Architect's perception of factors contributing to construction project delay in planning & design phase : case studies of private housing projects in Klang Valley, Malaysia /
Saved in:
Main Author: | Ong, Wee Yeak (Author) |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2022.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/14124/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Project team integration at planning stage at government military infrastructure project /
by: Zulnorren Ab Karim
Published: (2019) -
Mitigation of delay : a case study of oil and gas platform project /
by: Surendran Ganesan
Published: (2016) -
Lack of awareness among contractor in project management: delay construction / Suria Yaacob
by: Yaacob, Suria
Published: (2006) -
Modular system implementation case study of the infrastructure project in Malaysia /
by: Suheil Sarib Hassan
Published: (2020) -
Categorisation of project complexity factors in Malaysian construction industry /
by: Abdou, Saed M.
Published: (2018)