A study of the intervention measure undertaken by the government in the construction of the native courts in Sabah and its relation to the issue of time overrun /
Saved in:
Main Author: | Zamlee Sabanah (Author) |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2018.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018) -
Maintenance management of Sekolah Agama Rakyat in Kelantan / Mohd Khairul Mat Jusoh
by: Mat Jusoh, Mohd Khairul
Published: (2008) -
An enhancement of the application for fast track arbitration in the Malaysian construction industry / Nur Khodijah Muhammad Fadhlullah Ng
by: Muhammad Fadhlullah Ng, Nur Khodijah
Published: (2020) -
Study on mitigation factors for controlling cost overrun in construction project
by: Abdullah, Fatehi Mansoor Saad
Published: (2018) -
Extensions of time in standard forms of construction contracts in Malaysia /
by: Lim, Chwee Chen
Published: (2005)