The potential of Building Information Modelling (BIM) in improving project time management in the Malaysian construction industry /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2020.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01295cam a2200313 i 4500 | ||
---|---|---|---|
001 | u1135743 | ||
003 | SIRSI | ||
005 | 202007290822 | ||
008 | 200729s2020 my a m 000 0 eng | ||
040 | |a UMAB |e rda | ||
043 | |a a-my--- | ||
097 | |a TH435 |b UM 2020 Mahka | ||
100 | 0 | |a Mahmoud Khaalleefah Abdulhamid Alabeedi., |e author. | |
245 | 1 | 4 | |a The potential of Building Information Modelling (BIM) in improving project time management in the Malaysian construction industry / |c Mahmoud Khaalleefah Abdulhamid Alabeedi. |
264 | 1 | |c 2020. | |
264 | 4 | |c 2020. | |
300 | |a xvi, 160 leaves : |b illustrations ; |c 30 cm. | ||
500 | |a Also issued in CD. | ||
502 | |b M.(P.Mgmt) |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya |d 2020. | ||
504 | |a Bibliography : |b leaves 138-155. | ||
650 | 0 | |a Building information modeling. | |
650 | 0 | |a Building |x Data processing. | |
650 | 0 | |a Construction industry |z Malaysia. | |
650 | 0 | |a Project management. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
900 | |a HF | ||
596 | |a 11 | ||
999 | |a TH435 UM 2020 MAHKA |w LC |c 1 |i A517371429 |f 28/12/2020 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 16/10/2020 | ||
999 | |a TH435 UM 2020 MAHKA |w LC |c 2 |i A517357798 |f 15/4/2021 |g 1 |l COUNTER |m P11ALMBINA |r Y |s Y |t CD |u 15/4/2021 |