The development of cost estimation model for Indonesian state building : the case of West Sumatera province /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2019.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/10512/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01342cam a2200313 i 4500 | ||
---|---|---|---|
001 | u1119393 | ||
003 | SIRSI | ||
005 | 201907240943 | ||
008 | 190724s2019 my a t 000 0 eng m | ||
040 | |a UMAB |e rda | ||
097 | |a TH435 |b UMP 2019 Jum | ||
100 | 1 | |a Jumas, Dwi Fitra Yenti ., |e author | |
245 | 1 | 4 | |a The development of cost estimation model for Indonesian state building : |b the case of West Sumatera province / |c Dwi Fitra Yenti Jumas. |
264 | 1 | |c 2019. | |
264 | 4 | |c 2019. | |
270 | 1 | |g Mohd Suhaimi Mohd Danuri. |a Universiti Malaya. Fakulti Alam Bina. Jabatan Ukur Bahan | |
300 | |a xvii, 218 leaves : |b illustrations ; |c 30 cm + |e 1 computer optical disc (4 3/4 in.) | ||
502 | |b Ph.D |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya, |d 2019. | ||
504 | |a Bibliography: leaves 195-211. | ||
530 | |a Also issued in CD. | ||
650 | 0 | |a Computer software |x Development. | |
650 | 0 | |a Product life cycle. | |
650 | 0 | |a Buildings |z Indonesia. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
856 | 4 | 1 | |u http://studentsrepo.um.edu.my/10512/ |
900 | |a HF | ||
596 | |a 11 | ||
999 | |a TH435 UMP 2019 JUM |w LC |c 1 |i A517363983 |f 16/8/2019 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 26/7/2019 | ||
999 | |a TH435 UMP 2019 JUM |w LC |c 2 |i A517364017 |f 16/8/2019 |g 1 |l COUNTER |m P11ALMBINA |r Y |s Y |t CD |u 16/8/2019 |