Fadnab | ||
100 | 0 | |a Fadiyatul Nabilah Abu Bakar, |e author. | |
245 | 1 | 0 | |a Assessment of permit-to-work (PTW) system in a pipeline operator company / |c Fadiyatul Nabilah Binti Abu Bakar. |
264 | 1 | |c 2017. | |
300 | |a xi, 56 leaves, 1 unnumbered page : |b illustrations ; |c 30 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
502 | |b M.Eng. |c Jabatan Kejuruteraan Kimia, Fakulti Kejuruteraan, Universiti Malaya |d 2017. | ||
504 | |a Bibliography: leaves 45-50. | ||
650 | 0 | |a Pipelines |x Safety measures. | |
650 | 0 | |a Industrial safety. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Kimia, |e degree granting institution. | |
856 | 4 | 1 | |u http://studentsrepo.um.edu.my/8455/ |
596 | |a 1 7 25 | ||
900 | |a NSM AMA | ||
999 | |a TD7 UM 2017 FADNAB |w LC |c 1 |i A517082489 |d 23/5/2018 |f 23/5/2018 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 4/5/2018 |1 STEM | ||
999 | |a TD7 UM 2017 FADNAB |w LC |c 1 |i A516961526 |d 5/7/2018 |f 5/7/2018 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 5/7/2018 |1 STEM | ||
999 | |a TD7 UM 2017 FADNAB |w LC |c 1 |i A517696513 |f 22/8/2023 |g 1 |l STACKS |m P25UMARCHI |r N |s Y |t CD |u 22/8/2023 |1 STEM |o .STAFF. MST-CD9202 |