Project management case study - development of iron ore processing plant /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2022.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/13636/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01429nam a2200361 i 4500 | ||
---|---|---|---|
001 | u1155006 | ||
003 | SIRSI | ||
005 | 202204111541 | ||
008 | 220411s2022 my a m 000 0 eng | ||
040 | |a UMM |d UMJ |e rda | ||
090 | |a TJ7 |b UM 2022 Yap | ||
097 | |a TJ7 |b UM 2022 Yap | ||
100 | 1 | |a Yap, Park Wah, |e author. | |
245 | 1 | 0 | |a Project management case study - development of iron ore processing plant / |c Yap Park Wah. |
264 | 1 | |c 2022. | |
300 | |a xiii, 87 leaves : |b illustrations ; |c 30 cm | ||
336 | |a text |2 rdacontent | ||
336 | |a still image |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
502 | |b M.Eng. |c Jabatan Kejuruteraan Mekanik, Fakulti Kejuruteraan, Universiti Malaya |d 2022. | ||
504 | |a Bibliography: leaves 78-79. | ||
530 | |a Also issued in CD. | ||
650 | 0 | |a Project management. | |
650 | 0 | |a Industrial management. | |
650 | 0 | |a Iron ores. | |
650 | 0 | |a Factory management |x Case studies. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Mekanik, |e degree granting institution. | |
856 | 4 | 1 | |u http://studentsrepo.um.edu.my/13636/ |
900 | |a FNM US | ||
596 | |a 1 7 | ||
999 | |a TJ7 UM 2022 YAP |w LC |c 1 |i A517727785 |f 27/6/2022 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 11/4/2022 |1 STEM |o .STAFF. TERIMA DARI P. KEJURUTERAAN TANPA CD & SURAT AGREEMENT. | ||
999 | |a TJ7 UM 2022 YAP |w LC |c 1 |i A517746740 |f 4/8/2022 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 4/8/2022 |1 STEM |