Water hammer analysis on high pressure due to stopping pump /

Saved in:
Bibliographic Details
Main Author: Nur Zalynda Zakaria (Author)
Format: Thesis Book
Language:English
Published: 2019.
Subjects:
Online Access:http://studentsrepo.um.edu.my/11426/
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01504cam a2200349 i 4500
001 u1114640
003 SIRSI
005 201905091503
008 190509s2019 my a m 000 0 eng
040 |a UMM  |d UMJ  |e rda 
090 |a TJ7  |b UM 2019 Nurzz 
097 |a TJ7  |b UM 2019 Nurzz 
100 0 |a Nur Zalynda Zakaria,  |e author. 
245 1 0 |a Water hammer analysis on high pressure due to stopping pump /  |c Nur Zalynda Zakaria. 
264 1 |c 2019. 
300 |a xiii, 60 leaves :  |b illustrations (some colours) ;  |c 30 cm 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Eng.  |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya  |d 2019. 
504 |a Bibliography: leaves 59-60. 
530 |a Also issued in CD. 
650 0 |a Water hammer. 
650 0 |a Water-pipes  |x Design and construction. 
650 0 |a Piping  |x Design and construction. 
710 2 |a Universiti Malaya.  |b Jabatan Kejuruteraan Mekanik,  |e degree granting institution. 
596 |a 1 7 
856 4 1 |u http://studentsrepo.um.edu.my/11426/ 
900 |a NSM AMA 
999 |a TJ7 UM 2019 NURZZ  |w LC  |c 1  |i A517374915  |f 29/5/2019  |g 1  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 29/5/2019  |1 STEM  |o .STAFF. CD & Agreement disimpan di Perpustakaan Kejuruteraan 
999 |a TJ7 UM 2019 NURZZ  |w LC  |c 1  |i A517446705  |f 7/7/2020  |g 1  |l STACKS  |m P07JURUTER  |r N  |s Y  |t TESIS  |u 7/7/2020  |1 STEM 
999 |a TJ7 UM 2019 NURZZ  |w LC  |c 2  |i A517446691  |f 7/7/2020  |g 1  |l COUNTER  |m P07JURUTER  |r N  |s Y  |t CD  |u 7/7/2020  |1 STEM