Chan, K. P. (2019). A workflow on 4D planning and scheduling using synchro: A case study on commercial building.
Chicago Style (17th ed.) CitationChan, Kwok Pong. A Workflow on 4D Planning and Scheduling Using Synchro: A Case Study on Commercial Building. 2019.
MLA引文Chan, Kwok Pong. A Workflow on 4D Planning and Scheduling Using Synchro: A Case Study on Commercial Building. 2019.
警告:這些引文格式不一定是100%准確.