Project management case study - development of iron ore processing plant /

Saved in:
Bibliographic Details
Main Author: Yap, Park Wah (Author)
Format: Thesis Book
Language:English
Published: 2022.
Subjects:
Online Access:http://studentsrepo.um.edu.my/13636/
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01429nam a2200361 i 4500
001 u1155006
003 SIRSI
005 202204111541
008 220411s2022 my a m 000 0 eng
040 |a UMM  |d UMJ  |e rda 
090 |a TJ7  |b UM 2022 Yap 
097 |a TJ7  |b UM 2022 Yap 
100 1 |a Yap, Park Wah,  |e author. 
245 1 0 |a Project management case study - development of iron ore processing plant /  |c Yap Park Wah. 
264 1 |c 2022. 
300 |a xiii, 87 leaves :  |b illustrations ;  |c 30 cm 
336 |a text  |2 rdacontent 
336 |a still image  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Eng.  |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya  |d 2022. 
504 |a Bibliography: leaves 78-79. 
530 |a Also issued in CD. 
650 0 |a Project management. 
650 0 |a Industrial management. 
650 0 |a Iron ores. 
650 0 |a Factory management  |x Case studies. 
710 2 |a Universiti Malaya.  |b Jabatan Kejuruteraan Mekanik,  |e degree granting institution. 
856 4 1 |u http://studentsrepo.um.edu.my/13636/ 
900 |a FNM US 
596 |a 1 7 
999 |a TJ7 UM 2022 YAP  |w LC  |c 1  |i A517727785  |f 27/6/2022  |g 1  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 11/4/2022  |1 STEM  |o .STAFF. TERIMA DARI P. KEJURUTERAAN TANPA CD & SURAT AGREEMENT. 
999 |a TJ7 UM 2022 YAP  |w LC  |c 1  |i A517746740  |f 4/8/2022  |g 1  |l STACKS  |m P07JURUTER  |r Y  |s Y  |t TESIS  |u 4/8/2022  |1 STEM