To study the external factors affecting delays in project : case study on Petronas's Refinery And Petrochemical Integrated Development (RAPID) project /

Saved in:
Bibliographic Details
Main Author: Faryanti Zalani (Author)
Format: Thesis Book
Language:English
Published: 2017.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01207cam a2200313 i 4500
001 u1102263
003 SIRSI
005 201812131049
008 181213s2017 my a t 000 0 eng
040 |a UMAB  |e rda 
043 |a a-my--- 
097 |a TH435  |b UM 2017 Farz 
100 0 |a Faryanti Zalani.,  |e author 
245 1 0 |a To study the external factors affecting delays in project :  |b case study on Petronas's Refinery And Petrochemical Integrated Development (RAPID) project /  |c Faryanti binti Zalani. 
264 1 |c 2017. 
264 4 |c  2017. 
300 |a xv, 71 leaves :  |b illustrations ;  |c 30cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Sc (Project Mgmt.)  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya,  |d 2017. 
504 |a Bibliography: leaves 64-68. 
650 0 |a Construction industry  |z Malaysia. 
650 0 |a Construction industry  |x Management  |z Malaysia. 
650 0 |a Production scheduling. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
900 |a HF 
596 |a 11 
999 |a TH435 UM 2017 FARZ  |w LC  |c 1  |i A517158253  |f 11/4/2019  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 10/4/2019