Architect's perception of factors contributing to construction project delay in planning & design phase : case studies of private housing projects in Klang Valley, Malaysia /
Saved in:
主要作者: | Ong, Wee Yeak (Author) |
---|---|
格式: | Thesis 图书 |
语言: | English |
出版: |
2022.
|
主题: | |
在线阅读: | http://studentsrepo.um.edu.my/14124/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
Project team integration at planning stage at government military infrastructure project /
由: Zulnorren Ab Karim
出版: (2019) -
Mitigation of delay : a case study of oil and gas platform project /
由: Surendran Ganesan
出版: (2016) -
Lack of awareness among contractor in project management: delay construction / Suria Yaacob
由: Yaacob, Suria
出版: (2006) -
Modular system implementation case study of the infrastructure project in Malaysia /
由: Suheil Sarib Hassan
出版: (2020) -
Categorisation of project complexity factors in Malaysian construction industry /
由: Abdou, Saed M.
出版: (2018)