Mitigation of delay : a case study of oil and gas platform project /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2016.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01172cam a2200313 i 4500 | ||
---|---|---|---|
001 | u1117317 | ||
003 | SIRSI | ||
005 | 201906261704 | ||
008 | 190626s2016 my a t 000 0 eng m | ||
040 | |a UMAB |e rda | ||
043 | |a a-my--- | ||
097 | |a TH435 |b UM 2016 Sur | ||
100 | 0 | |a Surendran Ganesan. |e author | |
245 | 1 | 0 | |a Mitigation of delay : |b a case study of oil and gas platform project / |c Surendran a/l Ganesan. |
264 | 1 | |c 2016. | |
264 | 4 | |c 2016. | |
270 | 1 | |g Mohd Suhaimi Mohd Danuri. |a Universiti Malaya. Fakulti Alam Bina. Jabatan Ukur Bahan. | |
300 | |a xi, 118 leaves : |b illustrations ; |c 30 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
502 | |b M.Sc. (P.Mgmt) |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya |d 2016. | ||
504 | |a Bibliography: leaves 108-119. | ||
650 | 0 | |a Construction industry |x Management. | |
650 | 0 | |a Construction projects |z Malaysia. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
900 | |a HF | ||
596 | |a 11 | ||
999 | |a TH435 UM 2016 SUR |w LC |c 1 |i A517157859 |f 12/11/2019 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 26/6/2019 |