A quantitative study to the communication effectiveness and barriers in construction project at Malaysia /

Saved in:
Bibliographic Details
Main Author: Chang, Fuk Wei (Author)
Format: Thesis Book
Language:English
Published: 2019.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01335cam a2200325 i 4500
001 u1117213
003 SIRSI
005 201906261027
008 190626s2019 my a t 000 0 eng m
040 |a UMAB  |e rda 
043 |a a-my--- 
097 |a TH435  |b UM 2019 Cha 
100 1 |a Chang, Fuk Wei.,  |e author 
245 1 2 |a A quantitative study to the communication effectiveness and barriers in construction project at Malaysia /  |c Chang Fuk Wei. 
264 1 |c 2019. 
264 4 |c  2019. 
270 1 |g Othman Mohamed.  |a Universiti Malaya. Fakulti Alam Bina. Jabatan Ukur Bahan. 
300 |a xi, 79 leaves :  |b illustrations ;  |c 30 cm + 1 computer disc ;  |c 12 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Sc. (P.Mgmt)  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya  |d 2019. 
504 |a Bibliography: leaves 74-78. 
650 0 |a Construction industry  |x Communication systems. 
650 0 |a Construction industry  |z Malaysia. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
900 |a HF 
596 |a 11 
999 |a TH435 UM 2019 CHA  |w LC  |c 1  |i A517157791  |f 11/11/2019  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 26/6/2019 
999 |a TH435 UM 2019 CHA  |w LC  |c 2  |i A517159660  |f 11/11/2019  |g 1  |l COUNTER  |m P11ALMBINA  |r Y  |s Y  |t CD  |u 11/11/2019