A workflow on 4D planning and scheduling using synchro : a case study on commercial building /

Saved in:
Bibliographic Details
Main Author: Chan, Kwok Pong (Author)
Format: Thesis Book
Language:English
Published: 2019.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01284cam a2200337 i 4500
001 u1117248
003 SIRSI
005 201906261207
008 190626s2019 my a t 000 0 eng m
040 |a UMAB  |e rda 
043 |a a-my--- 
097 |a TH435  |b UM 2019 Cha 
100 1 |a Chan, Kwok Pong.,  |e author 
245 1 2 |a A workflow on 4D planning and scheduling using synchro :  |b a case study on commercial building /  |c Chan Kwok Pong. 
264 1 |c 2019. 
264 4 |c  2019. 
270 1 |g Loo Siaw Chuing.  |a Universiti Malaya. Fakulti Alam Bina. Jabatan Ukur Bahan. 
300 |a xiv, 123 leaves :  |b illustrations ;  |c 30 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Sc. (P.Mgmt)  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya  |d 2019. 
504 |a Bibliography: leaves 120-122. 
650 0 |a Building information modeling. 
650 0 |a Building  |x Data processing. 
650 0 |a Commercial buildings  |x Design and construction. 
650 0 |a Construction industry  |z Malaysia. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
900 |a HF 
596 |a 11 
999 |a TH435 UM 2019 CHA  |w LC  |c 1  |i A517157730  |f 12/11/2019  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 26/6/2019